Motor Starting Method Comparison Calculator

How to choose a motor starting method to suit a generator: comparing DOL, star-delta, auto-transformer, soft starter and drive by current, torque, voltage dip and cost.

In short. The starting method sets how much current a motor draws and how much torque it produces while starting. On a generator, lower starting current means a smaller voltage dip and often a much smaller set. The motor must still produce enough torque to accelerate its load. Choose the method that meets the torque need with the lowest starting current.

Who this page is for: For plant engineers, electricians and consultants choosing motor starters for loads on generator supply.

Key facts

  • Direct-on-line draws about 6–7 times running current.
  • Reduced-voltage starting cuts starting torque as well as current; torque falls with the square of the voltage.
  • Fans and centrifugal pumps tolerate reduced-voltage starting.
  • Loaded conveyors and motors may need more torque.
  • A variable-speed drive gives the lowest starting kVA but adds harmonics.
  • The voltage dip depends on the generator’s transient reactance.

Worked example: the calculator’s default 30 kW motor

Starting methodStarting kVA ÷ running kVAGenerator kVA from the calculator
Direct-on-line6.5307 kVA, so a 320 kVA set
Star-delta2.2113 kVA
Autotransformer, 65% tap2.8132 kVA
Soft starter, about 3 × current3.0142 kVA
Variable-speed drive1.2113 kVA

The defaults are a 30 kW motor (37.9 kVA running) starting with 40 kW already running, a 15% allowed dip and a transient reactance of 0.22. Direct-on-line starting needs 246 kVA at start, and holding the dip to 15% takes a 307 kVA set. With star-delta or a variable-speed drive, the running load sets the size at 113 kVA; an autotransformer or soft starter still needs 132–142 kVA. See motor starting studies.

Do not fit star-delta or a soft starter on a load that needs high starting torque without checking it will accelerate. A motor that stalls at reduced voltage draws high current for longer.

Choosing by load

LoadUsual choice on generator
Centrifugal pumps and fansSoft starter or star-delta
MotorsSoft starter or drive; check torque
Loaded conveyors and crushersDrive or autotransformer; check torque
Variable-flow dutyVariable-speed drive; check harmonics

See harmonic screening.

Motor sheet

The starter schedule for the same pharmaceutical formulation block on two 750 kVA sets. The worked example above takes one 30 kW motor through five methods and shows the generator size falling from 320 kVA to 113; this sheet is the finished decision for five real machines, and the column that decided every row is the third one, not the second.

MotorkWLoad typeStarting methodTorque checked?
CH-01, CH-02 chillers160Screw-type machine, variable flowVariable-speed driveYes. Starts unloaded through its own slide valve, and the drive ramps to minimum stable speed before loading
AHU-01 to AHU-06 supply fans22 eachCentrifugal fanVariable-speed driveYes. Fan torque rises with the square of speed, so the start is the easiest on the sheet. The drives are there for air-flow control; the gentle start is a free consequence
P-01, P-02 chilled water pumps45Centrifugal, closed loopStar-deltaYes. A closed loop offers little static head, so one-third of direct-on-line torque accelerates it in about 4 s
AC-01 compressed-air plant75Screw-type machine, unloaded startSoft starter, 3 ×Yes. The inlet valve holds it unloaded for the ramp. A drive was not justified: the machine runs at one speed
PW-01 purified water pump30Positive displacementDirect-on-lineYes, and that is why it is direct-on-line. Constant torque from zero speed; at reduced voltage it would sit and not turn
     
     

The starting method follows the load, not the motor size. Read the sheet by kilowatts and it makes no sense: the largest machine on site has the gentlest start and the smallest has the harshest. Read it by the third column and every row is obvious. A centrifugal fan or pump needs almost no torque at low speed, so reduced voltage costs nothing. A positive-displacement pump needs its full torque from standstill, so reduced voltage simply fails to turn it. Choosing starters from a list of ratings would have put a soft starter on PW-01 and a contactor on the chiller, and both would have been wrong.

Row five is the one worth defending, because it looks like the mistake the panel above this sheet warns against: a 30 kW motor started direct-on-line on a generator. It is there deliberately. Its starting demand is 235 kVA against the chiller’s 1148, it is started once a shift on a bus that is already stable, and the alternative is a machine that draws locked-rotor current for as long as it is told to run. A reduced-voltage start on a constant-torque load does not soften the start; it extends it.

Rows one and two carry a point about where good starting behaviour actually comes from. Neither drive was bought to protect the generator. The chiller has one because it serves a varying cooling load, and the fans have them because clean room air flow is trimmed to maintain room pressure. The starting benefit arrived with equipment that paid for itself on energy. On sites where the process does not justify a drive, the starting case has to be paid for on its own, and that is when a soft starter on one machine competes against a larger set for the whole plant.

The fifth column says “yes” on every row, and a register where that column is empty is not finished. Torque checking is the half of the decision that electrical schedules routinely leave out, because it needs the driven machine’s curve rather than the motor’s. The four-second acceleration against P-01 and the slide-valve note against CH-01 are what makes those rows auditable; “star-delta” on its own records a choice but not a reason, and a year later nobody can tell whether it was checked or assumed.

One consequence of this sheet belongs on the drawing rather than here. Four of the five machines now start at reduced current, which means four of them also take longer to reach speed, and the restart sequence after a transfer has to allow for it. The chiller on its drive is the slowest, and it is deliberately the last of the five to be released: a drive that is still ramping draws current without producing useful cooling, and starting it early only lengthens the time the whole plant is unstable.

The torque check, worked

Starting torque falls with the square of the voltage the motor sees. For a motor whose direct-on-line starting torque is 180% of its full-load torque:

MethodShare of direct-on-line torqueStarting torqueSuits
Direct on line100%about 180%Any load the motor can start
Autotransformer, 65% tapabout 42%about 76%Moderate-torque loads
Star-deltaabout 33%about 60%Fans, centrifugal pumps, unloaded machines
Soft starter limited to 3 times currentabout (3 ÷ 6.5)², 21%about 38%Fans and pumps with low starting torque
Variable-speed driveFull torque at low currentup to rated torque from standstillAlmost any load, including constant torque

A centrifugal fan needs perhaps 10 to 20% torque to break away and rises with speed, so every method starts it. A positive-displacement pump or a loaded conveyor needs full torque from standstill; at 38 or 60% it will not turn, and a stalled motor draws high current for longer, which is worse for the generator than a quick direct start. That is why the purified water pump on the sheet below stays direct on line.

One motor on three generator sizes

The default 30 kW motor started direct on line asks for about 246 kVA. With a transient reactance of 0.22, the screening dip is the starting kVA × 0.22 divided by the generator kVA plus the same product:

GeneratorEstimated dipAgainst a 15% limit
250 kVAabout 18%Fails
320 kVAabout 14.5%Passes, just
500 kVAabout 10%Passes comfortably

A star-delta starter on the same motor cuts the starting kVA to about a third, and the running load then decides the set size. Buying 320 kVA of generator to start one 30 kW motor is almost always a worse decision than buying the right starter.

Starting several motors after a transfer

After a mains failure every motor that was running wants to restart at once. Timers in the AMF panel or the motor control centre bring them back one at a time, largest first while the set has the most headroom, with a few seconds between starts so voltage and frequency recover. Motors on drives can ramp together, but the drives’ own restart settings must allow an automatic restart after a supply break, or they wait for an operator.

Drives and the alternator

A six-pulse drive without filtering draws distorted current, typically with high total harmonic distortion of current, which heats the alternator and distorts the voltage other equipment sees. A DC or AC choke reduces it substantially, and an active front end or active filter reduces it further. Where drives form a large share of the generator load, the alternator is chosen a size up or with permanent magnet excitation, and the drive maker’s harmonic data is checked against the generator’s subtransient reactance before the order is placed.

The first start of each large motor on the generator is recorded with a power-quality recorder: the voltage dip, its duration and the frequency excursion. Those readings confirm the screening estimate and give a baseline for the day another motor is added to the same board.

The recorder file is kept with the motor sheet so that later changes are judged against measured figures.

Common mistakes

  • Large motors started direct-on-line on a generator.
  • Torque not checked.
  • Several motors starting together.
  • Drive harmonics ignored.

What to send us

Send motor sizes, loads and starters. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The worked example uses the calculator’s default inputs.

Questions engineers ask

How much starting torque does a star-delta starter give?

About a third of the direct-on-line starting torque. For a motor whose direct-on-line starting torque is 180% of full-load torque, that is about 60%, enough for fans and centrifugal pumps but not for loads that need full torque from standstill. Starting current also falls to a third.

How large a generator does a 30 kW motor need started direct on line?

It asks for about 246 kVA at start. With a transient reactance of 0.22 the screening dip is about 18% on 250 kVA, 14.5% on 320 kVA and 10% on 500 kVA. A star-delta starter or drive brings the generator back to the size the running load needs.

Which starting method is easiest on a generator?

A variable-speed drive draws the least starting current while giving full torque, followed by soft starters and star-delta, provided they give enough torque for the load. On the default 30 kW motor, star-delta or a drive lets the running load set the generator size at about 113 kVA.

Why not use soft starters on everything?

They cost more, produce heat and give low starting torque, about 38% of full-load torque at three times current for a typical motor. Small motors may start direct on line without trouble, and high-torque loads need a drive or a direct start instead, after a torque check.

Does star-delta work for any motor?

It needs a motor wound for delta at the supply voltage with six terminals brought out, and a load that starts at about one third of direct-on-line torque. Fans and centrifugal pumps suit it; positive-displacement pumps and loaded conveyors usually do not, because they need more torque at standstill.

Do VFDs affect generators?

They add harmonic current that heats the alternator and distorts the voltage. Chokes or an active front end reduce it, and where drives form a large part of the load the alternator is chosen a size up or with permanent magnet excitation after checking the drive harmonic data.

Figures are typical orders of magnitude. Confirm with equipment data.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.