In short. When load is switched onto a generator, electrical demand rises instantly but the engine needs time to add fuel and air. The rotor slows and frequency dips until the governor catches up. Voltage dips too, while the voltage regulator responds. The size of the dip depends on the step size, the starting load, the engine and its turbocharger. Whether the dip is acceptable depends on what the connected equipment can tolerate.
Who this page is for: For engineers setting changeover and restart sequences, and checking generator response for UPS, drives and process loads.
Key facts
- Frequency follows speed: a 4-pole set at 1500 rpm gives 50 Hz.
- Large load steps cause a frequency dip; load loss causes an overspeed.
- Turbocharged engines need time to build boost.
- The maker’s load acceptance data shows how big a step the set can take.
- Splitting load into timed steps reduces the dip.
- Check what the UPS, drives and controls tolerate.
Worked example: 400 kW set picking up 200 kW on transfer (illustrative)
| Option | Frequency dip (maker’s transient data) | Result |
|---|---|---|
| 200 kW in one step (50%) | about 7%, to 46.5 Hz (1395 rpm) | Outside this UPS’s ±5% input window: it stays on battery |
| Two steps of 100 kW, 5 s apart | about 3–4% each | UPS accepts; drives ride through |
| Load rejection: 200 kW tripped at once | Overspeed, then recovery | Within overspeed margin |
Two timed steps cost a few seconds and avoided a larger generator. The UPS input ramp was also slowed. See generator sizing and changeover studies.
Do not connect the whole essential load in one block just because the final kW is within rating. The step, not the total, mainly sets the frequency dip.
Ways to reduce the dip
- Timed load steps after changeover.
- UPS input ramp and limited recharge.
- Soft starters and drives on large motors.
- Sets with better load acceptance, or more sets online.
- Load shedding when a set trips. See multi-generator N+1.
Load step sheet
| Step | kW | Delay after previous step | Expected dip | Equipment tolerance |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 |
Worked example: what happens in the first second (illustrative)
The governor cannot add fuel instantly, so for the first fraction of a second the step is carried by the stored energy of the rotating engine and alternator. The initial rate of frequency fall is roughly the step, as a fraction of the set rating, times 50 Hz divided by twice the inertia constant H.
| Case, 500 kVA (400 kW) set, 200 kW step | Step on the kVA base | Initial rate of fall |
|---|---|---|
| Inertia constant about 1.0 s | 200 ÷ 500 = 0.4 | 0.4 × 50 ÷ 2 = 10 Hz per second |
| Heavier flywheel, about 1.5 s | 0.4 | 0.4 × 50 ÷ 3 ≈ 6.7 Hz per second |
| Two 100 kW steps, each | 0.2 | 0.2 × 50 ÷ 2 = 5 Hz per second |
At 10 Hz per second, frequency would fall 3.5 Hz, the 7% dip in the example above, in about a third of a second, which is roughly the time a turbocharged engine needs before the governor’s extra fuel is matched by extra air. More inertia slows the fall and buys the governor time; a smaller step halves the rate. That is why both a flywheel and step splitting help, and why only the second costs nothing.
Performance classes and what they promise
Generator set standards group transient performance into classes, commonly quoted for load acceptance as below. Check the edition in force and, above all, the set maker’s declared figures for the actual engine and alternator.
| Class | Typical use | Frequency dip on load increase | Frequency recovery | Voltage dip |
|---|---|---|---|---|
| G1 | Simple loads such as lighting and heating | About 15% | About 10 s | About 25% |
| G2 | General loads, pumps, fans | About 10% | About 5 s | About 20% |
| G3 | Sensitive loads, IT, telecom | About 7% | About 3 s | About 15% |
The class applies to a defined step size from a defined starting load. A set may meet G3 for a 30% step and fail it for 50. Ask the maker for the step size behind every class claim.
Worked example: designing the restart steps (illustrative)
A 400 kW set must pick up 320 kW of essential load after a mains failure. The maker allows a first step of about 35% from no load and further steps of about 30% once loaded, for a dip within the UPS’s 5% window.
| Step | Loads | kW | Allowed by the maker | Running total |
|---|---|---|---|---|
| 1, at transfer | Lighting, controls, UPS input ramped over 15 s | 120 | 0.35 × 400 = 140 | 120 |
| 2, after 5 s | Pumps on soft starters | 100 | 0.30 × 400 = 120 | 220 |
| 3, after 10 s | Air handling on drives | 100 | 120 | 320 |
Every step sits inside its allowance, and the whole load is on within about fifteen seconds of transfer. The sequence lives in the changeover controller or a simple timer chain, and it must restart from step 1 if the set trips and recovers.
Why some engines accept less
Modern engines with high power density run at high brake mean effective pressure, and their turbochargers need exhaust energy, which only comes from load, before they can deliver the air for more fuel. The result is that a compact, efficient engine may accept only about a third of its rating in the first step, while an older or larger-displacement engine of the same kVA accepts more. When load acceptance matters, compare sets on their declared step performance, not only on rating and fuel consumption.
Load rejection and overspeed
Losing a large block of load, for example when a downstream breaker trips, makes the set overspeed until the governor cuts fuel. Overspeed protection is commonly set around 110 to 115% of rated speed, so a full-load rejection must not take the set past that point. Check the maker’s rejection data, and avoid control logic that dumps all load at once during a planned stop: unloading in a ramp prevents both the overspeed and the voltage rise that comes with it.
Proving the response on site
- Use a load bank to apply each planned step, and record frequency and voltage at a fast sample rate, at least several readings per cycle of the governor’s response.
- Read the lowest frequency, the lowest voltage and the time to recover within limits for each step.
- Repeat with the actual loads in their planned sequence, with the UPS and drives connected.
- Test a full load rejection and record the peak speed.
Keep the records as the baseline. A set whose dip on the same step grows over the years is telling you about its fuel system, turbocharger or governor before it fails to carry the load.
Governor tuning and its limits
A governor tuned for a fast response reduces the dip but can make the set hunt, oscillating around nominal speed, especially in parallel with other sets. Tune for the best response that remains stable at light and full load, with the actual loads connected. Tuning cannot overcome the engine’s air supply: once the governor is fast enough, the turbocharger sets the limit, and only smaller steps or more inertia help further.
Steps on sets running in parallel
With two equal sets sharing a bus, a load step divides between them, so each sees half and the dip is close to that of half the step on one set. The harder case is the loss of a set: the survivor suddenly picks up its partner’s whole load, which may be a step of 50% or more of its rating. If that exceeds what the engine accepts, frequency falls until under-frequency protection or load shedding acts. Size the shedding for the loss of the largest running set at the highest load the plant allows, and test it with a real trip at high load.
The voltage side of the same step
A load step also pulls the voltage down while the regulator raises the excitation, and motor loads make it worse because their starting current is mostly reactive. Many contactors drop out at around 70 to 75% of rated voltage, and some drives and controls trip at higher voltages than that, so a deep voltage dip can disconnect loads that the frequency dip alone would not. Check both dips for every step, and use soft starters or drives on large motors so that their contribution to the voltage dip is limited. See motor starting and voltage dip studies.
Recording the acceptance test
A load step test is only useful later if it was recorded properly. Note the generator rating, the ambient temperature, the load before and after each step, the lowest frequency and voltage reached, the time to recover within the band, and the governor and regulator settings in use. Keep the recorder traces with the commissioning file. When the set is overhauled, a governor is replaced or the load changes, repeat the same test and compare it with the original record, so that any loss of response shows clearly before a real outage reveals it.
Common mistakes
- Checking final load only.
- One block on changeover.
- Ignoring load rejection.
- UPS input window not checked.
What to send us
Send the generator data, the changeover sequence and the loads that switch on together. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Values are illustrative; use the maker’s transient data.
Questions engineers ask
How fast does frequency fall when load is added to a generator?
Initially at about the step, as a fraction of the set kVA rating, times 50 Hz divided by twice the inertia constant. A 200 kW step on a 500 kVA set with an inertia constant of 1.0 s starts falling at about 10 Hz per second; split into two 100 kW steps, each starts at about 5 Hz per second, which gives the governor time to respond.
What do generator performance classes G1, G2 and G3 mean?
They are transient performance classes for generator sets. Commonly quoted load-acceptance limits are a frequency dip of about 15, 10 and 7%, recovery in about 10, 5 and 3 s, and a voltage dip of about 25, 20 and 15% for G1, G2 and G3. A class applies to a stated step size, so ask the maker which step it was proven for.
What frequency dip is acceptable?
It depends on the most sensitive load on the set. A UPS may reject the generator outside a 5% window, drives may trip on deep dips, and simple loads tolerate far more. List each load tolerance first, then design the steps so the worst dip stays inside the tightest one, and confirm it with a load-bank test.
Does a flywheel help?
More inertia slows the initial fall of frequency, giving the governor time to respond, so the dip is smaller. With an inertia constant raised from 1.0 to 1.5 s, the initial rate for the same step falls by a third. But inertia does not make the engine add fuel and air any faster, so very large steps still need splitting.
Can batteries help?
Yes. A battery inverter can supply a load step within milliseconds while the engine catches up, so the generator sees a ramp instead of a step. It can also cover the first seconds after transfer. The battery must be controlled so that its own trip does not hand the generator a larger step than it can accept.
Is isochronous mode better?
For a single set, isochronous control returns frequency to exactly 50 Hz after each step, which suits frequency-sensitive loads. It does not reduce the initial dip, which is set by the step, inertia and engine. In parallel, isochronous sets need load-sharing controls, or one set will try to take every change.
This guide gives general principles. Use manufacturer data for design.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.