In short. Any change that adds a source, changes impedance, closes a tie or adds large motors can change fault levels. A short-circuit study checks that switchgear, busbars and cables can survive and break the highest fault, and that protection still operates at the lowest. This screening tool and the triggers below tell you when a quick check is enough and when a full study is needed, before new equipment is connected, not after.
Who this page is for: For plant engineers, consultants and owners adding generators, transformers, motors, storage or ties to an existing system.
Key facts
- Transformer contribution ≈ rated current ÷ per-unit impedance.
- Generator initial contribution ≈ rated current ÷ X″d, decaying over time.
- Running motors add roughly their locked-rotor current for the first cycles.
- Maximum fault level sets equipment ratings; minimum sets protection sensitivity.
- A new parallel source can push an existing board past its rating.
- Low fault levels on generator or inverter supply can delay or prevent protection tripping.
When a study is needed
| Trigger | Why |
|---|---|
| New or extra generator or transformer | Adds fault contribution |
| Paralleling sources or closing a tie | Fault levels add |
| Change in utility supply | Source impedance changes |
| Large motors added | Motors contribute to faults |
| BESS, UPS or solar inverters added | Changed contribution and protection behaviour |
| Switchgear replaced or added | Ratings must be verified |
| Island or microgrid operation | Low fault levels |
| No current study exists | Unknown margin |
Worked example: adding a generator in parallel (illustrative)
A main board rated 50 kA is fed by a 1600 kVA, 6% transformer. The owner plans a 1000 kVA generator that will parallel with the transformer for no-break testing.
| Source | Working | Contribution |
|---|---|---|
| Transformer | 2226 A ÷ 0.06 | About 37.1 kA |
| Generator (X″d about 0.12) | 1391 A ÷ 0.12 | About 11.6 kA |
| Running motors (estimate) | From the motor list | About 3 kA |
| Total in parallel | Sum | About 51.7 kA: above the 50 kA board rating |
| Generator alone, sustained with permanent-magnet (PMG) excitation | About 3 × 1391 A | About 4.2 kA: check feeders still trip |
The screening shows both problems a full study must solve: the board is over its rating when sources are paralleled, and the fault current on generator alone is low enough to slow feeder protection. A full study including source and cable impedance will refine the figures; the fixes include preventing or time-limiting the parallel state, or uprated switchgear. See generator contribution and maximum and minimum fault current.
Do not connect a new source to an existing board until its rating has been checked against the combined fault level. A breaker or busbar that is asked to break or withstand more than its rating can fail violently.
Data to collect
- Utility fault level, maximum and minimum. See utility fault level.
- Transformer ratings, impedance and vector group.
- Generator ratings and reactances.
- Motor sizes and types.
- Cable sizes and lengths.
- Switchgear ratings and protection settings.
- A single-line diagram showing every operating configuration.
What the study produces
- Maximum fault currents for equipment ratings and arc-flash work.
- Minimum fault currents for protection settings.
- Peak currents for making and withstand ratings.
- A list of equipment over its rating and the fixes.
See short-circuit study architecture.
Fault-level screening sheet
| Source | Rated current (A) | Impedance or X″d | Contribution (kA) |
|---|---|---|---|
| Utility through transformer | |||
| Generator(s) | |||
| Motors | |||
| Total against board rating |
Peak current and the making rating
A breaker has two short-circuit duties. It must break the symmetrical fault current, which is what the 50 kA rating of the board describes, and it must close onto and withstand the first peak of an asymmetrical fault, which can be much higher. The peak depends on the ratio of reactance to resistance, X/R, at the fault point: the higher the ratio, the more asymmetrical the first cycle. A common approximation for the peak factor is κ = 1.02 + 0.98 e−3R/X, and the peak current is κ × √2 × the symmetrical current.
| Step | Working | Result |
|---|---|---|
| Symmetrical fault current with sources in parallel | From the worked example | about 51.7 kA |
| Peak factor at an assumed X/R of 6 | 1.02 + 0.98 × e−0.5 | about 1.61 |
| Peak current | 1.61 × 1.414 × 51.7 | about 118 kA |
| Making capacity of a typical 50 kA board | Ratio of peak to symmetrical rating, often 2.1 at this level | about 105 kA |
The peak check fails by a wider margin than the symmetrical check. Close to large transformers and generators X/R is often high, so the peak duty must be checked against the making and peak withstand ratings stated by the switchgear maker, not only the breaking rating.
How each source decays
Fault contributions are not constant. The utility through the transformer gives a steady contribution for as long as the fault lasts. A generator gives a high subtransient current in the first cycles, falling to a transient value over a few tenths of a second and then to a sustained value that depends on its excitation: with a permanent-magnet or auxiliary-winding excitation system it holds about three times rated current for a short time, while a shunt-excited machine may collapse further.
Running induction motors contribute strongly for the first cycles and then die away. Inverter-based sources such as batteries and solar contribute only about one to one and a half times their rating, controlled by the inverter.
That is why the maximum fault level, used for equipment ratings, is calculated with all sources in their strongest state at the first cycles, and the minimum fault level, used for protection, is calculated with the weakest credible source arrangement and the decayed values.
Minimum fault level and protection on generator supply
In the worked example the generator alone gives about 4.2 kA sustained. A 630 A feeder breaker with a magnetic trip set at ten times its rating needs 6.3 kA to trip instantaneously, so on generator supply a fault on that feeder would rely on the slower thermal or long-time element, and at the far end of a long cable the current would be lower still.
The study lists every protective device whose instantaneous or short-time element will not operate on generator-only supply, and the fixes include lower settings where coordination allows, electronic trip units with an adjustable short-time setting, or a separate protection group selected when the site runs on the generator.
Fixes when a board is over its rating
| Fix | How it helps | Points to check |
|---|---|---|
| Prevent parallel operation by interlock | Sources never feed the board together | Loses no-break transfer and testing |
| Time-limited parallel with a fast separation | Parallel state lasts only seconds | Accepted only where the switchgear and the rules allow it |
| Split the busbar with a bus section | Each half sees fewer sources | Load distribution between halves |
| Fault-limiting reactor | Adds impedance in the source path | Voltage drop and losses in normal running |
| Uprated switchgear | Ratings meet the new fault level | Cost, outage to replace, space |
Cable impedance and the far end
The screening sums contributions at the board, which is the worst case for that board. At the end of a long feeder the cable impedance reduces the fault current substantially, which helps the downstream equipment ratings but works against protection. A 120 m run of 70 mm² copper on a 415 V board with a 40 kA fault level may deliver only a few kiloamperes at its far end. Both effects are calculated in the full study, which is why it needs cable sizes and lengths as well as source data.
Arc flash uses the same results
The fault currents from the study also feed the arc-flash assessment, which estimates the energy a worker could be exposed to at each board. The arc-flash energy depends on the arcing current and on how quickly the protection clears it, so a low fault level on generator supply can give a higher arc-flash energy than the grid case, because clearing is slower. Labels and working procedures are based on the worst case across all operating configurations.
Operating configurations to study
| Configuration | Used for |
|---|---|
| Utility and all generators in parallel, all motors running | Maximum fault level, equipment ratings, peak duty |
| Utility alone, normal running | Normal protection settings, arc-flash on grid |
| One generator alone, minimum motors running | Minimum fault level, protection sensitivity on generator supply |
| Bus section open and closed | Ratings of each half and the effect of the tie |
| Inverter-based sources alone, where an island is possible | Whether protection works at all on the lowest contribution |
Each configuration that the site can actually operate in appears in the study, and the configurations that are not allowed are prevented by interlocks rather than by procedure alone.
Estimating motor contribution
For screening, running induction motors are taken to contribute about their locked-rotor current, typically five to seven times their full-load current, for the first cycles. In the example, about 3 kA corresponds to roughly 500 A of running motor load on the board at 415 V, a little under 300 kW of motors. The full study models large motors individually and groups small ones, and it applies the decay so that the motor contribution counts for the peak and making duty but not for the breaking duty of slower devices.
After the study
The study ends with actions, not only figures: a list of equipment over its rating with the chosen fix, protection settings issued for each configuration, interlocks for configurations that must not occur, updated arc-flash labels, and a revised single-line diagram. Settings are then applied and proved by secondary injection before the new source is connected.
Common mistakes
- Checking only the source being added.
- Forgetting motor contribution.
- Ignoring the minimum fault level.
- Relying on an old study after changes.
What to send us
Send the single-line diagram, transformer and generator data, motor list and switchgear ratings. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. The screening adds contributions directly and ignores impedances between them; a full study refines the figures.
Questions engineers ask
What is the difference between breaking and making capacity?
Breaking capacity is the symmetrical fault current a breaker can interrupt. Making capacity is the asymmetrical peak current it can close onto and withstand in the first cycle, which depends on the X/R ratio at the fault point. Close to large transformers and generators the peak check can fail before the breaking check does.
Why can arc-flash energy be higher on generator supply?
Arc-flash energy depends on the arcing current and how long it lasts. On generator supply the fault current is lower, so protection may clear more slowly, and the longer duration can more than offset the lower current. The assessment therefore covers every operating configuration and labels each board for the worst case.
Do I need a short-circuit study for a single generator?
If it connects to existing switchgear or a utility supply, check the switchgear ratings against the combined fault level and confirm that protection still trips on generator-only supply. For a small standalone set feeding a simple board, a documented verification of ratings and protection settings may be enough; any paralleling calls for a proper study.
Why does the minimum fault level matter?
Protection must detect the smallest credible fault, such as a fault at the end of a long cable on generator-only supply. If the fault current there is below the instantaneous setting of the breaker, clearing relies on slower elements or may not happen in time, which is a risk to people and equipment. The study lists such devices.
How often should it be updated?
Whenever the system changes, such as a new source, a transformer change, a new tie, large motors or replaced switchgear, and on a periodic review, commonly every few years, even without known changes, because utility fault levels and site configurations drift. The arc-flash labels are updated from the same results.
Who performs the study?
A power systems engineer using recognised calculation software and methods such as IEC 60909, working from verified data: the single-line diagram, utility fault levels, transformer and generator data, motor lists, cable sizes and protection settings. The quality of the result depends on that data, so it is collected and checked on site.
Figures are illustrative. A real study requires verified data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.