In short. A protection coordination study sets breakers and relays so the device nearest a fault trips first, on both mains and generator supply. It needs a short-circuit study first. A site needs one when sets are paralleled, when nuisance or upstream trips happen, when loads are critical, when the system has changed since the settings were made, or when there is a high-voltage side. The decision tool above gives a first screen from six questions.
Who this page is for: For facility managers, plant engineers and consultants deciding whether a site needs a protection study.
Key facts
- Short-circuit study first; coordination study second.
- Generator fault current is far lower than the grid’s.
- Settings that work on mains may not trip on generator.
- Any added source, transformer or large load can upset coordination.
- Main breaker trips for downstream faults signal poor coordination.
- Paralleled sets need generator protection settings as well.
Worked example: two sites screened (illustrative)
| Question | Office, 160 kVA | Hospital, 2 × 750 kVA |
|---|---|---|
| Total generator capacity | Up to 250 kVA | Above 1000 kVA |
| Sets paralleled? | No | Yes |
| Nuisance or upstream trips? | No | Yes, once on generator |
| Critical load? | No | Yes |
| Changes since settings? | No | New wing added |
| High-voltage side? | No | Yes, 11 kV |
| Outcome | Standard settings likely adequate; check on generator | Full short-circuit and coordination study |
See short-circuit studies and coordination studies.
Do not assume protection that works on mains also works on generator supply. Check that every main feeder breaker still trips fast enough at generator fault levels.
What a study needs
| Input | Use |
|---|---|
| Single-line diagram | The system model |
| Breaker and relay data | Device curves and ranges |
| Cable sizes and lengths | Fault levels at each board |
| Transformer and generator data | Source fault current |
See study selector.
Screening sheet
| Question | Answer |
|---|---|
| Generator capacity | |
| Paralleled? | |
| Trips experienced | |
| Changes since last settings |
Protection functions a generator system needs
A generator installation is protected at several levels, and each function has its own job. Knowing what each does makes it easier to see which settings a study must check and which faults are already covered.
| Function | Common device number | What it protects against |
|---|---|---|
| Phase overcurrent, time-delayed | 51 | Overloads and slow-developing faults |
| Phase overcurrent, instantaneous | 50 | Heavy short circuits close to the source |
| Voltage-restrained overcurrent | 51V | Faults on generator supply where current decays |
| Earth fault | 51N or 51G | Insulation failure to earth |
| Reverse power | 32 | Motoring of a paralleled set |
| Under and over voltage | 27 and 59 | Regulator faults and abnormal operation |
| Under and over frequency | 81 | Governor faults, overload, loss of mains |
| Loss of excitation | 40 | Field failure on paralleled sets |
| Differential | 87 | Internal winding faults on larger machines |
Small single sets usually rely on the breaker trip unit and the controller, while paralleled plants and larger machines add dedicated relays. The study confirms that each function is present where it is needed and that its setting suits both the machine and the system around it.
How grading works, with numbers
Grading means that, for any fault, the device closest to it operates first and the next device upstream waits long enough to stay closed. The difference in operating time between two devices at the same fault current is the grading margin. For electromechanical relays it is often taken as 0.4 seconds, and for modern numerical relays and electronic trip units 0.25 to 0.3 seconds is common, covering breaker opening time, relay overshoot and tolerances.
Take a feeder breaker that clears a 4000 A fault in 0.10 seconds. With a 0.3-second margin, the main incomer must not operate before 0.40 seconds at 4000 A. If the incomer uses a standard inverse curve with a time multiplier chosen to give 0.45 seconds at that current, the pair grades correctly. The same check is then repeated at the lowest fault current the feeder can see, because inverse curves can cross at low currents even when they are well separated at high currents.
Why generator supply changes the answer
On mains supply a site may see a three-phase fault current of 20 to 30 times the rated current of its transformer. A generator supplies much less: the initial current may be around eight to ten times rated current, falling within a fraction of a second, and settling at about three times rated current only if the excitation system can sustain it. For a 500 kVA set at 415 V, rated current is about 696 A, so a sustained fault current near 2100 A is a realistic planning figure with good excitation support, and much less without it.
A main breaker with a short-time setting of 4000 A, chosen for mains faults, may therefore never operate on a generator fault. The study checks each device against the generator fault current over time, and where needed proposes a second settings group selected automatically on generator supply, voltage-restrained overcurrent, or an alternator with permanent magnet excitation that holds fault current up long enough for protection to work.
Current transformers and wiring
Protection is only as good as the measurements feeding it. Current transformers must have a ratio that suits both the load and the fault range, an accuracy class for protection rather than metering, and enough capacity not to saturate at the highest fault current. Polarity errors in a differential or earth fault scheme can cause false trips or no trip at all. The study lists the transformers assumed for each relay, and commissioning confirms ratio, polarity and burden on site.
Earth fault protection and the neutral arrangement
Earth fault protection depends on where the neutral is earthed and on whether the changeover switches the neutral. Where each source has its own neutral earth bond, a four-pole changeover keeps the neutral current on its own path and the earth fault relay sees a true residual current. Where the neutral is earthed at a single point and a three-pole changeover is used, the relay position must be chosen so that normal neutral current is not mistaken for an earth fault. False earth fault trips on generator supply are one of the most common problems a protection review finds.
Proving the settings on site
- Compare the settings in each relay and trip unit with the study, line by line, and record any difference.
- Inject secondary current into each relay to confirm pick-up and timing at several points on its curve.
- Check current transformer ratio and polarity with primary injection or on load.
- Prove each trip path by operating the relay and confirming the breaker opens.
- Test the settings group change on generator supply where one is used.
- Record every result with the date, instrument and the person who carried out the test.
Settings files are kept with the study, so the next review starts from what is actually installed rather than from memory.
When a review is due
- A new generator, transformer or large motor is added.
- Sets are paralleled with each other or with the grid for the first time.
- Breakers or relays are replaced, even with similar models.
- Nuisance tripping appears, or a fault was not cleared by the expected device.
- Several years have passed since the last review and small changes have accumulated.
Motor and transformer inrush in the settings
Protection must ride through normal events that look like faults for a moment. A motor started direct on line draws six to eight times its rated current for several seconds, and a transformer being energised draws a magnetising inrush that can reach ten times its rated current for a fraction of a second.
Instantaneous elements set too low trip on these events, which is a common cause of nuisance tripping on generator supply, where the inrush is a larger share of the source capacity. The study plots each starting and inrush curve against the protection curves, and the settings are chosen so that every normal event passes while real faults are still cleared quickly.
What a settings schedule should show
| Column | Content |
|---|---|
| Device | Breaker or relay reference matching the single-line diagram |
| Transformer ratio | Current transformer ratio and class |
| Long-time | Pick-up and time band or curve and multiplier |
| Short-time | Pick-up and delay |
| Instantaneous | Pick-up, or disabled where grading requires |
| Earth fault | Pick-up and delay |
| Source case | Mains, generator or both, with any settings group noted |
A schedule in this form lets a site engineer set and check every device without opening the study software.
Keeping the protection record current
The study, the settings schedule and the test results form one record. Whenever a device is replaced or a setting is changed, the schedule is updated the same day, the change is tested, and the reason is noted. Without that discipline, a system that was coordinated at commissioning drifts out of coordination over the years, and the next fault reveals it. A yearly check of a sample of relays against the schedule, and a full review every few years or after major changes, keeps the protection as good as the day it was set.
Common mistakes
- Coordination without fault levels.
- Settings checked on mains only.
- Study not updated after changes.
- Generator protection forgotten.
What to send us
Send your single-line diagram and breaker data. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The example is illustrative.
Questions engineers ask
What grading margin should be used between two protective devices?
Commonly about 0.25 to 0.3 seconds between modern numerical relays or electronic trip units, and about 0.4 seconds where electromechanical relays are involved. The margin covers breaker opening time, relay overshoot and tolerances, and it is checked at both the highest and lowest fault currents each pair can see.
Why does a breaker that trips on mains faults stay closed on generator faults?
A generator supplies much less fault current than the grid, and it falls within a fraction of a second. A 500 kVA set may sustain only about 2100 A with good excitation support, so a 4000 A short-time setting never picks up. A generator settings group or voltage-restrained overcurrent solves it.
How are protection settings proved after a study?
Each relay and trip unit is compared with the settings schedule, then tested by secondary injection at several points on its curve, current transformer ratio and polarity are checked, and every trip path is operated. Results are recorded with the date and instrument, and kept with the study.
What causes nuisance tripping on generator supply?
Usually motor starting or transformer inrush tripping instantaneous elements set for mains conditions, a second neutral earth bond making the earth fault relay see neutral current, or settings that suit the grid but not the lower generator fault level. A protection review on generator supply finds the cause.
What is protection coordination?
Setting devices so the one closest to a fault trips first, leaving the rest in service. It is achieved by grading time and current settings of devices in series, checked across the full range of fault currents and for every source, including generator supply, where fault currents are lower and protection may respond differently.
Is an arc-flash study required?
Often for safety programmes and standards. Requirements vary; check your rules. The study calculates the incident energy at each point where people work on live equipment, and its results set the protective equipment, warning labels and safe working distances, so the hazard is known before a panel is opened.
Which comes first?
The short-circuit study, then coordination, then arc-flash. Fault currents from the short-circuit study are needed to grade the protection, and the clearing times from the coordination study are needed to calculate arc-flash energy, so each study builds on the one before and they are updated together.
How often should studies be updated?
After changes and at periodic reviews. A new source, a larger transformer, changed cables or replaced breakers can alter fault levels and grading, so studies are updated with each change, and a periodic review, often every few years, catches changes that were made without one, such as a replaced breaker with different settings.
This guide gives general principles. Studies must be performed by qualified engineers using verified data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.