How to decide how many generators a site needs and in what sizes: load profile, redundancy, step handling, part-load efficiency, maintenance and growth, with a worked comparison of options.

In short. The number of generators needed (N) is the maximum demand divided by what one set can carry at its planned loading, rounded up. Redundancy adds sets on top: one for N+1, two for N+2, or a full second plant for 2N. More, smaller sets give flexibility and better light-load running. Fewer, larger sets cost less and are simpler. Decide from the load profile and the redundancy the business needs.

Who this page is for: For consultants and owners planning a multi-generator installation.

Key facts

  • One set’s capacity = kVA × rated power factor × planned loading.
  • N = maximum demand ÷ one set’s capacity, rounded up.
  • N+1 adds one spare; 2N doubles the plant.
  • Paralleled sets need matched governors, voltage regulators and a synchronising panel.
  • Check the largest load step against the sets that will be running.
  • Check minimum load, to avoid long light-load running.

Worked example: the calculator’s defaults, and two alternatives

OptionNN+1 installedInstalled kVALoading with N running
500 kVA sets (400 kW each)900 ÷ 320 = 2.8, so 342000 kVA75%
750 kVA sets (600 kW each)900 ÷ 480 = 1.9, so 232250 kVA75%
320 kVA sets (256 kW each)900 ÷ 205 = 4.4, so 561920 kVA70%

The default case is 900 kW at 80% planned loading. All three options meet N+1. Four 500 kVA sets give a good balance of spare capacity, installed size and light-load flexibility. See running combinations and multi-generator plants.

Do not count the spare set in normal capacity. If all sets are needed to carry the load, there is no redundancy.

Trade-offs

ItemMore, smaller setsFewer, larger sets
Light-load runningBetterWorse
Spare set sizeSmallerLarger
Space, cost and controlsMoreLess
Largest load stepCheck carefullyEasier

See N+1 and 2N.

Plant options sheet

Four plant options for the same pharmaceutical formulation block, whose demand sheet gives 687 kW. The worked example above compares three set sizes for a 900 kW load and finds four 500 kVA sets the best balance; this site comes out differently, and the row that wins on this sheet is not the row that was ordered.

Set sizeNInstalled with spareLoading
500 kVA, 400 kW each687 ÷ 320 = 2.15, so 34 sets, 2000 kVA57% with three running
750 kVA, 600 kW each687 ÷ 480 = 1.43, so 23 sets, 2250 kVA57% with two running. Chosen
1000 kVA, 800 kW each687 ÷ 640 = 1.07, so 23 sets, 3000 kVA43% with two running
1250 kVA, 1000 kW each687 ÷ 800 = 0.86, so 12 sets, 2500 kVA69% with one running. Best on this sheet, rejected by the starting check
    
    

Each N in the second column is the demand divided by what one set can actually carry, which is its kVA times the 0.8 rated power factor times the 80% planned loading — 320 kW from a 500 kVA set, 480 from a 750, 640 from a 1000, 800 from a 1250. The division is the easy part. What the sheet is really for is the rounding, because every one of these four answers is a fraction and the plant has to be whole sets.

Row three is the trap, and it costs 750 kVA. At 1.07, the 1000 kVA option misses carrying the load on one set by 47 kW — seven percent — and that fraction forces a second duty set, a third for the spare, and the largest installed capacity on the sheet at the lowest loading. Three 1000 kVA sets is 3000 kVA installed to serve 687 kW, and two of them will spend their lives at 43%. A row that is worse than the row above it on every column exists only because 1.07 rounds to 2.

Row four would be the answer if this sheet were the only one. One 1250 kVA set carries the whole plant at 69%, better loaded than anything else here, with 2500 kVA installed for genuine N+1 and only two machines to maintain and synchronise.

It is also the row that was rejected, and not on this page: with the plant up, the compressed-air plant’s soft start on a single 1250 kVA set screens at 10.9% against a site limit of 10%, because by then the set is carrying 690 of its 1250 kVA and has little left to hold the voltage with. The sizing sheet and the starting sheet disagreed, and the starting sheet won.

That leaves rows one and two, which share a loading figure and differ in everything else. Three 500 kVA sets and two 750s both run at 57%, but the 500 option installs four machines against three, needs four sets of controls, breakers and maintenance contracts, and puts three sets on the bus in normal running where the 750 option puts two. Its one advantage is granularity: at the June low load of about 313 kW a single 500 kVA set sits at 78% where a 750 sits at 52%. On a site whose low-load periods are a few weeks a year, that did not pay for the fourth machine.

Fifty-seven percent is not a comfortable number and it is worth saying why it was accepted rather than designed away. The 80% planned loading in the arithmetic is a ceiling, not a target, and the gap between 57% and 80% is the honest cost of buying plant in whole sets for a 687 kW load. It is also not the whole year: with one 750 running alone during low-load periods the site reaches 52%, and the dispatch rule that follows from the fuel record is to run one set whenever the load allows it. A plant that is lightly loaded by arithmetic can still be well loaded by operation.

One line belongs under any sheet like this. The spare is not capacity. With three 750 kVA sets installed, the site has 2250 kVA of plant and 1200 kW of usable generation, because the third set exists to be unavailable. The moment somebody dispatches all three to carry a larger load, the installation stops being N+1 and becomes an N plant with three machines, and the redundancy that justified the third set has quietly been spent.

Load-dependent start and stop

A multi-set plant saves fuel and wear by running only as many sets as the load needs. The controller starts another set when load rises above a threshold, and stops one when load falls low enough that the remaining sets can carry it with margin. In an illustrative plant of four 500 kVA sets, each giving 400 kW, the controller might start a further set when running sets exceed about 80% of their combined capacity, and stop one when the remaining sets would be below about 60% after it stops. Time delays prevent sets from starting and stopping repeatedly when the load hovers near a threshold.

Rotating duty to balance running hours

If the same set always starts first, it wears out long before the others. Rotation logic changes the lead set on a schedule, such as weekly, or by accumulated hours, so all sets age together and maintenance can be planned as a group. Rotation also proves regularly that every set starts and loads, rather than leaving one idle until an emergency.

Fault level grows with every set

Each set added to a busbar adds to the fault current the switchgear must withstand and interrupt. A plant that starts with two sets and later grows to five may exceed the rating of its original breakers and busbars. The switchgear is therefore specified for the final number of sets, or the expansion plan includes a switchgear review before new sets are connected.

Avoiding light-load running

Several small sets make it easier to keep each one well loaded at low demand. One large set carrying a small night load runs lightly loaded for hours, which leads to wet stacking and, on CPCB IV+ sets, more frequent aftertreatment regenerations. The number and size of sets is chosen with the lowest regular load in mind, not only the peak.

Planning for expansion

  • Leave space in the room or yard for the future sets, with ventilation and exhaust routes planned.
  • Provide spare panels or breaker positions on the busbar.
  • Choose a control system that can add sets without replacing the master controller.
  • Size fuel storage and transfer for the final plant.
  • Keep identical set models where possible to simplify load sharing and spares.

Setting a redundancy policy

Decide in writing how many sets may be out of service before load is restricted. A common policy is N+1, where one set can be under maintenance or fail without reducing supply. Sites with critical loads may choose N+2 so that one set can be in maintenance while another fails. The policy then sets the number of sets, the maintenance calendar and the load-shedding scheme together.

Common mistakes

  • Spare counted as capacity.
  • Minimum load ignored.
  • Step loads not checked on running sets.
  • Mixed sizes without a sharing plan.

What to send us

Send your load profile and redundancy need. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The first row uses the calculator’s defaults; the others are illustrative.

Questions engineers ask

How does load-dependent start and stop work in a multi-generator plant?

The controller starts another set when running sets exceed a threshold, such as about 80% of combined capacity, and stops one when the remaining sets would stay below about 60%. Time delays stop sets cycling when load hovers near a threshold, saving fuel and wear.

Why should duty be rotated between generators?

So all sets accumulate similar hours and age together, allowing maintenance to be planned as a group. Rotation by schedule or by running hours also proves regularly that every set starts and takes load, instead of leaving one idle and untested until an emergency reveals a fault.

Does adding generators affect switchgear ratings?

Yes. Each set on a busbar adds fault current that breakers and busbars must withstand and interrupt. A plant growing from two to five sets may exceed its original ratings, so switchgear is specified for the final plant or reviewed before new sets are connected.

What redundancy policy suits a multi-generator plant?

N+1 lets one set be under maintenance or fail without reducing supply, and suits most plants. Sites with critical loads may choose N+2, so one set can be in maintenance while another fails. The policy then fixes the number of sets, the maintenance calendar and the shedding scheme.

How do I choose between three large and four small generators?

Compare total installed capacity, capacity with one unit out, part-load efficiency, space, cost and maintenance complexity for your load profile. More, smaller sets give better redundancy and efficiency at light load, while fewer, larger sets cost less to install and maintain, so the load profile decides.

Does N+1 mean one extra generator?

It means capacity for the load with one unit out. With uneven sizes, that is not necessarily one extra unit of the same size. With mixed sizes, the check removes the largest unit and confirms the remaining sets still carry the load. For example, 500, 500 and 250 kVA sets carry 750 kVA with one 500 kVA set out.

Can I add generators later?

Yes if the bus, controls, fuel and space were designed for it. Spare breaker ways, space on the plinth, controller capacity, fuel system size, exhaust routes and fault level ratings are all planned at the start, because adding them later usually costs far more and may need a long outage.

Is paralleling necessary?

For shared load and redundancy on one bus, yes. Separate units on separate loads do not need it but give less flexibility. Paralleling needs synchronising and load-sharing controls, protection for the parallel state and switchgear rated for the combined fault level, so the extra cost is weighed against the flexibility it brings.

Figures are illustrative. Final selection needs a load study and manufacturer data.