Ground-Potential-Rise, Touch and Step Voltage Studies

How to calculate ground potential rise, touch and step voltages, set tolerable limits from fault clearing time and surface material, and decide when generator earthing needs mitigation.

In short. When fault current enters an earthing grid, the whole grid rises in voltage relative to distant earth. This is ground potential rise. A person touching earthed metal while standing on nearby ground, or standing with feet apart, can bridge part of that voltage as touch or step voltage. A safe design keeps these below allowable limits for the actual fault current and clearing time. A low earth resistance alone does not prove that.

Who this page is for: For consultants and engineers designing or reviewing earthing at substations, transformer yards and generator installations.

Key facts

  • Ground potential rise ≈ grid current × grid resistance.
  • Only the part of fault current entering the soil counts as grid current.
  • Allowable touch and step voltage fall as clearing time rises.
  • Crushed rock on the surface raises the allowable voltage.
  • Closer mesh spacing near equipment lowers touch voltage.
  • Fences and metal services can carry voltage outside the grid.

Worked example: transformer yard (illustrative)

ItemValue
Grid current 3 kA, grid resistance 1 ΩGround potential rise about 3000 V
Worst touch voltage from the grid study (about 25% of rise)about 750 V
Allowable touch, 0.5 s clearing, bare soilabout 190 V: fails
Allowable touch, 0.5 s clearing, 100 mm crushed rockabout 680 V: still fails
Closer mesh at equipment and gate cuts worst touch to about 600 V; allowable with crushed rock at 0.5 s, backup includedabout 680 V: passes

Crushed rock and closer mesh together brought the yard within limits, checked at the 0.5 s backup clearing time. The fence was bonded to the grid, with a perimeter conductor run outside it. Allowable values come from the body-current model of the study method used. See earthing studies.

Do not accept an earthing design on resistance alone. Touch and step voltage depend on fault current, clearing time, soil and grid layout, and a slow backup trip can make a safe design unsafe.

Study inputs

  • Soil resistivity measured at several spacings.
  • Earth fault current and how much returns through the soil.
  • Clearing time, including backup. See coordination.
  • Grid layout, rods and surface layer.
  • Fences, pipes and cables leaving the area.

Touch and step sheet

The yard from the worked example, recorded the way a study should record it. The allowable figures are 681 V touch and 2231 V step over the crushed rock at a 0.5 s clearing time, and 189 V touch and 262 V step on bare soil outside it. Blank rows follow for your own locations.

LocationTouch VAllowable VStep VAllowable VVerdict
Transformer plinth6006813102231Pass
Switchgear room doorway5206812402231Pass
Yard gate, standing outside the surface layer640189420262Fails both — extend the crushed rock and the perimeter conductor past the gate
Perimeter fence, bonded, rock continued 1 m beyond3006811802231Pass
Cable trench edge4806812602231Pass
      
      
      

The gate row is the point of the sheet. Every figure inside the yard passes comfortably, and the one place a person stands on untreated ground while holding earthed metal fails on both touch and step by a wide margin. A study that records only the worst value inside the grid reports a safe yard.

Common mistakes

  • Resistance target treated as safety.
  • Soil resistivity assumed.
  • Fence and gate ignored.
  • Only primary clearing time used.

What to send us

Send the site layout, earthing drawings, soil readings and fault data. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Values are illustrative; a full grid study is needed for design.

How ground potential rise is worked out

Three quantities decide the rise, and only one of them is the earth resistance everybody measures:

GPR = IG × Rg, where IG = Df × Sf × If

Taking the yard in the example above: a 6 kA earth fault with half the current returning through metallic paths gives Sf = 0.5 and a grid current of 3 kA. At a 0.5 s clearing time the decrement factor is about 1.0, so IG stays at 3 kA. Against a grid resistance of 1 Ω that is 3 kA × 1 Ω = 3000 V of ground potential rise.

Note what this means for the usual 1 Ω target. Halving the resistance to 0.5 Ω halves the rise to 1500 V, but so does halving the split factor by bonding in a proper cable sheath return, and that is often the cheaper change. Resistance is one of four terms, not the answer.

Where the allowable voltages come from

The limits are not fixed numbers. They come from how much current a body can tolerate for how long, with the resistance between the person and the ground working in their favour:

Allowable touch = (1000 + 1.5 ρs Cs) × 0.116 ÷ √t

Allowable step = (1000 + 6 ρs Cs) × 0.116 ÷ √t

The 1000 Ω is the body itself. ρs is the resistivity of whatever is under the person’s feet, and Cs derates it for a surface layer thin enough that the soil beneath still has an influence:

Cs = 1 − 0.09 (1 − ρ ÷ ρs) ÷ (2 hs + 0.09)

Working the yard figures through, with 100 Ω·m soil, 3000 Ω·m crushed rock and a 100 mm layer:

  1. Cs = 1 − 0.09 × (1 − 100 ÷ 3000) ÷ (0.2 + 0.09) = 1 − 0.087 ÷ 0.29 = 0.70
  2. ρs Cs = 3000 × 0.70 = 2100
  3. On crushed rock: (1000 + 1.5 × 2100) × 0.116 ÷ √0.5 = 4150 × 0.1640 = 681 V
  4. On bare soil, where ρs is the soil itself and Cs is 1: (1000 + 150) × 0.1640 = 189 V

Those are the 680 V and 190 V quoted in the table above, and the step of 6 rather than 1.5 in the step-voltage formula is why step voltage is so rarely the binding case: the same crushed rock allows 2231 V of step voltage at the same clearing time.

The step of the formula that matters commercially is the surface layer. It multiplies the allowable touch voltage by about three and a half on this site, and it is the cheapest item in the entire design.

Clearing time decides more than the grid does

Every allowable figure above carries a ÷√t. A grid that passes at the primary clearing time can fail outright on the backup, and the backup is the one that operates when something has already gone wrong:

Clearing timeTouch, bare soilTouch, 100 mm crushed rockStep, bare soilStep, crushed rock
0.2 s298 V1076 V415 V3528 V
0.5 s189 V681 V262 V2231 V
1.0 s133 V481 V186 V1578 V
2.0 s94 V340 V131 V1116 V
3.0 s77 V278 V107 V911 V

The yard that passes at 681 V on a 0.5 s trip has an allowable of 278 V if the backup takes three seconds. The same soil, the same grid, the same crushed rock — and a design that was comfortable is now failing by more than a factor of two. This is why a grounding study and a protection coordination study cannot be done independently of each other, and why the clearing time used in the study has to be the one the relay settings actually produce rather than the one the specification hoped for.

What changes the answer, in order of effect

  1. The surface layer. 100 mm of crushed rock took the allowable touch voltage from 189 V to 681 V here. Nothing else on the list comes close for the money, and it has to extend far enough past the equipment and the gate that nobody stands outside it while touching something inside it.
  2. The clearing time. Free to improve if the grading allows it, and ruinous if the backup is slow. Check it before redesigning the grid.
  3. Mesh spacing near equipment. Touch voltage is worst at the corners and edges of a grid and over the middle of a mesh. Tightening the mesh where people actually stand — plinths, doors, operating handles, the gate — is far more effective than tightening it uniformly.
  4. The split factor. Bonding cable sheaths and earth wires so that fault current has a metallic way home reduces the grid current directly, and with it the rise.
  5. Rods into lower-resistivity strata. Useful where a two-layer soil has something better underneath, and close to useless where it does not, which is the reason the soil has to be measured at several spacings rather than assumed.
  6. Grid area. The last resort, because resistance falls roughly with the square root of area: doubling the area buys about 30%, at the cost of the whole site.

Transferred potential: the part that leaves the site

A grid at 3000 V above distant earth is only safe for as long as that 3000 V stays inside the fence. Anything metallic and continuous that crosses the boundary carries it outward, and arrives somewhere nobody studied:

The practical test is simple and it is the one most often skipped: walk the boundary, list every continuous metal object that crosses it, and for each one decide explicitly whether it is bonded, isolated or insulated. “Not considered” is the answer that causes the accidents, and the gate row in the sheet below is the most common instance of it.

Questions engineers ask

Why does clearing time matter?

Because the voltage a body can withstand safely falls as exposure time increases. Allowable touch and step voltages are set for the fault clearing time, so a slower protection scheme lowers the permitted voltage. Faster clearing therefore makes the same earthing system safer without changing the earth grid.

Do small sites need this?

Most small low voltage sites rely on standard earthing and protection practice rather than a full ground potential rise study. Sites with their own high voltage substation, large earth fault currents, poor soil, nearby metal services or public access close to the substation do need one, because touch and step voltages can then be dangerous.

What is a surface layer for?

A layer of crushed rock or similar high resistivity material over the substation ground adds resistance in series with a person standing on it. That limits the current through the body during a fault and raises the touch and step voltages that can be tolerated, often at low cost compared with extending the earth grid.

Is GPR the same as touch voltage?

No. Ground potential rise is the voltage of the whole earth grid relative to distant earth during a fault. Touch voltage is the difference between a touched metal structure and the ground where the person stands, which is usually only part of the ground potential rise, depending on the grid design.

What is the difference between ground potential rise and earth potential rise?

They are two names for the same quantity: the voltage of the whole earthing grid with respect to distant earth during an earth fault. Ground potential rise and the abbreviation GPR are the more common usage in study reports; earth potential rise and EPR mean exactly the same thing. Neither is the voltage a person is exposed to, which is the touch or step voltage and is a fraction of it.

How do you calculate earth potential rise?

Multiply the grid current by the grid resistance: GPR = IG × Rg. The grid current is not the total earth fault current. It is the share that returns through the soil rather than through cable sheaths, earth wires and the neutral, adjusted for the direct current offset in the first cycles. The worked section above takes a 6 kA fault down to a 3 kA grid current and a 3000 V rise against a 1 ohm grid.

What is an acceptable earth potential rise?

There is no single figure, because the rise itself is not the safety criterion. A 3000 V rise can be perfectly safe with a surface layer, a tight mesh where people stand and a fast trip, and a far smaller rise can be unsafe without them. What has to pass is the touch and step voltage at each location against the allowable value for the actual clearing time, which is what the sheet below records.

Does a 1 ohm earth resistance mean the earthing is safe?

No, and this is the single most common misunderstanding in earthing. Resistance is one of four terms in the rise, and the rise is not the limit that matters. A 1 ohm grid carrying 3 kA sits at 3000 V, and whether that is safe depends on the surface layer, the mesh geometry, the soil and above all the clearing time. A measured resistance is evidence that the grid was built; it is not evidence that it is safe.

This guide gives general principles. Use the applicable standard and qualified design.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.