In short. Generator sizing starts from the generator-mode load schedule, not the sum of nameplates. Check the engine against running kW and the alternator against kVA and reactive load. Then check the transient events: the largest motor start, the block load when the changeover switches, UPS recharge and any transformer to be energised. Finally, apply site derating to the set’s rating before comparing. The right set passes every check with sensible headroom and is not grossly oversized.
Who this page is for: For consultants, owners and plant engineers selecting a standby or prime generator for a building or factory.
Key facts
- The engine supplies kW; the alternator supplies kVA and reactive power.
- Size from the generator-mode schedule: what must run, together.
- The largest motor start and the transfer block load are often the deciding checks.
- UPS input after an outage includes battery recharge.
- Standby, prime and continuous ratings are different; match the duty.
- Apply the maker’s derating for site temperature and altitude.
Worked example: the 247 kW generator-mode schedule (illustrative)
| Check | Working | Result |
|---|---|---|
| Running load | 247 kW at 0.85 power factor | about 291 kVA |
| 320 kVA set (256 kW) | 247 ÷ 256 | 96% loaded: no headroom |
| 400 kVA set (320 kW) | 247 ÷ 320 | 77% loaded |
| 55 kW pump, star-delta | Motor current about 96 A; starting about 192 A, 138 kVA; dip = 138 × 0.2 (transient reactance) ÷ (400 + 28) | about 6.4% |
| Transfer block load | Essential loads 150 kW at once = 47% of 320 kW | Checked against the maker’s load acceptance data |
| Site derating at 45 °C | From the maker’s curve | Within rating |
The 400 kVA set was chosen. The 320 kVA set would have run the load, but with no margin for recharge, load steps or growth. See the load list and motor starting on generators.
Do not choose a generator from total kW plus a percentage. Check running kVA, the largest motor start, the transfer block load and UPS recharge, using the maker’s transient data for the actual set.
Loads that need extra care
| Load | Why |
|---|---|
| UPS and drives | Harmonic current heats the alternator. See harmonic studies |
| Lifts and regenerative drives | Can push power back into the set |
| Transformers energised by the set | Inrush current dips voltage |
| Single-phase loads | Unbalance loads one phase more than the others |
See load steps and frequency and multi-generator N+1.
Generator sizing sheet
| Check | Requirement | Set capability | Pass? |
|---|---|---|---|
| Running kW | |||
| Running kVA | |||
| Largest motor start | |||
| Transfer block load | |||
| Site derating |
Standby, prime and continuous ratings
The same set carries different ratings depending on how it will be used. Choosing a set by its standby figure for a site that runs on generator every day is one of the most common sizing errors. The definitions below follow the international rating classes for generating sets; exact hours and overload terms vary between makers, so the maker’s data sheet is the final reference.
| Rating | Intended use | Typical limits |
|---|---|---|
| Emergency standby | Supply during grid outages only | No overload; average load over 24 h often limited to about 70%; limited hours a year, commonly about 200 to 500 |
| Prime | Main supply with variable load | Unlimited hours; average load about 70%; often 10% overload for a limited time |
| Limited-time running | Constant load for limited hours | Up to about 500 hours a year; no overload |
| Continuous | Constant load without limit | Unlimited hours at 100%; the lowest figure for the same set |
For the same engine and alternator, the prime rating is typically about 10% below the standby rating, and the continuous rating lower still. A site with weak grid supply that runs many hours a month should be sized on the prime rating.
Engine kW and alternator kVA are separate checks
Generator sets are rated in kVA at a power factor of 0.8, so a 400 kVA set has an engine for about 320 kW. A load of 280 kW at a power factor of 0.7 needs 280 ÷ 0.7 = 400 kVA. The engine is only 280 ÷ 320 = 87.5% loaded, but the alternator is at its full 400 kVA. Loads with a poor power factor, many induction motors at part load for example, can fill the alternator before the engine.
The reverse also happens: a site with power factor correction near unity can load the engine fully while the alternator has spare kVA. Both checks are made, and the alternator may be chosen one frame size larger than standard to cover a poor power factor or a large motor start.
Worked example: one 55 kW pump, four starting methods (illustrative)
A 55 kW motor at a power factor of about 0.85 and an efficiency of about 92% draws about 70 kVA running. On a 400 kVA set with a transient reactance of about 0.2, the voltage dip is estimated as starting kVA × 0.2 ÷ (400 + starting kVA × 0.2).
| Starting method | Starting kVA | Estimated dip | Comment |
|---|---|---|---|
| Direct on line, about 6 times | About 420 | 84 ÷ 484 ≈ 17% | Contactors and drives elsewhere may drop out |
| Star-delta, about 2 times | About 140 | 28 ÷ 428 ≈ 6.5% | Watch the current peak at the changeover to delta |
| Soft starter, about 3 times | About 210 | 42 ÷ 442 ≈ 9.5% | Longer start, adjustable ramp |
| Variable speed drive, about 1 to 1.5 times | About 70 to 105 | About 3.4 to 5% | Smallest dip, but harmonic current to allow for |
The estimate uses the alternator’s transient reactance and ignores the regulator’s action, so it is conservative for a set with a fast regulator and a strong excitation system. Makers publish motor starting curves for each alternator frame, giving the starting kVA that produces a given dip; the final check uses that curve. See large motor starting on diesel generators.
Site derating
A set’s rating is stated at reference conditions of air temperature, altitude and humidity. Above them, the engine gets less air mass for combustion and the cooling system less margin, so the maker publishes derating curves. As an illustration, if the curve gives a factor of 0.95 at 45 °C in a hot generator room, a set rated 320 kW delivers about 0.95 × 320 = 304 kW there. Room temperature, not outdoor shade temperature, is the value to use, because a poorly ventilated room can run 10 °C or more above outside air. The study states the design room temperature and the ventilation needed to hold it.
UPS loads on the generator
- Recharge: after an outage the UPS draws its load plus battery recharge, which can add a significant fraction of its rating, often 10 to 20%, for an hour or more. Size for load plus recharge, or limit the recharge current on generator supply.
- Walk-in: a UPS that ramps its input over several seconds spares the set a block step; set the ramp and check it.
- Harmonics: a six-pulse rectifier on a set of similar size gives high voltage distortion; choose a low-harmonic input or size the alternator for it.
- Frequency window: the UPS bypass may reject a generator whose frequency moves outside a narrow band; widen the window on generator supply where the load allows.
Regenerative loads and light load
Lifts, cranes and some drives push power back into the supply when they brake or lower a load. On the grid this is absorbed easily; on a lightly loaded generator it can push the set toward reverse power and raise the frequency and voltage. Keep enough other load on the set when regenerative loads run, or fit braking resistors on the drives. Light load is also a problem in itself: a diesel set run for long periods well below about 30% of its rating can suffer from incomplete combustion and oil and fuel residues in the exhaust, so oversizing has a cost beyond the purchase.
Single-phase load and unbalance
Single-phase loads that are unevenly spread across the phases load one winding more than the others and create negative-sequence current that heats the rotor. Alternator makers state how much unbalance their machines accept. The study lists single-phase loads by phase, balances them as far as possible, and checks that the most heavily loaded phase stays within the alternator’s rating. See voltage unbalance and negative sequence studies.
The sizing record
A complete sizing record lists the generator-mode loads with kW, kVA and starting method, the rating class chosen and why, the derating applied, each transient check with the maker’s data used, the margin left for growth, and the assumptions. With this record, a later change of load can be checked against the set in minutes instead of repeating the whole study.
The transfer block load
When the changeover closes, every load still connected arrives at once. Lighting, heaters and motors that were running before the outage restart together, and motors restarting at the same moment each draw starting current. The study lists what is connected at the instant of transfer, and either keeps it within the set’s one-step acceptance or splits it with staged contactors and timed restarts.
Common mistakes
- Sizing from connected load.
- Ignoring UPS recharge and harmonics.
- Standby rating used for prime duty.
- No site derating.
What to send us
Send your load list, the loads that must run on generator and your largest motors. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Values are illustrative; final selection uses the maker’s data.
Questions engineers ask
Why can a generator alternator be full while the engine is not?
Sets are rated in kVA at 0.8 power factor, so a 400 kVA set has an engine of about 320 kW. A 280 kW load at 0.7 power factor needs 400 kVA, filling the alternator while the engine is only 87.5% loaded. Poor power factor loads therefore need an alternator check as well as an engine check, and sometimes a larger alternator frame.
How much does the starting method change the voltage dip on a generator?
For an illustrative 55 kW motor on a 400 kVA set with a transient reactance of 0.2, direct on line starting at about 420 kVA gives a dip near 17%, star-delta about 6.5%, a soft starter about 9.5% and a variable speed drive about 3 to 5%. The maker motor starting curve for the actual alternator gives the final figure.
Why is the transient check needed if steady load fits?
Because a set can carry the running load comfortably yet fail when a large motor starts or the transfer block load arrives. The voltage and frequency dips during those events can drop contactors, trip drives and cause the UPS to reject the supply. The transient check uses the maker data for the actual set to confirm every step is within load tolerance.
What loads are hardest on generators?
Large motors started direct on line, rectifier loads such as UPS units and drives, transformers energised from the set, regenerative loads such as lifts, and large block loads applied at once. Each needs its own check against the maker transient, harmonic and reverse power data, rather than a simple percentage margin on kW.
How much margin should I include?
Enough for the load growth that is planned, the uncertainty in the load data and the transient events, stated clearly in the sizing record. Oversizing has costs too: a diesel set running for long periods at light load suffers from incomplete combustion. Better load data reduces the margin needed more than any rule of thumb.
Does a bigger alternator help?
Yes, for voltage dips and harmonic distortion, because a larger alternator frame has a lower reactance on the load base. It does not help the frequency dip, which depends on the engine and governor accepting the load step. For large motor starts, a larger alternator on the same engine is often the most economical answer.
Values are illustrative. Sizing needs manufacturer data and project loads.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.