How to choose which generators to run as load changes: start and stop thresholds, running-hour balancing, redundancy margin, minimum loading and the dispatch rules for a parallel plant.

In short. In a paralleled plant, you rarely need every set running. Dispatch rules start and stop sets as the load rises and falls. They keep each running set in a healthy loading band and always hold enough reserve to take the next step or lose a set. A gap between the start and stop points, plus a time delay, stops sets from cycling on and off.

Who this page is for: For plant engineers and operators setting up load-dependent start and stop on multi-generator plants.

Key facts

  • Keep running sets in a healthy band, often about 50–80%.
  • Start the next set before running sets pass the upper limit.
  • Stop a set only when the rest stay below a lower limit.
  • Time delays and a gap between limits prevent cycling.
  • Hold reserve for the largest step or the loss of a set.
  • Rotate the lead set to share running hours.

Worked example: the calculator’s running table, with rules added

LoadSets runningLoading eachRule
225 kW156%Start second set above 320 kW (80% of one)
450 kW256%Start third above 640 kW; stop second below 280 kW (70% of one)
675 kW356%Start fourth above 960 kW; stop third below 560 kW (70% of two)
900 kW375%Spare set ready to start

The calculator’s defaults are 900 kW on 500 kVA sets (400 kW each) at 80% planned loading. Each stop point is set so the sets left running would be at 70%, ten points below the 80% start point, with a delay of several minutes, so a load hovering near a limit does not start and stop a set repeatedly. See number of sets and paralleling studies.

Do not stop a set if the largest expected load step would then overload the sets still running. Check the reserve, not just the average loading.

Reserve checks

CheckQuestion
Step reserveCan the running sets take the largest load step?
Trip reserveIf one running set trips, will load shedding protect the rest?
Start timeCan the next set start and synchronise before it is needed?

See load-shedding planner.

Dispatch settings sheet

Sets runningStart next aboveStop one belowDelay
1 Not applicable 
2   
3   

How a dispatch controller decides

A plant of several generators sharing one bus runs only as many sets as the load needs, plus a reserve. The controller measures the total load continuously and compares it with the capacity of the sets that are running. When the load rises above a start threshold, it starts the next set in the sequence, synchronises it and shares load across all running sets. When the load falls below a stop threshold, it unloads one set gradually, opens its breaker and lets it cool down before stopping. Time delays on both decisions stop the plant reacting to short swings.

SettingTypical choicePurpose
Start thresholdAbout 80% of running capacityBring another set before the running sets are overloaded
Start delayTens of secondsIgnore short peaks such as motor starts
Stop thresholdLoad fits in remaining sets at about 60 to 65%Avoid stopping a set that would be needed again soon
Stop delaySeveral minutesConfirm the load has really fallen
Cool-downA few minutes unloadedProtect turbochargers and engines
Lead set rotationBy running hours or weeklySpread wear evenly

Thresholds worked through (illustrative)

A plant has four 500 kVA sets, each giving 400 kW at 0.8 power factor. With two sets running, capacity is 800 kW. A start threshold of 80% starts the third set when load passes 640 kW. With three sets running, capacity is 1200 kW; the stop threshold is set so that one set stops only when the load would sit at about 65% of the two remaining sets, that is below about 520 kW. The gap between 520 and 640 kW is the hysteresis band, and within it the plant keeps whatever number of sets is running, so a load hovering near 600 kW does not cycle a set on and off.

Spinning reserve is checked separately. If the largest single step on site is a 150 kW chiller, the running sets must be able to accept it without frequency falling below the protection settings, which the load step acceptance of the engines decides. If two sets at 600 kW cannot accept that step, the controller keeps a third set running whenever the chiller may start.

Light load and wet stacking

Dispatch is as much about avoiding light load as about avoiding overload. Diesel engines that run for long periods below about 30% load build up carbon and unburnt fuel in the exhaust, known as wet stacking. Good dispatch keeps running sets at a healthy share of their rating by stopping surplus sets at night or at weekends. Where the minimum site load is still too low for one set, a smaller set in the plant, a battery that carries the light load, or periodic loading on a load bank solves the problem.

When a running set trips

If one of the running sets trips, the others must carry its load immediately. The controller starts a standby set at once and, if the remaining sets would be overloaded before it arrives, sheds low-priority loads in planned stages. Restoration follows in reverse order once capacity is available. The shedding stages and their priority order are written down, agreed with operations and tested by tripping a running set on load during commissioning.

Plants with sets of different sizes

Mixed plants are common where sets were added over years. The controller must share load in proportion to each set rating, not equally, and the start sequence should bring the most suitable set for the load band: a smaller set for light loads, larger sets for peaks. Reserve and N+1 checks always remove the largest running set, because that is the worst single loss. Settings for each set are recorded in one schedule so that a change on one set is not made without checking its effect on the others.

Testing the dispatch scheme

  1. Raise load in steps with a load bank or real load, and record the load at which each set starts and the time it takes to share.
  2. Lower load in steps and record each stop, the unloading rate and the cool-down.
  3. Hold load inside the hysteresis band and confirm no set cycles.
  4. Trip a running set on load and record frequency, shedding stages and restoration.
  5. Apply the largest site step and confirm frequency and voltage recover within limits.

Dispatch and fuel use

Each running set burns fuel at a rate that depends on its load, and the litres per kilowatt-hour are lowest between about 70 and 100% load. Running two sets at 40% each usually burns more fuel than one set at 80% for the same output. A dispatch scheme that keeps fewer sets running at healthier loads therefore saves fuel as well as reducing wear, provided the reserve rule is still met. Fuel records divided by energy generated, month by month, show whether the settings are working and whether a change in thresholds would help.

Running the plant by hand

Controllers fail, and operators must be able to run the plant safely without them. A written procedure covers starting and synchronising each set manually where the switchgear allows, sharing load by watching kW on each set, shedding loads in the agreed order and stopping sets safely. Operators practise it at planned intervals, because a procedure that has never been used is rarely followed correctly at night during an emergency. The automatic scheme is restored and tested before the plant returns to unattended operation.

Reviewing settings as the site changes

Thresholds chosen at commissioning reflect the load at that time. New equipment, a changed production pattern or a larger chiller can make the old settings start sets too late, cycle them too often or leave too little reserve. A review each year, using the controller event log of starts, stops, peaks and trips, shows how the plant has actually behaved and whether the settings still suit the site.

Records the controller should keep

A modern dispatch controller logs every start, stop, synchronisation, trip and load-shedding event with its time and the load at that moment. Running hours and energy for each set, peak loads and the number of starts per day are summarised monthly. These records show whether thresholds suit the site, whether one set is doing more than its share, and whether light-load running is creeping in, and they are the evidence for any change to the settings.

Common mistakes

  • Start and stop points too close.
  • No time delay.
  • Reserve not checked before stopping.
  • Same set always leading.

What to send us

Send your load profile and set ratings. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The running table comes from the calculator’s defaults; the rules are illustrative.

Questions engineers ask

How do I set start and stop thresholds for several generators?

Start the next set at about 80% of running capacity after a delay of tens of seconds, and stop one only when the load would fit the remaining sets at about 60 to 65% after several minutes. The gap between the two prevents sets cycling on and off.

What happens if a running set trips?

The others take its load at once, the controller starts a standby set, and low-priority loads are shed in planned stages if the remaining sets would be overloaded before it arrives. Restoration follows in reverse order, and the scheme is proved by tripping a running set on load.

Does running fewer generators save fuel?

Usually yes. Litres per kilowatt-hour are lowest between about 70 and 100% load, so two sets at 40% generally burn more than one at 80% for the same output. Dispatch that keeps fewer sets at healthier loads saves fuel, provided the reserve rule is still met.

Can a plant with different generator sizes share load correctly?

Yes, if the controller shares load in proportion to each set rating rather than equally, and the start sequence brings the most suitable set for each load band. Reserve and N+1 checks always remove the largest running set, because its loss is the worst single event.

How much spinning reserve should I keep?

Enough to cover the largest credible step or the loss of the biggest running unit, depending on your resilience target. Too much reserve keeps sets at light load, wasting fuel and causing wet stacking, while too little risks overload when a set trips, so the reserve is set from the actual load steps and the failure the site must ride through.

Why add hysteresis?

So units do not start and stop repeatedly around one threshold. The start threshold is set higher than the stop threshold, with time delays on both, so a load that hovers near one value does not cycle a set on and off, which wastes fuel and wears starters, breakers and engines.

Should I run units in rotation?

Yes, to balance wear, subject to maintenance schedules. Rotating the lead set by running hours or calendar spreads wear evenly and keeps every set exercised, while a set due for service is moved to the end of the order so that it is available when maintenance is carried out.

Can dispatch run without a controller?

Manually, yes, but automatic dispatch is faster and more consistent. Manual dispatch relies on an operator watching the load and acting in time, which is hard at night or during an emergency, while an automatic controller starts, synchronises and stops sets on measured load every time.

Figures are illustrative. Set thresholds from engine guidance and your load profile.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.