Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Electrical FMEA and Single-Point-of-Failure Analysis

How to run an electrical FMEA: boundary, components, failure modes, effects, detection, ranking, single points of failure and the actions that close them.

In short. Failure mode and effects analysis (FMEA) asks four questions of each component: how can it fail, what happens next, how would we know, and how bad is it? A single point of failure is any item whose failure alone stops the load. The study finds these items, ranks them and assigns actions before an outage does it for you. It is most useful on critical power systems where “redundant” designs often share a hidden common part.

Who this page is for: For consultants, reliability engineers and owners of hospitals, data centres and critical plants.

Key facts

  • Set the boundary and the operating modes first.
  • Work from the single-line diagram, control drawings and auxiliaries.
  • For each component: failure mode, effect, detection, severity.
  • Control power, fuel, cooling and people are components too.
  • Rank by severity and likelihood; act on the worst first.
  • Repeat after any change to the system.

Method

  1. Set the boundary: the system, the modes and what counts as loss of function.
  2. List components from the single-line diagram, control drawings and auxiliaries.
  3. For each: how it fails, what happens, how it is detected, how severe it is.
  4. Identify single points of failure.
  5. Assign actions: redundancy, monitoring, maintenance or procedure.

Worked example: extract from a hospital generator system (illustrative)

ComponentFailure modeEffectDetected bySingle point (severity)?Action
Starting battery, set 1FlatSet 1 fails to startNothing until outageNo (set 2); mediumBattery monitor alarm
Common day tankContaminated or emptyBoth sets stopLevel alarm onlyYes; highSeparate day tanks; fuel testing
Main ATSFails to transferCritical loads lostMonthly testYes; highBypass; second path for critical board
Control power supply to ATSFuse blownATS cannot operateNot monitoredYes; highMonitoring; dual supply

The two generators looked redundant, but a shared day tank, one ATS and its control supply were each single points of failure. See reliability and redundancy.

Do not count two generators as redundancy until fuel, control power, transfer switches and cable routes have been checked. A single shared item makes the whole system single.

Common hidden single points

  • Shared day tank or fuel transfer pump.
  • One ATS or one main breaker.
  • One control power supply or battery. See starting systems.
  • One cable route for both supplies.
  • One person who knows the procedure.

See protection resilience, coordination and single-line diagrams.

FMEA worksheet

The analysis for one installation — a 2000 kVA transformer, two 1250 kVA generators and a 400 kVA UPS. The example above is an extract from a hospital system and finds a shared day tank, one transfer switch and its control supply; on this site the day tanks are separate and the single points sit in different places, four of which were found by other studies rather than by inspection.

ComponentFailure modeEffectDetectionSeverityAction
Main board, single 3200 A incomer and busbarBusbar fault, or the incomer itselfAll 1104 kW lost. Both sources connect downstream of itNone in advance. Thermal survey yearlyYes; high. The availability model puts 99.5% of the site’s downtime hereSection the board with a tie, or accept and record the exposure
Bulk fuel store and transferContamination, or transfer failureThe running set stops when its day tank empties: at 885 kW and about 230 litres an hour, a little over four hours from a full 1000-litre tank. The standby set draws from the same bulk storeDay tank low-level alarm onlyYes; highWater alarm, six-monthly sampling, independent low-level float. Day tanks already separate
11 kV feeder relay instantaneous elementSet at 600 A, below T1’s 1050 A inrushThe site cannot restore after a deep outage; the relay trips on energisationNever tested. T1 had not been energised from cold since the scheme was setYes; highRaised to 1500 A and proved by energising each transformer in turn
Q1 incomer instantaneous elementLeft on, at 20 kAMain board trips with any feeder fault above that figureNot monitored. Found by the coordination studyYes; highElement turned off, as-left settings recorded and injection tested
UPS, single unit in seriesInternal failure, or a static bypass that does not transfer320 kW critical load lostContinuous self-check, but the bypass itself needs exercisingYes for the critical load; highExercise the bypass twice a year. The availability model records the UPS as a series element, not a redundant one
Generator setting group selectionFails to select group 2 on islandMain board has no short-time protection on one set; a bus fault clears on the long-time curveGroup position alarmed after the changeNo, protection remains on long-time; mediumAlarm on group position, proved by injection with the group forced
F2 feeder instantaneous elementSet at 4000 A, above the 3644 A phase-to-phase minimumA phase-to-phase fault at that feeder’s far end is not cleared instantaneously on one generatorFound only by the minimum-fault studyYes for that feeder; mediumLowered to 2400 A and proved by injection at 3.6 kA
      
      

Read the fourth column and the sheet sorts itself in a way the severity column does not. Two of these seven are detected by an alarm, one by a self-check, and four were found by a study — a coordination review, a minimum-fault calculation, an energisation plan and an availability model.

Not one of those four could have been found by walking the plant, reading a drawing or testing a device in isolation. That is the argument for doing an FMEA after the studies rather than instead of them: the detection column is where a study’s output becomes a maintained control, and a sheet written first would have had “not monitored” against four rows and no idea why.

The first row is the one with no good action, and it is written that way on purpose. Sectioning a 3200 A board is a shutdown and a significant piece of work, and the honest entry offers the alternative of accepting the exposure and recording it — because an FMEA whose every row ends in a fix is an FMEA that has quietly dropped the rows nobody wanted to pay for. What makes acceptance legitimate is that the availability worksheet puts a number on it: 4.2 hours a year, 99.5% of the site’s total, which is a figure somebody can sign against rather than a vague risk.

Row three deserves separating from the rest because of what its detection cell says. The 11 kV element had been sitting at 600 A against T1’s own 1050 A of inrush, and the reason nobody had ever seen it misbehave is that the condition only arises when T1 is energised from cold — which happens after an outage deep enough to drop the 11 kV board, and at no other time. In the years since the settings were applied the site had never had one.

A failure mode that only appears in a state the plant has never been in is invisible to inspection, to routine testing and to experience, and the energisation study makes it worse again: with the third transformer added, closing all three together gives 2220 A, so raising the element to 1500 fixes the single-transformer case and the restoration sequence has to do the rest. The only thing that finds any of this is somebody working through the modes on paper and noticing that one of them has never happened.

Ranking failure modes

Each failure mode is scored for severity of its effect, likelihood of occurrence, and the chance that it goes undetected until it matters, usually on scales of 1 to 10. Their product, the risk priority number, ranks the list.

Item, illustrativeSeverityOccurrenceDetectionRisk priority
Transfer switch control supply, unmonitored9479 × 4 × 7 = 252
Same item after a monitoring alarm is added9429 × 4 × 2 = 72

Adding monitoring does not make the failure less likely or less severe, but it turns a hidden failure into one found before an outage, which is often the cheapest improvement available. Severity is also looked at on its own: any item scoring 9 or 10 for severity gets an action whatever its product, because a rare failure that drops a hospital theatre is not acceptable just because it is rare.

Running the analysis as a workshop

  • Bring the people who know the system: operators, maintenance staff, the designer and, where possible, the generator and switchgear service engineers.
  • Walk the single-line diagram and the control drawings component by component, in each operating mode.
  • Ask what happened in past incidents and near misses; the site’s own history is the best guide to its weak points.
  • Record each failure mode in the worksheet as it is discussed, with the owner of each action named before the workshop ends.

Common-cause failures

A common-cause failure stops several redundant items for one reason: a fuel contamination that stops every set, a lightning surge that damages every controller, a flood in the room that holds all the switchgear, a wrong setting copied to every relay. The analysis looks for these by asking what the redundant items share: fuel, air, room, cable route, control supply, software, maintenance team, procedure. Each shared factor is either separated or accepted knowingly. See reliability, availability and redundancy engineering.

People and procedures as failure modes

Many critical-power outages start with a person: a wrong switching step, a breaker left in test position, a bypass not restored after maintenance, a setting changed and not recorded. These are failure modes like any other and belong in the worksheet, with actions such as written switching procedures, labelled positions, interlocks that prevent the dangerous step, and a second person to check before a critical operation.

Closing the actions

An FMEA is useful only when its actions are done and proven. Each action has an owner, a date and a test that shows it works: a monitoring alarm is triggered, a second supply is switched off to prove the first carries the load, a new procedure is walked through. The worksheet is updated with the result, and the analysis is repeated after any significant change to the system, so it stays a living record rather than a report on a shelf. See N, N+1, N+2 and 2N power architecture.

Common mistakes

  • Electrical items only; fuel and controls left out.
  • No detection column, so silent failures are missed.
  • Actions not assigned.
  • Never repeated after changes.

What to send us

Send the single-line diagram, control description and auxiliary systems. WhatsApp 98852 01608 or use the application engineering enquiry. See electrical studies.

Evidence note. The extract is illustrative.

Questions engineers ask

What is a risk priority number in an FMEA?

The product of scores for severity, likelihood of occurrence and detection, each usually on a 1 to 10 scale. An unmonitored transfer switch control supply scoring 9, 4 and 7 gives 252; adding a monitoring alarm lowers detection to 2 and the number to 72. Any item with severity of 9 or 10 gets an action regardless of its product.

What is a common cause failure in critical power systems?

A single cause that stops several redundant items at once, such as contaminated fuel stopping every generator, a surge damaging every controller, a flood in the switchgear room or a wrong setting copied to every relay. The FMEA finds them by asking what redundant items share and then separating those shared factors or accepting them knowingly.

Who should take part?

The people who know the system in practice: operators, maintenance staff, the original designer where available, and service engineers for the generators, switchgear and UPS. Their combined knowledge of past incidents, workarounds and site habits finds failure modes that drawings alone never show. A facilitator keeps the workshop moving and records the results.

How often should it be repeated?

After any significant change to the system, such as new sources, new switchgear or changed control logic, and otherwise at a regular interval, commonly every few years. A short review after every serious incident or near miss also keeps it current, because incidents reveal failure modes that the analysis missed.

FMEA or FMECA?

An FMEA lists failure modes and their effects. An FMECA adds a criticality analysis that ranks them by severity and likelihood, sometimes with failure rate data. For most building and plant power systems, an FMEA with a simple severity, occurrence and detection ranking gives the needed result without heavy data requirements.

Is it only for new designs?

No. It is equally useful on existing systems, where years of changes may have introduced single points of failure that nobody intended. On a running site it is combined with a survey and the incident history, and its actions often cost little, such as monitoring, procedures and separating shared supplies.

This guide gives general principles. Rankings should reflect your site’s consequences.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.

CallWhatsAppEnquire