Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

IEC Short-Circuit Calculation Engineering Guide

How IEC 60909 short-circuit calculation works: equivalent voltage source, voltage factor c, initial symmetrical, peak, breaking and steady-state currents, and treatment of generators and motors.

In short. A short-circuit calculation produces several fault quantities, and each is checked against a different equipment rating. The initial symmetrical current is checked against breaking capacity. The first peak is checked against making and busbar peak ratings. Current over time is checked against short-time and cable withstand. Using one kA number for every check is the most common error.

Who this page is for: For electrical engineers turning fault-level results into switchgear, busbar and cable checks.

Key facts

  • Initial symmetrical current (r.m.s.) is the starting quantity.
  • Peak current = peak factor × 1.414 × initial current; the factor depends on the network’s X/R.
  • Breaking current can be lower than initial current near generators and motors.
  • Thermal duty depends on current squared × time.
  • A voltage factor is applied for maximum and minimum cases.
  • Compare like with like: r.m.s. with r.m.s., peak with peak.

Which quantity checks what

QuantityChecked against
Initial symmetrical currentBreaker breaking capacity
Peak currentBreaker making capacity, busbar peak withstand
Breaking current at contact openingBreaker duty near rotating machines
Thermal equivalent over clearing timeShort-time rating, cable and earth conductor withstand

Worked example: from 21.7 kA to equipment checks (illustrative)

CheckWorkingResult
Peak factor for R/X = 0.151.02 + 0.98 × e−3 × 0.15about 1.64
Peak current1.64 × 1.414 × 21.7 kAabout 50.5 kA peak
Main breaker, 36 kA breaking21.7 kA r.m.s. vs 36 kA; datasheet making capacity vs 50.5 kA peakPass on both
Copper PVC feeder, cleared in 0.1 s (k about 115)21,700 × √0.1 ÷ 115at least 60 mm²; 70 mm² chosen

The peak is more than twice the r.m.s. value. A busbar checked only against 21.7 kA would be checked against the wrong number. See short-circuit studies and cable sizing.

Do not compare a peak current with an r.m.s. rating, or the other way round. Read each rating on the datasheet for what it is, and match it to the right calculated quantity.

Source behaviour

Equipment check sheet

The equipment checks for the same installation — a 2000 kVA transformer on a 350 MVA utility with two 1250 kVA generators — which is a stiffer site than the 21.7 kA case traced in the example above, and stiff enough that one of the six checks fails. Initial current is r.m.s., peak is the first half-cycle crest, and the fourth column names which rating each one is being compared against, because comparing the wrong pair is the fault this sheet exists to prevent.

EquipmentInitial kAPeak kARating (breaking / making / short-time)Pass?
Main incomer breaker, 3200 A, mains mode45.311250 kA breaking; 105 kA making from the datasheetNo. Breaking passes at 45.3 against 50; making fails at 112 against 105
Main board busbars, 1 s withstand45.311250 kA for 1 s short-time; 105 kA peak withstandNo, on the same peak figure. The busbar and the breaker share the shortfall
Main incomer breaker, both generators29.07450 kA breaking; 105 kA makingYes on both
Sub-board 1 incomer, 1250 A, mains mode317736 kA breaking; 76 kA makingMarginal. 77 against 76 on making; the datasheet value was confirmed with the maker and the board re-rated
Sub-board 2 incomer, 630 A, mains mode143525 kA breaking; 52 kA makingYes on both
Main feeder cable, copper PVC, cleared in 0.2 s42.3—Thermal, not mechanical: 42,300 × √0.2 ÷ 115 = 164.5 mm²Yes with 185 mm². A peak rating does not apply to this check
     
     

The peak figures come from the peak factor, and on this site that factor is the whole story. With an R/X of 0.10 at the main board, 1.02 plus 0.98 times e to the power of minus three times 0.10 gives about 1.75. Multiply by 1.414 and by the 45.3 kA initial current and the peak is about 112 kA — nearly two and a half times the r.m.s. value. In generator mode the R/X is lower still at about 0.07, which gives a factor of 1.81, but the initial current is only 29 kA, so the peak is about 74 kA and nothing is troubled.

Why the main board fails, and why it is not a mistake. A 50 kA breaker carries a minimum making capacity of 2.1 times its breaking rating, which is 105 kA. That factor of 2.1 is 1.414 times a peak factor of 1.485 — and a peak factor of 1.485 corresponds to an R/X of about 0.25. In other words the standard’s minimum assumes a network rather softer than this one.

At an R/X of 0.10 the peak factor is 1.75, the required ratio is 2.47 rather than 2.1, and a board bought to the minimum is 7 kA short at the peak while passing comfortably on the r.m.s. figure. Nobody specified anything incorrectly; the breaking rating was checked and the making rating was assumed. The fix on this site was a breaker whose datasheet making capacity is 132 kA, and the lesson is in the fourth column: read making capacity off the datasheet, never off the breaking rating.

Row four shows the same thing with almost no margin either way. Sub-board 1 sees 31 kA initial and 77 kA peak against a 36 kA and 76 kA board, so it fails by 1 kA on a figure that is itself derived from an estimated R/X. That is too close to settle on a spreadsheet, which is why the entry records that the maker was asked for the tested value rather than the catalogue minimum. A margin inside the uncertainty of the inputs is not a pass; it is a question.

The last row is on the sheet to make a different point. A cable has no making capacity and no breaking capacity: its check is thermal, it depends on current squared times time, and the relevant figure is the r.m.s. current for the clearing time. 42,300 times the square root of 0.2, divided by a k of 115, gives 164.5 mm², so 185 mm² is chosen. Putting that row on the same sheet as the breakers is deliberate: it is the clearest way to show that each piece of equipment is checked against the quantity that can actually damage it, and that one calculated number does not serve every check.

The voltage factor c

Voltage levelc for maximum currentsc for minimum currents
Low voltage, systems with a 6% tolerance1.050.95
Low voltage, systems with a 10% tolerance1.100.95
Medium and high voltage1.101.00

The method replaces every source with one equivalent voltage, c times the nominal voltage divided by √3, at the fault point, and works with impedances alone. The factor c covers the voltage variation that the real system may have at the moment of the fault, so maximum currents are not understated and minimum currents are not overstated.

Impedance correction for transformers and generators

Because the method uses one equivalent voltage instead of each machine’s real internal voltage, it corrects the impedances of network transformers and generators. For a two-winding transformer the factor is about 0.95 × cmax ÷ (1 + 0.6 xT), where xT is the per-unit reactance. For a 6% transformer, xT about 0.059 and cmax 1.05, the factor is about 0.95 × 1.05 ÷ 1.035 ≈ 0.963.

For a generator, the factor is about cmax ÷ (1 + x″d × sin φ) at rated voltage; with x″d 0.12 and a rated power factor of 0.8, about 1.05 ÷ 1.072 ≈ 0.98. Each corrected impedance is a few percent lower than the nameplate value, so the calculated current is a few percent higher.

Far from or near to a generator

A fault is far from a generator when no synchronous machine contributes much more than twice its rated current; then the symmetrical current stays nearly constant and the breaking current equals the initial current. Near a generator, the current decays, and the breaking current at contact parting is lower than the initial value. The method gives a factor μ for this decay, about 0.84 + 0.26 × e−0.26 × (I″k ÷ Ir) for a minimum time delay of 0.02 s. A generator with x″d 0.12 delivers about 8.3 times rated current initially, giving μ about 0.87: its breaking current is about 87% of its initial current.

Thermal equivalent current

For short-time ratings and cable withstand, the method uses a thermal equivalent current over the fault duration, built from the initial current and factors for the DC component and the AC decay. Near generators, where the current falls, it is lower than the initial current; far from generators, with long durations, it is close to it. Checking a cable with the initial current is conservative, which is acceptable for screening but can lead to oversized cables where the fault current decays quickly.

Hand calculation and software together

Software applies the method consistently at every bus and in every mode, but its answer depends on data entered by people. A hand calculation at two or three key buses, using the transformer rule and the generator reactance, catches the common errors: an impedance on the wrong base, a source entered twice, a cable length in the wrong unit. Where the two disagree by more than a few percent, find out why before using either. See transformer impedance and fault contribution.

Common mistakes

  • One kA number for every check.
  • Ignoring peak and X/R.
  • Generator current treated as constant.
  • Cable withstand checked with the wrong clearing time.

What to send us

Send your fault study results and equipment datasheets. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Values are illustrative.

Questions engineers ask

Why are transformer and generator impedances corrected in the IEC method?

Because the method replaces every source with one equivalent voltage at the fault instead of each machine internal voltage. The correction keeps the result conservative. For a 6% transformer with a maximum voltage factor of 1.05 the factor is about 0.963, and for a generator with a subtransient reactance of 0.12 at 0.8 power factor it is about 0.98.

Why is breaking current lower than initial current near a generator?

Because generator fault current decays while the breaker contacts are still closed. The method applies a factor mu that depends on the ratio of initial to rated current and the minimum time delay. A generator delivering about 8.3 times rated current initially gives mu of about 0.87 at 0.02 s, so its breaking current is about 87% of its initial current.

What is the voltage factor c?

A multiplier applied to the nominal voltage of the equivalent source at the fault, to cover the real voltage variation of the system. At low voltage it is commonly 1.05 or 1.10 for maximum currents, depending on the voltage tolerance, and 0.95 for minimum currents, so maximum currents are not understated and minimum currents not overstated.

Why does peak current exceed the symmetrical value?

Because a fault starting at an unfavourable point of the voltage wave carries a DC offset that decays with the network time constant set by X/R. The first peak is therefore up to about twice the crest of the symmetrical current, and the peak factor kappa rises with X/R. Making capacity and busbar peak withstand are checked against it.

IEC or ANSI?

Use the method that the project specification, the local regulations and the equipment ratings are based on. IEC rated switchgear is checked with IEC quantities and ANSI rated equipment with ANSI quantities, because the ratings are defined differently. Mixing a calculation from one method with ratings from the other gives misleading results.

Is hand calculation acceptable?

For screening, simple radial systems and as a check on software, yes. For networks with several sources, motors, parallel paths and operating modes, software applying the method at every bus is more reliable. A hand check at a few key buses remains valuable, because it catches data errors that software will not.

This guide gives general principles. Calculations should follow the current edition of the standard.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.

CallWhatsAppEnquire