Electrical Study Inputs, Assumptions and Validation Guide

What data an electrical study needs, how to record assumptions, how to validate inputs against measurement and nameplates, and how to document sensitivity so results can be trusted and reviewed.

In short. An electrical study is only as good as its inputs. Software turns rough data into precise-looking numbers, so every study must show what data it used, where each value came from, what was assumed and how it was checked. Validate the model against nameplates and measurements, test the conclusion against the least certain inputs, and keep the model under version control. That is what makes a short-circuit, load-flow or coordination study defensible.

Who this page is for: For consultants, plant engineers and owners commissioning or accepting a power-system study, who need to know whether its inputs can be trusted.

Key facts

  • Every input should be graded as measured, documented, typical or assumed.
  • An assumption register records each assumption’s value, source, owner and effect if wrong.
  • Validate against nameplates, test certificates and site measurements, plus one hand calculation.
  • Run sensitivity cases on the least certain inputs; if the conclusion changes, get better data.
  • Generator studies need the alternator’s reactances and excitation type for the exact frame.
  • Version every model and report: data revision, date and software version.

Input checklist

GroupData needed
NetworkSingle-line diagram, voltage levels, operating modes, utility fault level and X/R
GeneratorsRating, reactances (X″d, X′d, Xd, X2, X0), time constants, excitation type, governor and AVR data
TransformerskVA, impedance, X/R, vector group, tap position, losses
Cables and busbarsType, size, length, route, installation method, ratings
LoadskW, power factor, duty, starting method, harmonic data
UPS and batteriesRatings, rectifier type, fault-current behaviour
ProtectionDevice types, models, CT ratios and settings as found
SiteAltitude, ambient temperature, soil resistivity

Grading the quality of each input

GradeSourceExampleHow to treat it
A. MeasuredSite measurement or testLogged load, measured cable length, relay settings downloadedUse directly
B. DocumentedTest certificate, data sheet, utility letterTransformer test report, alternator data sheetUse; confirm it matches the installed equipment
C. TypicalTypical values for similar equipmentGenerator reactances from a similar frameUse with a sensitivity case; flag in the report
D. AssumedEngineering judgementFuture load growth, unknown cable routeChoose the conservative direction; get better data if it matters

Preferred sources and their risks

InputPreferred sourceFallback and its risk
Utility fault levelWritten statement from the DISCOMOld letter or estimate; fault levels grow when the network is reinforced
Transformer impedanceTest certificateNameplate or typical value
Generator reactancesAlternator data sheet for the exact frameTypical values; may be on a different base
Cable lengthsMeasured on siteDrawing lengths, often shorter than reality
LoadsLogged measurementsNameplates with demand factors
Protection settingsDownloaded from the relay or read from the releasePaper records, often out of date

Validation techniques

  1. Nameplate check. Compare the model data with photographs of the actual equipment.
  2. Range check. Compare values with typical ranges for similar equipment and investigate outliers.
  3. Measurement check. Compare computed voltages and currents with measured values at a few points.
  4. Hand check. Calculate one fault current or voltage drop by hand to confirm the software result.
  5. Peer review. A second engineer reviews the inputs, not just the conclusions.

Sensitivity: when does the answer change?

Vary the least certain inputs across a plausible range: the utility fault level, generator reactances, motor starting current, cable lengths. If a breaker passes at the low fault level but fails at the high one, or a motor starts with one reactance value but not another, the conclusion depends on that input. Get better data before deciding.

Worked example (illustrative)

A short-circuit study used a utility fault level from a letter several years old. A check with the DISCOM showed the level had risen after a new substation was built nearby. With the new figure, one LV feeder breaker was found to be below its required breaking capacity. The study was rerun, a sensitivity case for further growth was added, and the breaker was replaced before it was ever asked to clear a fault beyond its rating. The study’s conclusion changed because one input did. See utility fault level and source impedance.

Do not accept a study that does not list its inputs and assumptions. Precise numbers from unverified data give false confidence, and protection settings or breaker ratings based on them can fail when they are needed.

Assumption register template

The register for the whole study programme on one installation — a 2000 kVA transformer on a 350 MVA utility with two 1250 kVA generators. The example above is a single stale utility figure that changed a study’s conclusion; this register grades every input the programme rests on, and the exercise finds that the site’s most consequential finding depends on its only grade-D entry.

AssumptionValue usedGrade (A–D)SourceOwner to confirmEffect if wrong
Utility fault level350 MVAC, documented but four years oldSupply authority letterClient engineering, with the supply authorityMoves the main board fault level from 42.3 kA before motor contribution, 45.3 with it. The 50 kA board and its making capacity are both close, so this input is worth re-asking
Transformer impedance6%A, measuredTest certificate for this serial number—Half a percent either way moves the fault level about 3 kA
Generator subtransient reactance0.12 per unitB, documented for the frameAlternator datasheetSupplier, for the exact frame and excitation typeMoves the generator fault level from 14.5 kA per set, and with it every protection pickup in generator mode
Generator transient reactance0.20 per unitB, documentedSame datasheetSupplierMoves the minimum fault at feeder ends. F2 is already below its old setting at 3644 A, so this one has a decision riding on it
R/X ratio at the main board0.10D, assumedTypical for this arrangement. Not calculated and not measuredNobody yet. This is the open itemMoves the peak factor from 1.75. At 0.25 the peak would be 95 kA and the board would pass its making capacity
Cable resistance at operating temperature, 95 mm²0.247 ohm/kmB, documentedMaker’s data at operating temperature—Moves both the minimum fault and the voltage drop, in opposite directions
Motor efficiency, M-020.94C, typical for the ratingAssumed from the rating, not readSupplier nameplateMoves the design current from 185 A. The cable size is decided by the starting case, so this matters less than it looks
      
      

Grading the inputs takes an afternoon and reorders the whole programme. One input is measured, three are documented, two are typical and one is assumed — and the assumed one is the R/X ratio, which is the input that decides the peak factor, which is what makes the main board fail its making capacity. At an R/X of 0.10 the peak factor is 1.75 and the peak is 112 kA against a 105 kA rating. At 0.25 the peak factor is 1.485, the peak is 95 kA, and the board passes. The site’s most expensive finding rests entirely on a number nobody has calculated.

That does not mean the finding is wrong. A low R/X is the expected condition close to a large transformer on a stiff supply, and 0.10 is a reasonable figure for exactly this arrangement — which is why it was used. What the register does is force the question into the open and give it an owner, so that a breaker is not replaced on the strength of a typical value when the real ratio can be calculated from the transformer and cable data already in the model. The fifth column reading “nobody yet” is the output of this sheet; everything else on it is in order.

The sixth column is the one that decides how hard to chase each row, and it has to be written as a consequence rather than as a sensitivity percentage. Row two has an A grade and still carries a real effect — half a percent of transformer impedance is about 3 kA — but it is measured, so there is nothing to chase.

Row seven is only a C grade and the effect is almost nil, because the cable was sized by its starting case and not by its running current, so a wrong efficiency would not change a single decision. Chasing inputs by their grade alone would have had somebody ringing the motor supplier and nobody calculating the R/X.

Row one is the row the example above is about, and it is on this register for the same reason: four years is long enough for a supply authority to build a substation. It is graded C rather than B because its age is known and its value is not confirmed, and the effect cell says what is at stake — the board is within 4.7 kA of its breaking rating on the figure in hand, so a fault level that has risen since the letter was written would be a second finding on the same breaker. One phone call settles it, and the register is what makes sure somebody makes it.

Two habits keep a register honest over the life of a study. Every row is dated and versioned with the model, so that a report issued six months later says which revision of which input it used. And a row is only re-graded when its source changes, not when somebody becomes more confident: an input stays at D until it has been calculated or measured, however reasonable it has come to look.

Reporting and version control

  • List inputs and assumptions in an appendix, with their grades.
  • State which operating cases were studied and which were not.
  • Give each conclusion with its margin and its key sensitivity.
  • Record the model version, data revision, date and software version on the report.
  • Keep the model files so the study can be repeated after changes, for example when a transformer is replaced or protection settings are coordinated again.

Worked example: testing the least certain inputs (illustrative)

Uncertain inputRange testedEffect on the resultDecision
Transformer impedance, typical value usedPlus and minus 10%LV fault current changes by roughly 10%Obtain the test report before confirming a marginal breaker
Cable length, estimated from drawingsPlus and minus 20%Minimum fault current at a feeder end changes by up to about 15%Measure the route where protection margin is small
Utility fault level, old letterLower and higher figuresHV breaker duty changes widely; LV board changes a few percentRequest a current value for HV equipment checks

Where a conclusion holds across the whole range, the uncertain input does not matter for it. Where it flips, better data is needed before a decision is made.

Common mistakes

  • Unrecorded assumptions.
  • Generator reactances from another frame, or on the wrong base.
  • Drawing lengths used for cables without a site check.
  • A single operating case with no sensitivity.
  • Model files lost after the report is issued.

What to send us

Send the data you have and mark what you do not have; we will grade it and say what is worth measuring. WhatsApp 98852 01608 or use the enquiry form.

Evidence note. The example is illustrative. Study methods follow the applicable standards for each type of study.

Questions engineers ask

How is a sensitivity check done on uncertain study inputs?

The least certain inputs are varied across a realistic range, such as transformer impedance by 10% or cable length by 20%, and the study is rerun. If the conclusion holds across the range, the uncertainty does not matter for it; if it flips, better data is obtained before a decision is made.

Why should study models be kept under version control?

Because studies are reused and updated for years. Each version records the data revision, the date, the software version and what changed, so a result can be traced to the exact inputs behind it, and a later change can be checked against the model that the installed settings came from.

What if data is missing?

Use the best available substitute, grade it as typical or assumed, record it in the assumption register with its owner, and test the conclusion with a sensitivity case. Where the conclusion depends on the missing value, obtain the real data before relying on the result, especially for equipment ratings and protection.

How accurate must inputs be?

Accurate enough that the conclusion does not change within the plausible error. Ratings checks near their limit need measured or documented data; checks with wide margins can rely on typical values. Sensitivity cases show which inputs matter for each conclusion and therefore where better data is worth the effort.

Who owns assumptions?

The person who can confirm or correct each one: the owner for operating modes and loads, the supply authority for fault levels, the makers for equipment data and the study engineer for modelling choices. Naming an owner for each assumption makes sure someone is responsible for closing it.

Should I keep model files?

Yes. The model, its data revision, the software version and the report together let the study be reused, updated and checked later. Without the model, every change needs the study to be rebuilt, and nobody can trace how the installed settings and equipment ratings were derived or check them after a change.

This guide gives general principles. Every study must be reviewed by a qualified engineer.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.