Power System Studies

Electrical studies for generator-backed systems: maximum demand, load flow, short circuit, coordination, arc flash, motor starting and harmonics.

In short. Electrical studies turn a list of equipment into evidence that a power system will work. They show that cables and transformers carry the load and that voltage holds when motors start. They show that breakers can clear the worst fault, and that the nearest one trips first. They also show that the system behaves on generator supply as well as on mains. Not every site needs every study. Start from the problem or project, choose the studies it actually needs, and do them in the right order.

Who this section is for: For consultants, plant and facility engineers and owners planning, checking or troubleshooting generator-backed electrical systems.

Key facts

  • Every study starts from an accurate single-line diagram and load list.
  • The usual order is load, then short-circuit, then protection coordination.
  • Generator fault current is far lower than the grid’s; check both.
  • Motor starting and load steps often decide the generator size.
  • Harmonic distortion is higher on generator supply, so study both sources.
  • A study should end with actions, not just a report.

How this section is organised

GroupQuestions it answersStart with
FoundationsWhat do we have, and what does it draw?Single-line diagrams
Load and demandHow much load, and how much at once?Maximum demand
Fault levelsCan equipment withstand and clear the worst fault?Short-circuit studies
ProtectionDoes the nearest device trip first?Coordination workflow
Generator performanceCan the set start motors and take load steps?Generator sizing studies
Power qualityHarmonics, power factor and unbalanceHarmonic studies
Earthing and surgesIs the site safe during faults and lightning?Earthing studies
Reliability and redundancyWhat survives a failure?N+1 and 2N
Existing sites and growthWhat changes when we expand?Brownfield studies

Worked example: the studies for a factory adding a second generator (illustrative)

OrderStudyWhat it decides
1Single-line diagram surveyCorrected drawings before any calculation
2Load list and maximum demandDemand rising from 650 to 900 kW
3Generator sizing and motor startingSecond set in parallel; soft starter on the largest motor
4Short-circuit, both sets and mainsMain board rating adequate
5Protection coordinationFeeder settings changed so faults still clear on generator
6Synchronising and parallelingLoad sharing and closing checks before commissioning

Doing the studies in this order means no study has to be redone. See study inputs.

Do not commission protection settings without a short-circuit study, or size a generator without checking motor starting. Both are common causes of trips that a study would have prevented.

Where to start

If your question is…Start with
Which study does my problem need?Problem to study selection
Starting large motors on a generatorLarge-motor starting
Arc-flash hazardArc-flash studies
Paralleling with the gridUtility-generator interconnection

Before you ask for a study

ItemReady?
Up-to-date single-line diagram 
Load list with motor sizes and starters 
Transformer, generator and cable data 
Protection settings and any event records 

What to send us

Send your single-line diagram, load list and the question you need answered. WhatsApp 98852 01608 or use the application engineering enquiry.

All 42 guides in this section

Questions engineers ask

Does every generator project need a short-circuit study?

Not every small installation, but any project with paralleled sets, large transformers, or switchgear near its fault rating should have one, because generator and grid fault levels differ widely. The study checks every source combination, so that breakers are rated for the highest fault level and protection still operates at the lowest, which on generator supply can be much smaller than on mains.

What inputs does an electrical study need?

A single-line diagram, load list, cable lengths and sizes, transformer and generator data, and protection settings. Missing data is the most common cause of unreliable studies. A site survey confirms the drawings against what is installed, and any assumption that cannot be checked is listed in the report with its effect on the results.