In short. Starting an induction motor draws several times its running current at a low power factor, and that sudden demand pulls the generator’s voltage down. A set sized only for the running load may stall, drop contactors or trip when the largest motor starts. Work out the motor’s starting kVA, estimate the dip it causes on the generator, add the load already running, and if the dip is too deep, change the starting method before buying a bigger set.
Who this page is for: For buyers, consultants and plant engineers sizing a generator for pumps, motors, chillers and other large motors.
Key facts
- Motor input kVA ≈ shaft kW ÷ (efficiency × power factor).
- Starting kVA ≈ input kVA × starting multiple (about 5 to 7 direct-on-line).
- Screening dip ≈ starting kVA ÷ (starting kVA + generator kVA ÷ X′d).
- Contactors and electronics often tolerate a dip of about 15 to 20% or less.
- Soft starters cut starting current to about 2 to 4 times running; drives to about 1 to 1.5.
- Start the largest motor first, while the set is lightly loaded.
Working out starting kVA
A 75 kW motor at about 0.93 efficiency and 0.88 power factor takes about 92 kVA when running. At six times, its starting demand is about 550 kVA for a few seconds. The motor data sheet’s locked-rotor current or code letter gives the real multiple.
Worked example: a 75 kW pump on three set sizes (illustrative)
Each generator has an X′d of about 0.25. The figures assume no other load is running; load already on the set deepens the dip and reduces the margin.
| Generator | Effective short-circuit kVA | Direct-on-line start (550 kVA) | Soft start at 3 times (about 275 kVA) |
|---|---|---|---|
| 250 kVA | 1000 | 550 ÷ 1550 ≈ 35%: likely stall or trip | 275 ÷ 1275 ≈ 22%: contactors may drop |
| 500 kVA | 2000 | 550 ÷ 2550 ≈ 22%: contactors may drop | 275 ÷ 2275 ≈ 12%: acceptable |
| 750 kVA | 3000 | 550 ÷ 3550 ≈ 15%: borderline | 275 ÷ 3275 ≈ 8%: comfortable |
A 500 kVA set with a soft starter performs better than a 750 kVA set starting direct-on-line, at lower cost and with better light-load running for the rest of the day. The screening ignores cable impedance and voltage-regulator response, so confirm with the maker’s motor-starting data. See motor starting and voltage dip studies.
Do not buy a bigger generator just to start one motor direct-on-line. Check a soft starter or drive first; it usually costs less, cuts the dip more, and leaves the set better loaded for the rest of the day.
Starting methods
| Method | Starting current (× running) | Notes |
|---|---|---|
| Direct-on-line | 5 to 7 | Simple; hardest on the generator |
| Star-delta | About one-third of DOL | Reduced torque; transition spike |
| Autotransformer | Depends on tap | Reduced current and torque |
| Soft starter | About 2 to 4 | Smooth and adjustable |
| Variable speed drive | About 1 to 1.5 | Lowest dip; adds harmonics |
See the starting method selector.
Screening steps
- List the largest motors with their starting kVA.
- Note the load already running when each starts.
- Estimate the dip for each start on the chosen set.
- Compare with the most sensitive load’s tolerance.
- If too deep, change the starting method, the start order or the set size.
Alternator and excitation
An alternator with lower reactance, or one oversized relative to the engine, gives a smaller dip. PMG or auxiliary-winding excitation holds voltage up better during the start. Ask for the set’s motor-starting kVA curve at the allowed dip.
Motor starting worksheet
The starting check for the same pharmaceutical block, run against the plant its demand sheet pointed at: two 750 kVA sets carrying 687 kW. The worked example above takes one motor across three set sizes and finds the soft starter beats the bigger generator; this sheet takes the site’s three largest motors across the methods available to each, and the result decides the generator plant rather than confirming it.
| Motor | kW | Starting method and multiple | Starting kVA | Running load at start (kVA) | Estimated dip (%) |
|---|---|---|---|---|---|
| CH-01 chiller | 160 | Direct-on-line, 6 × | 1148 | 587 | 23.9. Rejected |
| CH-01 chiller | 160 | Soft starter, 3 × | 574 | 587 | 13.6. Rejected |
| CH-01 chiller | 160 | Variable-speed drive, 1.2 × | 230 | 587 | 5.9. Accepted |
| AC-01 compressed-air plant | 75 | Direct-on-line, 6 × | 550 | 690 | 14.5. Rejected |
| AC-01 compressed-air plant | 75 | Soft starter, 3 × | 275 | 690 | 7.8. Accepted |
| P-01 chilled water pump | 45 | Star-delta, 2 × | 118 | 0, first load on a dead bus | 1.9. Accepted |
| Same checks on one 1250 kVA set instead | — | CH-01 on its drive / AC-01 on its soft starter | 230 / 275 | 587 / 690 | 8.0 / 10.9. The motor fails |
The fifth column is why these figures are deeper than the screen in the example above, and it is worth being exact about what was done to the formula. The published screen divides the starting kVA by itself plus the set’s short-circuit capacity, generator kVA over transient reactance, and assumes nothing else is running.
A set already carrying load has less of that capacity left, so the same screen is applied to what remains: the running kVA is taken off the generator rating before dividing by the reactance. With nothing running the two forms are identical, which is why the pump in row six reads the same either way. With 587 kVA already on the bus, the chiller’s soft start goes from 8.7% on an empty bus to 13.6% on a working one.
The site limit is 10%, not the 15 to 20% the general guidance allows, and that is what makes this sheet decisive. Six air handling units run on variable-speed drives, and a drive trips on undervoltage long before a contactor drops out. A clean room that loses its air change rate does not simply restart: the room has to be re-qualified before the batch in it can continue. Choosing the dip limit is therefore not an electrical decision at all, and the number in that decision came from the quality department rather than from this worksheet.
Read down the rejected rows and the lesson in the panel above this sheet is made concrete. Direct-on-line starting of CH-01 produces 1148 kVA of demand for a few seconds — more than the running load of the entire factory — and no generator plant on the options sheet brings it inside 10%. A soft starter halves it and still fails.
Only the drive, at 1.2 times running current, passes, and the drive was going to be fitted anyway because the chiller serves a variable load. The starting problem was solved by equipment chosen for a different reason, which is the usual way it is solved on a well-planned site and never the way it is solved on a site that sizes the generator first.
The last row is the one that changed the generator order. On the plant options sheet a single 1250 kVA set is the best row on every count the kilowatts can see: the smallest installed capacity that meets N+1, and the only option that loads its running set above 60%. Put the two starts through it and the chiller passes at 8.0% while the motor reaches 10.9%, because by the time AC-01 starts the set is carrying 690 of its 1250 kVA and has only 560 left to hold the voltage up with. A plant chosen on demand alone would have been ordered, installed and commissioned before anybody found that out.
One row deserves reading for what it is not. P-01 shows a dip of 1.9% because it is the first thing energised after a black start, with a dead bus and both generators at no load, and star-delta on a closed-loop circulating pump is comfortable in those conditions. That number is true only for that sequence. Start the same pump at the end of the restoration, with the plant up, and the running load column stops being nought and the figure rises accordingly. Every dip on this sheet is a statement about a moment, not about a motor, which is why the fifth column exists at all.
Two cautions, both of which this screen shares with the one it extends. It ignores cable impedance, which makes real dips at the motor terminals worse than the figures here, and it ignores the voltage regulator’s response, which usually makes the recovery faster than the screen implies. Where a row lands within a couple of points of the limit — as the motor does on the single-set option — the honest next step is the generator maker’s motor-starting curve at the stated dip, not a decision taken on this sheet alone.
Reading the calculator result
If the result shows the generator dip within the allowed limit with margin, the set and starter are suitable. If it is close to the limit, a small change in background load or motor data could tip it over, so a more capable alternator or a softer start is considered. If it exceeds the limit, the options are changing the starter, choosing a larger alternator, or starting the motor before other loads are connected.
Common mistakes
- Sizing the generator on running kW only.
- Using shaft kW as electrical kVA.
- Starting several motors at once after a transfer.
- Oversizing the set instead of changing the starting method.
What to send us
Send motor nameplates, starter types and what else runs during each start. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. The dip formula is a first screen; the generator maker’s motor-starting data govern.
Questions engineers ask
What should be done if the motor starting result is close to the limit?
Treat it as a warning, because a small change in background load or motor data could tip it over. Consider a more capable alternator or a softer start method, and confirm with maker data or a site test before finalising the generator choice. Margin protects against future load growth.
What options exist if the motor starting dip exceeds the limit?
Change the starter to a soft starter or drive, choose a larger or better-excited alternator, or start the motor before other loads are connected so the set is lightly loaded. Each option is rechecked in the calculator before a decision is made. The cheapest workable option is usually a different starter.
Does the calculator replace a site motor starting test?
No. It screens the choice using typical data. A site test starting the largest motor with normal background load, recording voltage, frequency and starting time, confirms the result and provides a baseline for later checks on the actual equipment. Test readings are compared with the calculator inputs to refine them.
Which inputs most affect the motor starting result?
Motor rating and starting method, background load already on the generator, alternator reactance and excitation type, and the allowed voltage dip. Small changes in these can move the result noticeably, so each input is taken from real data where possible. Guessed inputs are clearly marked as assumptions in the record.
How much bigger must a generator be than the motor?
It depends on the starting method and other load. DOL starts often need a generator several times the motor’s kW rating, while soft starters or drives need less. A motor starting study, or the maker sizing software, checks the voltage dip with the running load already connected.
What voltage dip is acceptable?
It depends on the loads. Contactors and electronics often tolerate perhaps 15 to 20% or less. Check the equipment data. Contactors may drop out, lights flicker and drives trip if the dip is too deep, so the limit is set by the most sensitive connected load, and the starting study checks it with all other running loads present.
Does the alternator type matter?
Yes. Oversize or special winding alternators and good excitation support give better starting performance. A permanent magnet generator or auxiliary winding keeps excitation strong during the dip, so the alternator recovers voltage faster and the motor accelerates without stalling. A larger alternator on the same engine is often cheaper than a larger set.
Are VFDs always better?
They give gentle starts but add harmonics and may need a larger alternator or filtering. A drive limits starting current to around rated current, which removes the voltage dip, but its harmonic currents distort the generator voltage. Low-harmonic drives or filters reduce this, and the alternator is checked against the total harmonic load.
Figures are illustrative. For final design use the manufacturer’s starting curves or a transient study.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.