In short. Low power factor means the system carries more current than the real power needs, which raises losses and utility charges. Capacitors supply that reactive power locally. The kVAr needed is the load’s kW multiplied by the difference between the tangents of the present and target power-factor angles. On generator supply, capacitor banks need care: a lightly loaded set with capacitors connected can run at leading power factor and lose voltage control.
Who this page is for: For facility managers and electrical engineers sizing power factor correction, especially on sites with generators.
Key facts
- kVAr = kW × (tan φ1 − tan φ2), where φ = arccos (power factor).
- Correction lowers kVA and current for the same kW.
- Automatic stepped banks follow the load.
- On generator, limit or switch off capacitors at light load.
- Harmonics can make capacitors fail or resonate; use detuned banks.
- Do not correct beyond about unity.
Worked example: the calculator’s defaults
| Item | Working | Result |
|---|---|---|
| Load | 200 kW at 415 V, three-phase | — |
| kVAr needed, 0.75 to 0.95 | 200 × (0.882 − 0.329) | about 111 kVAr |
| kVA before and after | 200 ÷ 0.75; 200 ÷ 0.95 | 267 kVA → 211 kVA (21.1% less) |
| Current per phase | about 371 A → 293 A | 78 A less |
A 120 kVAr automatic bank in steps would suit this load. When the site runs on generator at 60 kW (about 53 kVAr lagging), only about 33 kVAr of steps should stay in, enough to bring the power factor near 0.95. Leaving the full 111 kVAr in would push a lightly loaded set into leading power factor. See harmonic screening.
Do not leave fixed capacitors connected when a generator is lightly loaded. Leading power factor can make the voltage regulator lose control and trip the set.
Fixed or automatic
| Type | Use |
|---|---|
| Fixed at the motor | Steady motor loads |
| Automatic stepped bank | Varying loads at the main board |
| Detuned bank with reactors | Sites with drives, UPS or other harmonic loads |
See harmonic studies.
Correction sheet
| Item | Value | Example: calculator defaults (illustrative) |
|---|---|---|
| Average kW | 200 kW at 415 V | |
| Present and target power factor | 0.75 to 0.95 | |
| kVAr needed | About 111 kVAr; a 120 kVAr bank in steps of 10, 20 and 3 × 30 kVAr | |
| Generator interlock for steps | About 33 kVAr on generator; all steps off below 30% load |
Finding the power factor from the meter
The average power factor over a billing month comes straight from the energy meter: active energy in kWh and reactive energy in kVArh. The apparent energy is the square root of the sum of their squares, and the power factor is the active energy divided by it.
| Reading | Working | Result |
|---|---|---|
| Active energy | From the meter | 42,000 kWh |
| Reactive energy | From the meter | 37,000 kVArh |
| Apparent energy | √(42,000² + 37,000²) | about 55,973 kVAh |
| Average power factor | 42,000 ÷ 55,973 | 0.75 |
The monthly average hides the daily swing, so a bank is chosen from logged demand, not from one figure. A week of readings at the main board shows the lowest and highest kW and how the power factor moves with shifts, and those set the step sizes.
Choosing step sizes for an automatic bank
For the default site, correcting from 0.75 to 0.95 needs 0.553 kVAr for every kW, because tan(arccos 0.75) is 0.882 and tan(arccos 0.95) is 0.329. A 120 kVAr bank built as 10 + 20 + 3 × 30 kVAr can switch in any multiple of 10 kVAr, so the controller follows the load closely:
| Load at 0.75 power factor | kVAr for 0.95 | Steps switched in |
|---|---|---|
| 60 kW (on generator) | about 33 kVAr | 30 kVAr |
| 100 kW | about 55 kVAr | 50 or 60 kVAr |
| 150 kW | about 83 kVAr | 80 kVAr |
| 200 kW | about 111 kVAr | 110 kVAr |
A small first step matters most at light load. A bank whose smallest step is 50 kVAr cannot correct a 60 kW load without over-correcting it, and on a generator that over-correction is exactly what causes trouble.
Resonance: why detuned banks are used
A capacitor bank and the supply inductance form a resonant circuit. A quick screening figure for the resonant harmonic order is h ≈ √(Ssc ÷ Q), where Ssc is the short-circuit capacity in kVA and Q the capacitor kVAr in service.
| Source | Ssc | Bank in service | Resonant order |
|---|---|---|---|
| 1000 kVA transformer, 5% impedance | about 20,000 kVA | 120 kVAr | about 12.9 |
| 250 kVA generator, X″d 0.12 | about 2083 kVA | 111 kVAr | about 4.3 |
On the transformer the resonance sits well away from the 5th and 7th harmonics that drives and UPS rectifiers produce. On the generator the same bank resonates close to the 5th, so harmonic current is amplified, voltage distorts and capacitors overheat. A detuned bank with 7% reactors is tuned to about 189 Hz, below the 5th harmonic at 250 Hz, which keeps it out of resonance on either source. See harmonic risk screening.
Interlocking the bank with the generator
With the default site on generator at 60 kW and 0.75 power factor, the load draws about 53 kVAr. If the full 111 kVAr stays connected, the net reactive power is about 58 kVAr leading, and the set runs at about 0.72 leading. The alternator’s voltage regulator loses control at leading power factor, so voltage rises and the set may trip.
| Supply condition | Bank setting |
|---|---|
| On mains | Automatic, all steps available |
| On generator, normal load | Steps limited to the kVAr agreed for generator running, about 33 kVAr here |
| On generator, below about 30% load | All steps off |
| During transfer | Bank disconnected and allowed to discharge before reconnection |
The changeover or AMF panel supplies a “generator running” signal to the bank controller, and the logic is proved during commissioning by running the set at light load and watching the power factor.
Keeping a bank healthy
Capacitors lose capacitance as they age, and the first sign is falling current. A 30 kVAr step rated at 440 V gives about 26.7 kVAr on a 415 V supply, because output varies with the square of voltage, and draws about 37 A per phase. A step drawing noticeably less has lost capacitance; one drawing unequal currents across phases has a failed element. A yearly check of current per step, contactor condition, discharge resistors and panel temperature keeps the bank working.
Where to install the correction
| Location | Advantages | Limitations |
|---|---|---|
| At large motor terminals | Reduces current in the motor feeder; switched with the motor | Fixed size; must stay below the motor magnetising kVAr to avoid self-excitation |
| At a motor control centre | Covers a group of motors; one panel | Feeder upstream still carries the reactive current |
| At the main LV board | One automatic bank follows the whole site; easiest to interlock with the generator | Internal cables are not relieved |
Most sites with a generator use one automatic bank at the main board, because that is where the changeover signal is available and where the bank can be limited or switched off when the set is running.
Rating a detuned step
A series reactor raises the voltage across its capacitor. With a 7% reactor on a 415 V system, the capacitor sees about 415 ÷ 0.93, or 446 V, so detuned banks use capacitors rated at 480 or 525 V. The step then delivers less than its nameplate kVAr:
| Capacitor nameplate | Working | Effective output at 415 V |
|---|---|---|
| 50 kVAr, 480 V, with 7% reactor | 50 × (415 ÷ 480)² ÷ 0.93 | about 40 kVAr |
| 50 kVAr, 525 V, with 7% reactor | 50 × (415 ÷ 525)² ÷ 0.93 | about 34 kVAr |
Quotations are therefore compared on effective kVAr at the system voltage, not on capacitor nameplates. A detuned bank meant to supply 120 kVAr may need capacitors with a combined nameplate well above that figure.
Commissioning a new bank
- Measure harmonic distortion at the main board before choosing plain or detuned capacitors.
- Check the controller’s current transformer is on the incoming side of the bank and on the phase the controller expects.
- Prove each step switches, draws balanced current near its rated value and discharges before reclosing.
- Run the site on generator at light and normal load and confirm the steps are limited and the power factor stays lagging.
- Record the target power factor, step sizes and generator limit on the panel door.
Power factor of common loads
| Load | Typical power factor | Note |
|---|---|---|
| Induction motor at full load | about 0.85 | Falls steeply as load falls |
| Induction motor at half load | about 0.75 | Common on oversized pumps and fans |
| Induction motor running light | 0.2 to 0.4 | Mostly magnetising current |
| LED lighting with good drivers | 0.9 or better | Cheap drivers can be much lower |
| Variable-speed drive input | about 0.95 displacement | Harmonics lower the true power factor |
| Arc welding sets | 0.4 to 0.6 | Varies rapidly with the arc |
The figures are typical; the meter tells the real story. A factory whose motors are oversized for their duty runs at a poorer power factor than its nameplates suggest, because a motor at half load draws almost the same magnetising current as at full load.
Fixing the cause before adding kVAr
A capacitor bank treats the symptom. Where a 30 kW motor drives a pump needing 12 kW, a correctly sized motor or a variable-speed drive raises the power factor and saves energy as well. Correction is still worth installing, but the bank is sized after the obvious mismatches are fixed, otherwise it is bought for reactive power that a better-matched motor would never have drawn.
What to record after correction
Once the bank is in service, the monthly meter readings show whether it is doing its job. Record kWh, kVArh and the resulting average power factor each month alongside the steps in service, and investigate any month where the power factor slips back. A falling figure with the same load usually means a failed step, a blown fuse or a contactor that no longer closes, all of which are found quickly with a clamp meter at the bank.
Common mistakes
- Full correction left in on generator.
- Plain capacitors with harmonic loads.
- Over-correction to leading power factor.
- Bank sized on peak, not average.
What to send us
Send your electricity bills or load readings. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The worked example uses the calculator’s defaults.
Questions engineers ask
How do I find my average power factor from the meter?
Take the active energy in kWh and the reactive energy in kVArh for the month. The apparent energy is the square root of the sum of their squares, and the power factor is kWh divided by that figure. For 42000 kWh and 37000 kVArh it is about 0.75.
Why should a capacitor bank have a small first step?
So it can follow light loads without over-correcting. Correcting a 60 kW load from 0.75 to 0.95 needs about 33 kVAr; a bank whose smallest step is 50 kVAr cannot do that and pushes the supply leading, which on a generator can make the voltage regulator lose control.
What target power factor should I use?
Commonly 0.95 to 0.99, depending on the tariff and the system. Correcting from 0.75 to 0.95 needs about 0.55 kVAr for every kW of load. Going beyond unity into a leading power factor raises voltage, wastes capacitor capacity and causes trouble on generator supply, so the bank is set to stop short of unity.
Can I use capacitors on a generator supply?
With care. The bank controller needs a generator running signal so it limits the steps to what the generator load needs, about 33 kVAr for a 60 kW load at 0.75, and switches all steps off at light load, so the set never runs at a leading power factor.
Why are reactors added to capacitors?
To detune the bank so it cannot resonate with system harmonics. A bank with 7% reactors is tuned to about 189 Hz, below the 5th harmonic at 250 Hz. On a generator, where the short circuit capacity is low, an undetuned bank can resonate close to the 5th.
Does power-factor correction reduce the generator size?
It reduces the kVA and current the alternator carries, but not the kW, so the engine limit is unchanged. Because generator sets are rated at 0.8 power factor, correcting above that rarely allows a smaller set, and capacitors on a generator need interlocking with the changeover.
Figures are illustrative. Use measured data and a harmonic check for design.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.