Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Transformer Energisation and Inrush Studies Guide

Why energising a transformer draws large inrush, what sets its size and duration, how it affects generators and protection, and ways to reduce it through sequencing and soft energisation.

In short. When a transformer is switched on, its core can saturate and draw a magnetising inrush current many times its rated current, decaying over cycles to seconds and rich in second harmonic. On the grid this is usually a nuisance; on a generator it can be a real problem. The surge depresses the generator’s voltage, can trip overcurrent and differential relays, and if several transformers are energised together it can stall the set. An inrush study estimates the surge and sets a switching sequence and protection settings that ride through it.

Who this page is for: For engineers restarting plants on generator supply, energising step-up or distribution transformers from a generator, or troubleshooting trips at switch-on.

Key facts

  • Peak inrush is often around 8 to 12 times rated current, decaying over cycles to a second or more.
  • The size depends on residual flux and the point on the voltage wave when the breaker closes.
  • Inrush is rich in second harmonic, which differential relays use to block tripping.
  • A stiff source gives a higher, longer inrush; a generator gives a deeper voltage dip.
  • Energising transformers one at a time, with a few seconds between, is the simplest fix.
  • Inrush happens whether or not the transformer has load connected.

What causes inrush

A transformer core normally runs just below saturation. At switch-on the flux must start from whatever residual flux the last switch-off left. If the closing point on the voltage wave pushes the flux the same way as the residual, the core is driven into saturation and the magnetising current spikes. The current is asymmetric, flows mainly in one polarity of each cycle, and decays as the flux offset dies away.

What makes it worse

  • A large transformer relative to the source.
  • High residual flux, especially after a trip.
  • Closing at an unfavourable point on the voltage wave.
  • Several transformers energised together.
  • Energising next to a live transformer, which can draw sympathetic inrush.

Worked example: relay settings and restart sequence (illustrative)

A 1000 kVA, 11 kV / 415 V transformer is fed from an 11 kV feeder relay.

StepWorkingResult
Rated primary current1,000,000 ÷ (1.732 × 11,000)About 52.5 A
Peak inrush at about 10 times52.5 × 10About 525 A, decaying over roughly 100 ms or more
Existing instantaneous setting150 A, no delayTrips on energisation
Revised settingInstantaneous above the inrush peak, or a short delay that outlasts the inrushRides through; still checked against the transformer damage curve and the fault level

The same site restarts on a 1500 kVA generator with three such transformers on one bus. Energising all three together drew a combined surge that collapsed the voltage and tripped the set. The new sequence energises one transformer at a time, a few seconds apart, before any load is connected, and the restart now succeeds. See voltage-dip studies.

Do not energise several transformers together from a generator. Stagger them, energise them before connecting load, and check that protection set for the grid does not trip on the inrush.

Effects on generator systems

EffectWhy
Voltage dip and distortionA large, low power-factor, harmonic-rich current through the generator’s reactance
Frequency disturbanceA sudden real and reactive power demand
Nuisance relay tripsOvercurrent and differential elements see the surge
Mechanical stressForces on windings
ResonanceHarmonics magnified where capacitors are connected

Mitigation

  • Energise one transformer at a time with a delay between.
  • Energise from the generator before other loads.
  • Use second-harmonic blocking on the transformer differential relay.
  • For large units, consider controlled (point-on-wave) switching or pre-insertion resistors.
  • Where the design allows, ramp the generator voltage up with the transformer already connected.

Study steps

  1. Collect transformer data: rating, impedance and the maker’s inrush figures if available.
  2. Model the source: grid fault level or generator reactances.
  3. Estimate the inrush peak, decay and voltage dip.
  4. Check relay settings against the inrush. See transformer protection.
  5. Define the energisation sequence and delays.
  6. Prove it with a recorded restart.

Energisation plan

The energisation plan for the same site, which has three transformers on one 11 kV board rather than the single 1000 kVA unit worked through in the example above. The generators here sit on the 415 V side and never energise a transformer, so this plan is about the 11 kV relay and the order of restoration after an outage — a different problem from a generator restart, and one that the fourth column settles before the third is even needed.

TransformerkVARated current (A)Estimated inrush peak (A)Sequence and delay
T1, main plant2000105 at 11 kVAbout 1050 at ten times, decaying over roughly 100 ms or moreFirst. Energised with its 415 V incomer open
T2, process block160084About 840Second, 5 s after T1
T3, services and offices63033About 330Third, 5 s after T2
All three closed together4230222About 2220Not permitted. This is the case the existing scheme would have attempted
11 kV feeder relay, as found———Instantaneous 600 A, no delay. Trips on T1 alone, let alone all three
11 kV feeder relay, as left———Instantaneous raised to 1500 A, above T1’s peak and well below the 18.4 kA fault level, so the element still protects. A 0.1 s delay was the alternative and was not needed
415 V incomers———Closed only after all three transformers are energised and stable, then the load restored in its own steps
     
     

The rated currents come straight out of the rating: 2,000,000 divided by 1.732 times 11,000 is 105 A, and the same arithmetic gives 84 and 33 for the other two. Ten times each of those is 1050, 840 and 330 A of inrush peak, and the fourth row is the one that matters — closed together they are 2220 A, nearly four times the setting the relay was actually carrying. The existing 600 A instantaneous element would have tripped on T1 by itself, which means this site could not have restored at all after a deep outage, and nobody had found that because the three transformers had never been de-energised together.

Raising the element to 1500 A is the whole fix, and the check that makes it legitimate is in the same cell. At 350 MVA the 11 kV fault level is about 18.4 kA, so an instantaneous element at 1500 A still sees a fault at roughly twelve times its pickup — it has not been blinded, it has been moved out of the way of a magnetising transient. The alternative, a 0.1-second delay that outlasts the inrush, would have worked equally well and was rejected only because it adds a tenth of a second to every genuine 11 kV fault for no gain here.

The sequence column does the rest, and the five-second gaps are not arbitrary. Inrush decays over cycles to a second or more, so the gap has to outlast the decay rather than the peak; five seconds is comfortable and short enough that the whole restoration adds ten seconds. Energising the largest transformer first is deliberate too: T1 faces the stiffest source and gives the worst inrush, so it is taken while the board is otherwise unloaded and nothing else is being disturbed.

Two details in the last column are worth copying. Each transformer is energised with its 415 V incomer open, so inrush is the only transient on the 11 kV side and no load current is confused with it — and that also means inrush happens whether or not load is connected, which is the point people most often get wrong when they assume an unloaded transformer draws nothing.

And the 415 V incomers close only after all three transformers are up and stable, which keeps the two problems separate: transformer magnetising on the high-voltage side first, then load restoration in its own steps on the low-voltage side, where the load list and the motor start sheet govern the order.

One caution about the inrush figures themselves. Ten times rated current is a working estimate; the real peak depends on residual flux in the core and on where the breaker contacts meet on the voltage wave, so the same transformer can give a noticeably different peak on two consecutive closings. That is why the relay was set above the estimate with margin rather than just above it, and why the plan was proved by energising each transformer and capturing the actual current rather than by accepting the calculation. A setting chosen to sit exactly at a calculated peak will eventually meet a closing that beats it.

Mitigation options compared

MethodHow it helpsTypical use
Energise one transformer at a timeSpreads the inrush so the source recovers between stepsEvery generator-fed restart
Energise with little or no load connectedKeeps load current from adding to the dipRestarts and commissioning
Controlled point-on-wave switchingCloses each pole at the instant that minimises flux offsetLarge transformers, frequent switching
Pre-magnetising from a small sourceBrings the core to normal flux before the main breaker closesLarge units on weak sources
Larger generator or alternator frameReduces the voltage dipWhen sequencing alone is not enough

Recording an energisation

Record current and voltage with a fast power quality analyser during the first energisation on each source: the peak current, how long it takes to fall to rated, the lowest voltage and any protection that picked up. The record confirms the settings and gives a baseline. If later energisations trip when the first did not, the difference often lies in residual flux after a trip, a sympathetic inrush from a neighbouring transformer, or a changed source. See time-current coordination engineering.

Common mistakes

  • Instantaneous settings below the inrush.
  • Energising all transformers together after an outage.
  • Ignoring the harmonic distortion of the generator voltage.
  • Connecting load before the transformers are energised.

What to send us

Send transformer and generator data, relay settings and the present restart sequence. WhatsApp 98852 01608 or use the enquiry form. See also the inrush screening tool.

Evidence note. Inrush multiples and durations are typical values for illustration; the transformer maker’s data govern.

Questions engineers ask

How can transformer inrush be reduced on generator supply?

Energise one transformer at a time with little or no load connected, so the set recovers between steps. Where that is not enough, controlled point on wave switching closes each pole at the instant that minimises flux offset, pre magnetising brings the core to normal flux first, and a larger alternator frame reduces the voltage dip.

Why can a transformer trip on energising when it did not before?

Inrush depends on residual flux and the closing instant, so it varies from one energisation to the next. Residual flux left by a trip, sympathetic inrush drawn by a neighbouring transformer, or a weaker or different source can all give a larger surge. Recording each energisation with a fast analyser shows which applies.

How long does inrush last?

The highest peaks fall within the first few cycles, but the current can take from a fraction of a second to several seconds to return to normal magnetising levels, longer for large transformers with low losses. On a generator the decay can be slower because the voltage dip reduces the flux recovery.

Why does the generator trip on energising?

The inrush depresses the generator voltage and can operate its overcurrent or undervoltage protection, or trip the transformer feeder relay if its instantaneous setting sits below the inrush peak. Energising several transformers together, or with load connected, makes it much worse, so the study sets a sequence and settings that ride through it.

Does a no-load transformer cause inrush?

Yes. Inrush is a magnetising effect of switching the core on, so it occurs whether or not load is connected. Load connected at the same moment adds its own current to the surge, which is why transformers on generator supply are energised first and loaded afterwards.

Can inrush be eliminated?

Not entirely with ordinary switching, but it can be greatly reduced. Controlled point on wave switching, pre magnetising and energising transformers one at a time on a stable source keep it to levels that the source and protection can accept without tripping, which is what a practical design needs.

Values are illustrative. Use manufacturer inrush data for design.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.

CallWhatsAppEnquire