UPS Capacity Calculator

How to size a UPS: load in kW and kVA, power factor, crest factor, redundancy, growth, efficiency and the generator and battery implications that come with the chosen rating.

In short. A UPS has both a kW and a kVA rating, and the load must fit within both after growth and a sensible maximum loading. When the load’s power factor is lower than the UPS output power factor, kVA usually decides the size. When it is higher, kW decides. Then check the generator behind the UPS, which should be well above the UPS input because rectifier load is non-linear.

Who this page is for: For IT managers, facility managers and electricians sizing a UPS for a known critical load.

Key facts

  • Required kW = load kW × (1 + growth) ÷ maximum loading.
  • Required kVA = load kVA × (1 + growth) ÷ maximum loading.
  • The UPS must meet both; the larger decides.
  • Check the UPS output power factor on its rating plate.
  • The generator should be about 1.5 to 2 times the UPS input kVA.
  • Battery size is a separate calculation.

Worked example: the calculator’s defaults

ItemWorkingResult
Load today24 kW at 0.9 power factor26.7 kVA
kW required24 × 1.2 growth ÷ 0.8 loading36 kW
kVA required26.7 × 1.2 ÷ 0.840 kVA
UPS chosen, output power factor 1.0Must give 40 kVA and 36 kW40 kVA (40 kW)
Generator behind itUPS input about 40 kVA at full load (more with losses and battery recharge) × 1.5 to 2at least 60–80 kVA for the UPS alone

Here kVA decides, because the load power factor (0.9) is below the UPS output power factor (1.0). See UPS architecture and battery autonomy.

Do not size a UPS from the nameplate kVA of the connected equipment. Measure the real load in kW and kVA, then add growth.

After sizing

CheckWhy
Redundancy: N+1 modules or a second UPSSurvive a UPS failure. See modular UPS
Overload and fault-clearing abilityDownstream breakers must trip on UPS supply
Input current and harmonicsCable, breaker and generator sizing
Bypass sourceWhat feeds the load if the UPS fails

UPS sizing sheet

ItemValue
Load kW and power factor 
Growth and maximum loading 
kW and kVA required 
UPS output power factor 

Common mistakes

  • Only kVA checked.
  • No growth allowance.
  • Generator too small for the UPS.
  • Downstream protection not checked on UPS supply.

What to send us

Send measured load and backup time needed. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The worked example uses the calculator’s defaults.

Questions engineers ask

Is a UPS rated in kVA or kW?

Both. Check each, since the kW rating depends on the output power factor.

How much spare capacity should I leave?

Commonly 20 to 30 percent for growth and tolerance, depending on policy and redundancy.

Why must the generator be bigger than the UPS?

Because of UPS losses, battery charging and input power factor and harmonics.

Can a UPS clear faults downstream?

Inverters supply limited current, so protection may rely on bypass or fast-acting devices.

Figures are illustrative. Use manufacturer ratings for design.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.