In short. A battery system’s power rating is how much it can deliver at once; its energy rating is how long it can keep going. Size the power from the duty: the peak to shave, the step to absorb, the critical load to carry while a generator starts, or the island load plus the largest start. Then check the inverter: it is rated in kVA, and its current limit, often only about 1.1 to 1.5 times rated for a short time, decides whether it can start motors or clear faults.
Who this page is for: For consultants and plant engineers sizing a BESS for peak shaving, generator support, bridging or islanding.
Key facts
- Power (kW) is the rate; energy (kWh) is the total.
- Inverters are rated in kVA: a 500 kVA inverter at power factor 0.9 delivers 450 kW.
- Inverter overload capability is limited, often about 1.1 to 1.5 times rated for seconds.
- A direct-on-line motor start needs 5 to 7 times running current; check it against the inverter limit.
- Inverter fault current is low, which affects protection in island mode.
- Add margin for auxiliaries, losses and ageing.
Power by duty
| Duty | What sets the power rating |
|---|---|
| Peak shaving | Peak demand minus the target cap |
| Bridging to a generator | The critical load carried until the set takes over |
| Generator support | The part of a step or peak above the generator’s comfortable limit |
| Islanding or black start | Island load plus the largest start |
| Spinning reserve | The reserve required |
Worked examples (illustrative)
| Duty | Working | Power rating |
|---|---|---|
| Peak shaving: peak 1200 kW, cap 900 kW | 300 kW plus margin for losses and auxiliaries | About 350 kW |
| Bridging a 400 kW critical load for a 30 s generator start | Carry the whole load | 400 kW plus margin; energy is small |
| Generator support: a 1000 kVA set should take no more than a 400 kW step; the site has a 700 kW step | 700 − 400 | 300 kW for the first seconds |
| Island start of a 75 kW pump (about 550 kVA direct-on-line) | 500 kVA inverter at 1.5 times = about 750 kVA briefly; at 1.1 times only 550 kVA | Fits only if the inverter’s short-time limit is near 1.5 times and little else is running |
| Island start of a 110 kW pump (about 800 kVA direct-on-line) | Above 750 kVA | Needs a soft starter or drive, or a larger inverter |
The last two rows show why motor starting, not average power, often decides the inverter size in island mode. See motor starting.
Do not size a BESS on kW alone. Check the inverter’s kVA, its short-time current limit for motor starts, and how protection will detect faults when the inverter is the only source.
Apparent power and reactive support
Loads with a low power factor use up inverter kVA without delivering kW. If the BESS must also support voltage or supply kVAr, size the inverter for the combined kVA and check its reactive capability.
Protection in island mode
Because inverter fault current is limited, overcurrent devices may not trip quickly on an island fed only by the battery. Branch protection, earth-fault detection and the inverter’s own fault response must be checked together. See critical-power protection.
BESS power sizing sheet
| Item | Value | Example: calculator defaults (illustrative) |
|---|---|---|
| Duty and target | Critical-load backup: 200 kW peak, 140 kW average for 2 hours | |
| Required kW and power factor | 240 kW with a 20% margin; load power factor 0.9 | |
| Inverter kVA | About 267 kVA, so a 300 kVA inverter | |
| Largest motor start (kVA) against inverter limit | 75 kW pump on a soft starter, about 285 kVA, within 330 kVA at 1.1 times | |
| Energy needed (kWh); see BESS energy | About 423 kWh nameplate |
Reading the calculator’s default answer
The calculator opens with a site whose critical load peaks at 200 kW and averages 140 kW, backed for two hours by a lithium iron phosphate (LFP) battery. Each line of its answer is a single step:
| Line | Working | Result |
|---|---|---|
| Inverter (PCS) power | 200 kW × (1 + 20% margin) | 240 kW |
| Nameplate energy | 140 kW × 2 h ÷ (0.90 × 0.92 × 0.80) | about 423 kWh |
| Full inverter power, new battery | 423 × 0.90 × 0.92 ÷ 240 | about 1.46 h |
| Full inverter power, end of life | 1.46 × 0.80 | about 1.17 h |
| Average load, new battery | 423 × 0.90 × 0.92 ÷ 140 | about 2.5 h |
The power line answers how much the system can deliver at once; the energy lines answer for how long. A system sized only on energy can run out of power on the first motor start, and one sized only on power can run flat long before the generator is back.
From kW to inverter kVA
Inverters are rated in kVA, and the load’s power factor decides how much of that rating is left for real power. The same 240 kW needs a different inverter as the power factor falls:
| Load power factor | Working | Inverter kVA needed |
|---|---|---|
| 1.0 | 240 ÷ 1.0 | 240 kVA |
| 0.9 | 240 ÷ 0.9 | about 267 kVA, so a 300 kVA unit |
| 0.85 | 240 ÷ 0.85 | about 282 kVA, so a 300 kVA unit with less margin |
Where the battery system must also hold voltage or supply reactive power to motors in island mode, that reactive duty is added before the kVA rating is fixed.
The motor-start check, worked
A 75 kW pump at 93% efficiency and 0.85 power factor draws about 95 kVA running. Started direct on line at about six times running current it asks for about 570 kVA; with a soft starter limiting current to about three times, about 285 kVA.
| Start method | Starting kVA | 300 kVA inverter at 1.1 times (330 kVA) | At 1.5 times (450 kVA) |
|---|---|---|---|
| Direct on line | about 570 kVA | No | No |
| Soft starter, about 3 times | about 285 kVA | Yes, if little else is running | Yes |
| Variable-speed drive | close to running kVA | Yes | Yes |
In island mode the starter on the largest motor often decides the inverter size more than any other figure, which is why the sizing sheet asks for it explicitly.
The battery behind the inverter: C-rate
A battery can deliver power only up to its own rate limit, expressed as the C-rate: power divided by nameplate energy. The default system runs at 240 kW from about 423 kWh, or about 0.57C, comfortably inside the 0.5 to 1C that many stationary LFP systems are built for. A peak-shaving system that must deliver 300 kW for only 30 minutes needs just 150 kWh of usable energy, but at 300 kW that is a 2C demand. If the chosen battery is rated at 1C, it must be at least 300 kWh nameplate to give the power, so here power, not energy, sets the battery size.
Temperature, ageing and the margin
- Inverters reduce their output above their rated ambient temperature, so a container in a Hyderabad summer needs cooling sized for the inverter and battery losses together.
- Batteries give less power when cold, when nearly empty and as they age, so the power margin covers the end of life, not only the first year.
- Auxiliaries such as cooling, controls and fire systems are supplied from the same battery and are added to the load.
The 20% power margin in the calculator is a starting point. The maker’s derating curves for the actual inverter and battery replace it in the final design.
Bridging duty: large power, little energy
A battery that carries a 400 kW critical load for the minute it takes a generator to start and take over needs very little energy: 400 kW for 60 seconds is about 6.7 kWh. It still needs 400 kW of power. A battery rated at 1C would have to be about 400 kWh to deliver it, sixty times the energy the duty uses. For this duty, high-power battery designs rated for several C, or a UPS battery string sized for minutes rather than hours, are the usual answer, and the inverter is sized for the full critical load plus its starting duty.
| Duty | What sets the battery size | Typical result |
|---|---|---|
| Bridging a generator start | Power | Small energy, high C-rate |
| Peak shaving for short peaks | Power, then energy | Moderate energy, around 1 to 2C |
| Backup for several hours | Energy | Large energy, low C-rate |
| Island supply with motor starts | Inverter short-time current | Inverter sized above the running load |
Data that makes the sizing reliable
- A load log at one-minute or fifteen-minute intervals over at least a week, showing peaks, their duration and how often they occur.
- The largest motors on the supplied board, with their starters and whether they can start together.
- The generator rating and its accepted load step, if the battery supports a generator.
- The ambient temperature range where the battery and inverter will stand.
With these, the power rating is fixed by the duty that demands most, and the energy rating follows; without them, the system is sized on a guess and either overspends or runs short.
Supporting a generator rather than replacing it
Where the battery works alongside a generator, its power rating is set by what the generator cannot do comfortably. If a 1000 kVA set should take no more than a 400 kW block load and the site steps by 700 kW, the battery covers the first 300 kW of the step for the seconds the engine needs to respond.
The energy for that is tiny; the power, the speed of response and the coordination between the battery controller and the generator governor are what matter. The two controls are commissioned together and tested with real load steps, recording frequency and voltage on the generator so the agreed limits are proved rather than assumed.
The same commissioning record is kept with the system documents and repeated after any change to the generator, the battery or the site load.
Common mistakes
- Confusing kW and kWh.
- Sizing on kW and ignoring the inverter’s kVA.
- Expecting an inverter to start large motors direct-on-line.
- Ignoring protection with a low-fault-current source.
What to send us
Send the duty, a load profile and the largest motors. WhatsApp 98852 01608 or use the enquiry form. See also the hybrid screening tool.
Evidence note. Inverter limits vary by product; the BESS maker’s data govern.
Questions engineers ask
How big an inverter does a 200 kW critical load need?
With a 20% margin the load needs 240 kW. At a load power factor of 0.9 that is about 267 kVA, so a 300 kVA inverter, and the largest motor start is then checked against its short-time current limit before the size is fixed, because inverters have far less overload capacity than generators.
What C-rate should a stationary battery run at?
Many stationary lithium iron phosphate systems are built for about 0.5 to 1C. The default case runs at about 0.57C, 240 kW from 423 kWh. A short, high-power duty such as 300 kW for 30 minutes can need a larger battery for power than its energy alone would suggest.
What is the difference between MW and MWh?
MW is power, how fast energy is delivered; MWh is energy, the total delivered over time. A 240 kW inverter on a 423 kWh battery can deliver its full power for about 1.46 hours when new, and the calculator reports both figures because each limits a different duty.
Can a BESS start a large motor?
Only within the inverter short-time current limit, often about 1.1 to 1.5 times rated for seconds. A 75 kW pump started direct on line asks for about 570 kVA, beyond a 300 kVA inverter, while a soft starter brings it down to about 285 kVA, which fits.
Does the BESS need reactive power capability?
For loads with a low power factor or where it must hold voltage in island mode, yes. Its kVA rating must cover both real and reactive power, so 240 kW at a power factor of 0.85 needs about 282 kVA of inverter before any reactive support duty is added.
Why does temperature matter?
Inverters reduce their output above their rated ambient temperature, and batteries give less power when hot, cold or ageing. A container in a Hyderabad summer needs cooling for the inverter and battery losses together, and the power margin is checked against the derating curves of the actual equipment.
Figures are illustrative. Final sizing needs a detailed study and manufacturer data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.