Engineering Guides and Decision Tools

Step-by-step guides and decision tools for generator sizing, motor starting, fuel, cables, transformers, UPS, BESS and critical power.

In short. These calculators and decision tools take an engineering question one step at a time, from a load list to an answer you can check. They cover generator sizing, motor starting, multi-generator plants, fuel and runtime, cables and transformers, power factor and harmonics, UPS and battery storage, and critical power architecture. Each page explains the method and gives a worked example. A tool gives a first answer, not a final design.

Who this section is for: For owners, facility managers, electricians and consultants who want a quick, explained first answer before a detailed design.

Key facts

  • Start with the load list; most other tools depend on it.
  • Generator size is the largest of the running, starting and redundancy checks.
  • Check engine kW as well as alternator kVA.
  • Decision tools give a first screen from a few questions.
  • Answers marked provisional need the unanswered items confirmed.
  • The calculations run in your browser.

How the tools are organised

GroupTypical questionStart with
Load and sizingHow big a generator?Maximum demand
Motors and load stepsWill the set start this motor?Motor starting
Several generatorsHow many sets, and which run when?Number of generators
Fuel and runtimeHow long will the fuel last?Fuel tank and runtime
Cables and transformersIs the cable or transformer big enough?Cable and voltage drop
Power qualityPower factor, harmonics or another problem?Power quality finder
UPS and battery storageHow big a UPS or battery?UPS capacity
Architecture and decisionsWhich arrangement suits us?Solution navigator

Worked example: sizing a set with three tools (illustrative)

ToolResult
Maximum demand, default load list49.7 kW at peak; 100 kVA on the running check
Motor starting: 11 kW lift started direct-on-lineAbout 125 kVA to hold the dip to 15% (transient reactance 0.22)
DecisionUse a reduced-current starter or drive on the lift (as the lift type allows) and keep 100 kVA, or choose 125 kVA

Using only the first tool would have missed the lift. See generator capacity checks.

Do not order equipment from a tool’s first answer alone. Confirm the inputs, check every limiting case, and have the final design reviewed.

Where to start

If your question is…Start with
Not sure which study you need?Study selector
N, N+1 or 2N?Redundancy selector
Retrofit or replace an old set?Retrofit decision tool

Inputs to have ready

InputValue
Load list with kW and power factor 
Largest motor and starting method 
Redundancy needed 
Backup time needed 

What to send us

Send your tool results and inputs for a checked design. WhatsApp 98852 01608 or use the application engineering enquiry.

All 42 guides in this section

Questions engineers ask

Can I size a generator from the total connected load?

Not reliably. Adding nameplates overstates the running load, while ignoring the largest motor start understates the generator needed. Build a load list, apply diversity, then check the largest step load.

How accurate are these guides?

They give screening-level answers based on stated typical values. Final sizing should use the actual equipment data and site conditions.

Engineering content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026. For advice on your own site, send us your requirement or call 98852 01608.