In short. Paralleling two sources is safe only when voltage, frequency, phase angle and phase sequence match at the instant of closing. After closing, the sets must share kW and kVAr correctly and be protected from each other. A synchronising and paralleling study defines the closing windows, the controls, the protection, the fault levels and what happens if any part fails.
Who this page is for: For consultants and engineers designing generator paralleling or generator-grid parallel systems.
Key facts
- Closing windows: voltage within a few percent, slip a fraction of a hertz, angle within about 10 degrees.
- Phase sequence must be proven before the first close.
- Voltage difference drives reactive circulating current; slip and angle drive real power surges.
- Paralleled sets need reverse power and loss of excitation protection.
- Fault level rises with each source added; check every breaker.
- Grid parallel needs utility approval and interconnection protection.
Closing conditions
| Condition | If wrong |
|---|---|
| Phase sequence | A short circuit at closing |
| Voltage | Reactive circulating current |
| Frequency (slip) | Real power surge; reverse power if the incoming set is slow |
| Phase angle | Torque shock and large transient current |
See synchronisation.
Worked example: study output for adding a third set (illustrative)
| Study item | Finding | Decision |
|---|---|---|
| Bus fault level with three sets | About 35 kA initially | Two feeder breakers rated 25 kA replaced |
| Load sharing method | Existing sets on droop; new set isochronous | All three sets set to isochronous load sharing; sharing lines added |
| Reverse power | New set motoring power about 8% | Set at 4%, 5 s |
| Closing windows | Breaker closing time 70 ms | Advance set; check-sync relay independent |
| Failure of sharing link | Not defined | Fallback to droop on link loss |
Without the study, the fault level increase and the mixed sharing modes would only have been found by a failure. See load sharing and reverse power.
Do not add a generator to a paralleled bus without a study of fault levels, sharing modes and protection. Each new source changes all three.
Grid parallel
Paralleling with the utility needs approval, interconnection protection and loss-of-mains detection. See interconnection studies.
See paralleling switchgear and synchronising switchgear.
Paralleling study checklist
| Item | Result |
|---|---|
| Fault level, all sources | |
| Sharing method, all sets | |
| Closing windows and breaker time | |
| Generator protection settings | |
| Failure cases defined |
Worked example: slip, angle and breaker closing time (illustrative)
A synchroniser does not close the breaker when the angle reaches zero; it sends the close command early, because the breaker takes time to close. During that time the incoming set keeps slipping relative to the bus, so the command must lead zero by the angle travelled in the closing time. The angle travelled per second is the slip frequency times 360 degrees.
| Slip | Angle moved per second | Angle moved in a 70 ms closing time | Effect |
|---|---|---|---|
| 0.05 Hz | 0.05 × 360 = 18 degrees | 18 × 0.07 ≈ 1.3 degrees | Gentle close; slow to reach the window |
| 0.1 Hz | 36 degrees | 36 × 0.07 ≈ 2.5 degrees | Typical setting; quick and smooth |
| 0.2 Hz | 72 degrees | 72 × 0.07 ≈ 5 degrees | Advance matters; a wrong breaker time closes off-centre |
| 0.5 Hz | 180 degrees | 180 × 0.07 ≈ 12.6 degrees | Outside a 10 degree window unless the advance is exact |
Two lessons follow. The closing time must be measured on the actual breaker, because a value copied from a catalogue can be wrong by tens of milliseconds after years of service. And the slip should be small and positive, so that the incoming set picks up a little load at once instead of arriving slow and motoring.
Voltage mismatch and circulating current
When two sets are closed together at slightly different voltages, the difference drives a reactive current between them, limited at first by their subtransient reactances. Take two 1000 kVA sets at 415 V, each with a subtransient reactance of about 0.15 per unit, closed with a 5% voltage difference.
The current is about 0.05 ÷ (0.15 + 0.15) ≈ 0.17 per unit, which is about 17% of the 1391 A rated current, or roughly 230 A, flowing as reactive current from the higher-voltage set into the other. The regulators then pull the two voltages together, but if they share reactive load badly, a smaller circulating current remains and heats both alternators without serving any load.
That is why voltage matching is checked within a few percent before closing, and why reactive sharing after closing needs either voltage droop or cross-current compensation in the regulators. The study states which method is used and checks that sets of different makes or sizes share kVAr in proportion to their ratings.
How droop decides the share of kW
In droop mode each governor lowers its speed setting slightly as its load rises, so sets connected to the same bus settle where their frequencies are equal. A small error in the no-load setting shifts load between them. Two 500 kW sets with 4% droop each fall by 2 Hz from no load to full load. If set A is adjusted 0.2 Hz higher than set B, then at the common frequency set A carries 0.2 ÷ 2 × 500 = 50 kW more than set B. With a 600 kW load, A carries 325 kW and B 275 kW instead of 300 kW each.
In isochronous mode with load-sharing lines or a communication link, the controllers hold 50 Hz and divide the load in proportion to rating. That is more accurate, but the study must define what happens when the link fails: the usual answer is an automatic fall-back to droop, so that sharing becomes approximate instead of unstable. Mixing one set in isochronous mode with others in droop, without a sharing link, makes the isochronous set take every load change until it overloads or reverses.
Neutrals, earthing and third-harmonic current
Paralleled alternators with their neutrals solidly connected can circulate third-harmonic current between them, especially if their winding pitches differ. Alternators with a two-thirds pitch winding produce very little third-harmonic voltage and are preferred where neutrals are connected; sets of different pitch, or of different makes, need a check before their neutrals are tied together. Options include earthing the neutral at a single point, neutral contactors that keep only one neutral connected, or a neutral earthing impedance. The earthing study and the paralleling study must agree, because the choice also sets the earth fault current. See earthing system study architecture.
Protection functions for paralleled sets
| Function | Device number | Why paralleling needs it |
|---|---|---|
| Reverse power | 32 | A set that loses fuel or governor control is driven as a motor by the others |
| Loss of excitation | 40 | A set losing its field draws reactive power from the bus and can overheat |
| Voltage-restrained overcurrent | 51V | Generator fault current decays, so plain overcurrent may not see a sustained fault |
| Check synchronising | 25 | Independent permission to close, separate from the automatic synchroniser |
| Generator differential | 87G | Fast clearance of internal faults on larger sets, where other sets feed the fault |
| Under and over voltage and frequency | 27, 59, 81 | Separate a set that cannot hold the bus |
The settings form part of the study, not a later commissioning task. Reverse power, for instance, is set from the motoring power of the actual engine, which differs widely between engine types, with a delay long enough to ride through the small power swings of synchronising. See protection coordination study workflow.
Dead-bus closing and arbitration
After a blackout, the first set to reach speed and voltage closes onto the dead bus without synchronising, and the others then synchronise to it. If two sets both see a dead bus and close at the same moment, they close out of phase. The control system must therefore arbitrate, so that only one set holds permission to close onto a dead bus at a time, and must confirm the bus is truly dead before any close. See dead-bus, live-bus and sync-check control logic.
Failure cases the study must answer
| Failure | Risk | Usual answer |
|---|---|---|
| Load-sharing link lost | Sets hunt or one set takes all the load | Automatic fall-back to droop, with an alarm |
| Synchroniser fails to close | Set runs unloaded, capacity short | Timeout, alarm and load shedding to suit the sets on line |
| One set trips at high load | Survivors overloaded, frequency falls | Fast load shedding sized for the largest set |
| Breaker fails to open on a trip | Faulted set stays on the bus | Breaker-failure protection tripping the bus section |
| Controller power lost | Breaker state and control unknown | Secure DC supply and a defined fail-safe state |
See load-shedding automation and priority logic.
Commissioning tests that prove the study
- Phase sequence and phase rotation proven on both sides of every paralleling breaker before the first close.
- Synchroscope and synchroniser checked with the breaker in its test position, so that the indicated zero matches true phase agreement.
- Closing angle recorded on the first live closes, to confirm the breaker time and advance setting.
- kW and kVAr sharing recorded at about 25, 50, 75 and 100% load.
- Reverse power and loss of excitation trips proven, by injection or by a controlled test.
- Sharing-link failure, set trip and dead-bus start tested with real load where the site allows.
Keep the records with the study, so that later changes, a new set or a replaced controller, can be checked against a known baseline.
Common mistakes
- Mixed droop and isochronous sets.
- Fault level not updated.
- No defined failure behaviour.
- Sequence not proven before first close.
What to send us
Send generator data, the single-line diagram and the controls. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Study values are illustrative.
Questions engineers ask
How early must a synchroniser send the close command?
Early by the angle the sets slip through during the breaker closing time. At 0.1 Hz slip the angle moves 36 degrees per second, so a breaker that takes 70 ms to close needs about 2.5 degrees of advance. At 0.5 Hz slip the same breaker needs about 12.6 degrees, which is why slip is kept small and the breaker time is measured on site.
How does a small governor setting error affect load sharing in droop?
Two 500 kW sets with 4% droop fall 2 Hz from no load to full load. If one is set 0.2 Hz higher, it carries 0.2 divided by 2 times 500, or 50 kW, more than the other. With a 600 kW load the split becomes 325 kW and 275 kW instead of 300 kW each, so settings are checked during commissioning at several loads.
What happens if closed out of phase?
The two machines are forced into step almost instantly, which drives a current that can exceed the short-circuit current and a torque that can exceed the design torque of the shaft and coupling. Windings can move, couplings and foundations crack, and the breaker can be damaged. An independent check-synchronising relay prevents closing outside the set window.
Can different sizes be paralleled?
Yes. Sets of different ratings share load in proportion to their ratings when their governors and regulators are set to the same droop or are linked for isochronous sharing. The study checks that each set has suitable reverse power and excitation protection, that neutral currents are controlled, and that the smallest set is not overloaded during load steps.
What is droop?
A setting that makes the speed of a governor, or the voltage of a regulator, fall slightly as load rises, typically by a few percent from no load to full load. Sets on a common bus then share load in proportion to their ratings without a link between them. Accurate sharing depends on matching the droop and no-load settings of every set.
Do I need synch relays and a controller?
A modern controller includes an automatic synchroniser and often a check function, but an independent check-synchronising relay in the closing circuit adds a second, separate permission that protects against a controller fault or a wrong setting. For large sets, or where a wrong close would cause serious damage or downtime, the separate relay is good practice.
This guide gives general principles. Follow manufacturer instructions and safety practice.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.