In short. A load-flow study works out the steady-state voltage at every board and the current, kW and kVAr in every cable, transformer and generator, for a given set of sources and loads. It answers three questions: are voltages inside the allowed band, is anything overloaded, and how is power shared between the grid and the generators? The case most often missed is generator supply. Capacitor banks are often switched out and taps are set for the grid, so the same plant can be fine on mains and out of limits on the generator.
Who this page is for: For consultants, plant engineers and facility managers checking voltages, cable and transformer loading, and generator loading on multi-board or multi-source sites.
Key facts
- Load flow is steady-state: it does not show motor-start dips, fault currents or transients.
- Bus voltages are often held within about ±5% of nominal in service; agree the band before the study.
- Voltage drop ≈ √3 × I × L × (R cos φ + X sin φ), with L in km and R, X in ohms per km.
- Generator loading is kVA, not kW: kVA = √(kW² + kVAr²).
- Run every case that matters: maximum and minimum load, generator supply, contingencies and future growth.
- Use actual transformer tap positions, not nominal.
What the study tells you
| Input | Output |
|---|---|
| Source voltage and impedance | Voltage magnitude at every bus |
| Transformer data and taps | Transformer loading and tap suitability |
| Cable sizes and lengths | Voltage drop and losses |
| Load kW and power factor per bus | kW and kVAr flows, incomer power factor |
| Generator setpoints and limits | Generator kVA loading and reactive share |
Worked example: a remote board on grid and generator (illustrative)
A remote board 250 m from the main switchboard carries 200 kW at power factor 0.85 through a 240 mm² copper cable (R about 0.098 Ω/km, X about 0.07 Ω/km).
| Step | Working | Result |
|---|---|---|
| Current | 200,000 ÷ (1.732 × 415 × 0.85) | About 327 A |
| Cable drop | 1.732 × 327 × 0.25 × (0.098 × 0.85 + 0.07 × 0.53) | About 17 V, 4.1% |
| Grid case: main board at 98% after transformer regulation | 98 − 4.1 | About 93.9%: below a 95% limit |
| Grid case with transformer tap raised 2.5% | 100.5 − 4.1 | About 96.4%: within limits |
| Generator case: voltage regulator holds the main board at 100% | 100 − 4.1 | About 95.9%: within limits |
The study also checks the generator. The site’s total load is 400 kW. On the grid, a capacitor bank holds the power factor at 0.95, so demand is about 421 kVA. On the generator the bank is switched out and the power factor falls to 0.8, so demand rises to 500 kVA: a 500 kVA set would be at its full rating with no margin, and any further fall in power factor would overload it on kVA even though the kW stays at 400. See reactive power studies.
Do not judge a generator’s loading by kW alone. Check kVA and the alternator’s reactive capability on generator supply, where capacitor banks may be out and the power factor lower than on the grid.
Cases to run
| Case | Why |
|---|---|
| Maximum load on grid | Lowest voltages and highest loadings |
| Minimum load on grid | Highest voltages, especially with capacitors in |
| Generator supply | Different source, power factor and voltage control |
| Contingency: a transformer or feeder out | Can the rest carry the load? |
| Parallel operation | Reactive sharing between grid and generator |
| Future growth | Headroom for planned loads |
Interpreting results
- Low voltage at a remote bus: check cable size, transformer tap and source voltage. See cable sizing and voltage drop.
- Overloaded cable or transformer: reduce load, add capacity or reconfigure.
- Generator near its kVAr limit: improve power factor locally.
- High losses: review long cables, low power factor and loading.
Inputs to verify
- Single-line diagram, cable sizes and lengths as built.
- Transformer impedance and actual tap positions.
- Utility voltage range and generator voltage setpoint.
- Load kW and power factor by bus for each case.
- Capacitor steps and control modes.
Limits of the method
Load flow shows a steady state. Motor starting, fault levels, harmonics and transient stability need their own studies. And the model is only as good as its data: wrong impedances or loads give confident but wrong voltages.
Load-flow case sheet
| Case | Lowest bus voltage (%) | Highest loading (%) | Generator kVA (%) | Action |
|---|---|---|---|---|
| Maximum load, grid | ||||
| Minimum load, grid | ||||
| Generator supply | ||||
| Contingency |
How the calculation treats each source and load
| Bus type | Fixed in the calculation | Found by the calculation | Typical use |
|---|---|---|---|
| Slack or swing bus | Voltage magnitude and angle | kW and kVAr supplied | The utility connection, or the lead generator on island |
| Voltage-controlled bus | kW and voltage magnitude | kVAr and angle | A generator in voltage control |
| Load bus | kW and kVAr | Voltage magnitude and angle | Boards and loads; a generator in power factor control |
On island supply, the generator becomes the slack bus. With several sets in parallel, one is modelled as the slack and the others with their kW and voltage or power factor settings, so the result shows how kVAr divides between them.
How loads respond to voltage
Loads do not all behave the same way when voltage falls. Induction motors at steady load draw roughly constant power, so their current rises as voltage falls, which deepens the drop. Resistive heaters behave as a constant impedance, so their power falls with the square of voltage. Many electronic supplies draw constant power. The study uses a mix that matches the site; assuming every load is constant power gives a conservative low-voltage answer, while assuming constant impedance can hide a real problem at a remote board full of motors.
Worked example: losses in the same feeder (illustrative)
The remote board example above carries about 327 A through 250 m of 240 mm² copper with a resistance of about 0.098 Ω per km.
| Arrangement | Working | Losses | Voltage drop |
|---|---|---|---|
| One 240 mm² cable | 3 × 327² × 0.098 × 0.25 | About 7.9 kW, 3.9% of 200 kW | About 4.1% |
| Two 240 mm² cables in parallel | Half the resistance | About 3.9 kW | About 2.1% |
A load flow reports losses for every element. On long, heavily loaded feeders, the energy saved by a larger cable over its life is often worth more than the extra cable, and the lower voltage drop gives room for motor starts and future load.
Capacitors, taps and voltage control
Switching a capacitor bank raises the voltage at its bus by roughly the bank kVAr divided by the transformer kVA, times the transformer impedance in percent. On a 1.6 MVA transformer with 6% impedance, a 300 kVAr step raises the LV voltage by about 300 ÷ 1600 × 6 ≈ 1.1%. At light load, with taps set high for the busy day, capacitors still connected can push the voltage above the upper limit. The minimum load case catches this, and the remedy is automatic capacitor control by power factor or voltage, or a tap setting that suits both ends of the load range.
Off-load tap changers, with steps of 2.5%, are set once for the expected range; on-load tap changers adjust continuously. The study uses the actual tap position found on site, because a transformer left on the wrong tap can explain years of low or high voltage complaints.
Contingency cases
A site with two transformers sharing the load through a bus coupler may be designed so that either can carry the whole site if the other fails. The contingency case opens one transformer and checks whether the remaining unit, its cables and the bus coupler stay within their ratings, and whether the voltage at remote boards stays inside the band. A transformer at 70% in normal running reaches 140% in this case, which shows at once whether the claimed redundancy is real or whether load must be shed. See N, N+1, N+2 and 2N power architecture.
Checking the model against the site
Before the results are trusted, compare the model with measurements: voltages at the main and remote boards, transformer loading and power factor at a known time and load. Agreement within about 1 to 2% on voltage suggests the impedances and taps are right; a larger gap usually points to a wrong cable length, a transformer tap that differs from the drawing, or a load in a different place. Correct the model first, then run the cases.
What the report should give
- A table of bus voltages for every case, with any value outside the band marked.
- Loading of every transformer, cable and generator in percent of its rating, for every case.
- Generator kW, kVAr and kVA in each generator case, against its capability.
- Recommended tap positions, capacitor settings and any cable or transformer changes.
- The data sources and assumptions, and the measurements used to check the model.
The generator capability limit
An alternator can supply kVAr only within its capability curve, which is limited by field heating when supplying reactive power, by stability when absorbing it, and by the engine for kW. The load flow plots each generator’s operating point in every case against that curve, so that a set near its field limit is found on paper and not in service.
Common mistakes
- Running only the grid case.
- Using nominal rather than actual transformer taps.
- Ignoring the generator’s reactive limits.
- Assuming capacitor banks are in service on generator supply.
What to send us
Send the single-line diagram, cable schedule, load list and transformer and generator data. WhatsApp 98852 01608 or use the enquiry form. See also voltage drop basics.
Evidence note. Cable data and voltages are illustrative; use the cable maker’s data and the agreed voltage limits.
Questions engineers ask
How much does a capacitor bank raise the bus voltage?
Roughly the bank kVAr divided by the transformer kVA, times the transformer impedance in percent. A 300 kVAr step on a 1.6 MVA transformer of 6% impedance raises the LV voltage by about 1.1%. At light load with high taps, capacitors left connected can push voltage above the limit, which the minimum load case of a load flow reveals.
How are cable losses found in a load flow study?
From the current squared times the resistance of each element. An illustrative 327 A feeder of 240 mm² copper, 250 m long at about 0.098 ohm per km, loses about 7.9 kW, 3.9% of its 200 kW load. A second cable in parallel halves the loss to about 3.9 kW and the voltage drop from about 4.1 to about 2.1%.
Is load flow needed for small sites?
A simple site with one supply and short cables can often be checked by hand with voltage drop calculations. A load flow model is worth it once there are several boards, long feeders, more than one source, capacitor banks or plans for growth, because those make hand checks slow and unreliable, especially for generator supply.
What voltage limits apply?
Limits come from the supply regulations, the equipment ratings and the project specification. In service, bus voltages are often kept within about plus or minus 5% of nominal, with a tighter band for sensitive equipment. Agree the band for every case, including generator supply, before the study starts.
Does load flow include harmonics?
No. A load flow works at the fundamental frequency only. Harmonic currents, distortion and resonance need a separate harmonic study, which can use the same network model with added frequency-dependent data for sources, cables, transformers and capacitors, plus the measured harmonic spectrum of the loads.
Can it size a generator?
It shows the steady kW, kVAr and kVA that a generator must supply in each case, which is the first part of sizing. It does not show motor starting dips, load step response or harmonic heating, so a generator sizing and transient study must follow before a set is chosen.
This guide gives general principles. Results depend on the accuracy of the model.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.