In short. Running a generator in parallel with the grid raises questions the standby case never asks. How much fault current does it add? Can it export? What happens if the grid trips while it is connected? Who must approve it? An interconnection study answers each of these with calculations, protection settings and tests the utility can accept, before the first parallel close.
Who this page is for: For consultants, plant engineers and owners planning closed-transition transfer, peak lopping or export with generators.
Key facts
- Standby with open transition needs no interconnection study; any parallel does.
- The generator adds fault current to the grid and to site switchgear.
- Loss-of-mains protection must disconnect the set quickly if the grid trips.
- Export needs agreement on limits, metering and protection.
- Earthing must suit both sources in parallel.
- The utility’s written approval comes before the first parallel close.
Interconnection modes
| Mode | Description | Study needed |
|---|---|---|
| Standby, open transition | No parallel | Basic transfer study |
| Closed transition | Momentary parallel on transfer | Fault level, sync, time limit |
| Peak lopping without export | Long parallel, import kept above zero | Plus loss of mains, reverse power to grid |
| Export | Power sent to the grid | Full interconnection study and agreement |
Worked example: peak lopping with no export (illustrative)
| Item | Finding | Setting or decision |
|---|---|---|
| Generator fault contribution | About 11 kA added to a 25 kA grid fault level: 36 kA | Breakers rated 50 kA confirmed adequate for 36 kA, including peak making current; one 25 kA feeder breaker replaced |
| Import limit | Never below 50 kW import | Controller limits set output; reverse power relay on the incomer trips the set if import falls below zero |
| Loss of mains | Grid trip must disconnect the set | Rate-of-change-of-frequency and voltage vector shift protection, plus over and under voltage and frequency |
| Earthing | Two star points in parallel | Generator star point bond switched out while in parallel, and interlocked so it is restored before the set runs alone |
| Approval | Study and settings submitted | Witnessed test before first parallel |
See generator short-circuit contribution and paralleling studies.
Never parallel a generator with the grid without the utility’s approval and working loss-of-mains protection. A set that keeps feeding a tripped grid line can endanger line workers and damage equipment when the grid recloses.
Study items
- Fault levels with the set connected.
- Protection: loss of mains, reverse power to grid, voltage and frequency.
- Earthing in parallel. See earthing studies.
- Synchronising and closing. See utility and DG synchronisation.
- Load data. See load list and maximum demand.
Interconnection checklist
| Item | Result |
|---|---|
| Mode (closed transition, peak lopping, export) | |
| Fault level with set connected | |
| Loss-of-mains protection | |
| Earthing in parallel | |
| Utility approval and witnessed test |
Loss-of-mains protection: the methods and their limits
| Method | What it detects | Strength | Weakness |
|---|---|---|---|
| Rate of change of frequency | Frequency moving faster than a set rate, often about 0.5 to 1 Hz per second | Fast when the island is out of balance | Slow or blind when site load and generation nearly match |
| Voltage vector shift | A sudden jump in voltage angle, often about 6 to 12 degrees | Very fast on a sudden change | Can trip on grid disturbances; blind to a balanced island |
| Under and over voltage and frequency | Values outside a set band | Simple and reliable backup | Slow if the island stays near normal |
| Intertripping | A signal from the utility breaker that opened | No blind zone | Needs a secure communication link and utility cooperation |
| Reverse power or import limit at the incomer | Power flow toward the grid | Catches an island in a no-export scheme | Only where export is never allowed |
Worked example: when the island is balanced (illustrative)
When the grid trips, the frequency of the island starts to change at a rate set by the mismatch between generation and load. The initial rate is about the mismatch, as a fraction of the generator kVA, times 50 Hz divided by twice the inertia constant H.
| Case, 625 kVA set, H about 1.0 s | Mismatch | Initial rate of change | With a 1 Hz per second setting |
|---|---|---|---|
| Set exporting 400 kW, site load 200 kW | 200 kW | 200 ÷ 625 × 50 ÷ 2 = 8 Hz per second | Trips at once |
| Set at 400 kW, site load 420 kW | 20 kW | 20 ÷ 625 × 50 ÷ 2 = 0.8 Hz per second | May not trip |
| Set at 400 kW, site load 400 kW | Almost none | Near zero | Does not trip on this function |
This blind zone is why a no-export scheme keeps a minimum import, such as 50 kW: the loss of the grid then always creates a mismatch and a reverse-power condition at the incomer. Where export is allowed and the blind zone cannot be closed by settings, intertripping from the utility breaker is the robust answer.
Racing the utility auto-reclose
Many overhead networks reclose their breakers automatically after a short dead time, often from a fraction of a second to a few seconds, to clear transient faults. If the generator is still connected to the island when the utility recloses, the two systems meet out of phase, with the same damage as a bad synchronising close, and line workers may face a live line they believed dead. Loss-of-mains protection must therefore separate the generator well inside the shortest reclose time. The study obtains the reclose times from the utility and shows the total disconnection time, relay plus breaker, against them.
How the controls change in parallel
| Quantity | Island, set alone | Parallel with grid |
|---|---|---|
| Speed or frequency | Governor holds 50 Hz | Grid holds frequency; governor sets kW output |
| Voltage | Regulator holds bus voltage | Grid holds voltage; regulator sets kVAr or power factor |
| Load | Set takes whatever load is connected | Set produces a chosen kW; the grid supplies the rest |
A regulator left in voltage control while paralleled fights the grid: a small difference between its setpoint and the grid voltage drives large reactive currents, and the set can be pushed into over-excitation or loss of excitation. The controller must switch the regulator to power factor or kVAr control at the moment of paralleling, and back to voltage control when the grid breaker opens.
Voltage rise and power quality at the connection
A generator exporting through a long feeder raises the voltage at the point of connection, because the export current flows through the feeder impedance in the opposite direction to normal load. The utility sets a limit on that rise, and the study calculates it at minimum load with maximum export. Operating the set at a slightly absorbing power factor, taking a little reactive power, can hold the voltage down. The utility may also set limits for harmonic distortion, flicker and unbalance at the connection, which the study checks with the generator running.
Generator response to faults on the grid
A fault on the utility network draws current from the generator as well as from the grid. The generator protection must ride through distant faults that the utility will clear, if the utility requires it, and must trip for faults that the utility protection cannot see because the generator is feeding them. The generator’s contribution can also reduce the current that a utility relay measures, delaying its operation. The study models faults on the utility feeder with and without the set connected and agrees the settings with the utility protection engineer.
The submission pack for the utility
- Single-line diagram showing the connection point, metering, protection and the generator neutral arrangement.
- Generator data: rating, reactances, inertia, governor and regulator type and control modes.
- Fault level study with and without the generator, at the connection point and site boards.
- Protection settings: loss of mains, voltage and frequency, reverse power, overcurrent and earth fault, with trip times.
- Export or import limits and how they are enforced.
- Synchronising method and closing conditions.
- A test plan for the witnessed commissioning.
The witnessed commissioning test
The utility usually witnesses a test before allowing permanent parallel operation. It typically proves each protection function by secondary injection, then shows a real loss-of-mains trip by opening the incomer with the set paralleled, and records the disconnection time. For no-export schemes it shows that the import limit holds and that reverse power trips the set. Keep the test records with the approval letter; any later change to settings, the generator or the protection relays needs the utility to be informed and often a repeat of the test.
The operating procedure for parallel running
Parallel operation brings duties that standby operation never had, and the people running the plant must know them. The procedure states who may start parallel running and when, the import or export limits, what to do when the utility requests disconnection, how to respond to a loss-of-mains trip, and when the protection must be retested.
It also lists the alarms that must stop parallel running at once, such as a failed protection relay, a loss of the intertrip link or a fault on the synchronising equipment. Keep the procedure at the control panel, train every operator on it, and review it whenever the settings, the generators or the utility requirements change. See synchronising and paralleling studies.
Earthing while paralleled
When two earthed sources run in parallel, neutral current can circulate between their star points, and earth fault protection can measure the wrong current. The usual answer, shown in the worked example above, is to open the generator star point bond while paralleled and restore it, by interlock, before the set runs alone. The earthing study confirms that every operating mode keeps exactly one effective earth point per system.
Common mistakes
- Parallel without approval.
- Fault level not rechecked.
- No loss-of-mains protection.
- Two star points bonded in parallel.
What to send us
Send the single-line diagram, generator data, utility fault level and the mode you want. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Values are illustrative; utility requirements and studies govern.
Questions engineers ask
Why can loss-of-mains protection fail to trip when the grid is lost?
Rate of change of frequency and vector shift protection respond to the mismatch between generation and site load. A 625 kVA set exporting 200 kW more than the site uses sees about 8 Hz per second and trips at once, but a mismatch of 20 kW gives only about 0.8 Hz per second, under a 1 Hz per second setting. A minimum import or intertripping closes this blind zone.
Why must the voltage regulator change mode when a generator parallels with the grid?
In parallel the grid fixes the voltage, so a regulator left in voltage control fights it, and a small setpoint difference drives large reactive currents that can over-excite the set or pull it toward loss of excitation. The controller switches the regulator to power factor or kVAr control when the sets parallel, and back to voltage control when the grid breaker opens.
Do I need permission to parallel?
Yes. Any operation that parallels a generator with the utility network, even for a moment during a closed transition, needs the written approval of the distribution company, usually after it has reviewed the fault level study, protection settings and synchronising method, and witnessed a commissioning test of the loss-of-mains protection.
What is loss-of-mains protection?
Protection that detects when the utility supply has been lost while the generator is paralleled, and disconnects the generator before the island it feeds can endanger line workers or meet the grid out of phase on reclose. It uses rate of change of frequency, vector shift, voltage and frequency limits, reverse power or intertripping.
Can I avoid export?
Yes. A no-export scheme holds a minimum import at the incomer through the generator controller, with a reverse power relay as a backup that trips the set if power begins to flow toward the grid. Keeping a margin of import also makes loss-of-mains detection more reliable, because losing the grid always creates a mismatch.
Does paralleling raise fault level?
Yes. While paralleled, site switchgear sees the grid contribution plus the generator contribution, which can take breakers beyond their rating. The utility network also sees the added current. The study calculates the fault level with the set connected and confirms that every breaker and busbar can break, make and withstand it.
This guide gives general principles. Follow the utility’s requirements and applicable regulation.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.