In short. Switching on a transformer can draw a brief magnetising inrush many times its rated current, rich in harmonics and slow to decay. A generator has far less short-circuit strength than the grid, so the same inrush that the grid shrugs off can collapse a generator’s voltage or trip its protection. Screen the inrush against the generator’s capability before the first restart, and plan staged or soft energisation where the margin is thin.
Who this page is for: For engineers energising transformers from generators: step-up sets, plants that restart on generator after an outage, and rental supplies feeding transformers.
Key facts
- Peak inrush is often around 5 to 12 times the transformer’s rated current.
- It decays over a fraction of a second to several seconds; a weak source lengthens it.
- Generator initial fault current ≈ rated current ÷ X″d; inrush approaching this level will collapse the voltage.
- Several transformers energised together add their inrushes.
- Second-harmonic content can mislead protection that lacks harmonic restraint.
- Staging, energising before load and soft (ramped) energisation are the usual fixes.
Screening approach
- Get the transformer’s rated current and inrush multiple from its maker.
- Estimate the inrush peak.
- Compare it with the generator’s initial fault current (rated current ÷ X″d).
- Check generator and transformer protection settings against the inrush and its harmonics.
- Decide the energisation sequence and any soft-start method.
Worked example: a 750 kVA set energising a 500 kVA step-up transformer (illustrative)
| Step | Working | Result |
|---|---|---|
| Transformer rated LV current | 500,000 ÷ (1.732 × 415) | About 696 A |
| Inrush peak at about 10 times | 696 × 10 | About 7000 A |
| Generator initial fault current (X″d about 0.12) | 1043 ÷ 0.12 | About 8700 A |
| Ratio | 7000 peak ÷ 8700 r.m.s. | About 80% on this conservative screen (about 57% against the generator’s first peak of about 12,300 A): either way, expect a deep, prolonged voltage dip |
| Mitigation | With the set dedicated to the transformer, close the breaker before the set builds voltage, then ramp the voltage up (the voltage regulator and protection must allow it) | Magnetising current rises gradually with no sudden inrush |
Where the set must also feed other loads, the transformer is energised first, on its own, before any other load is connected. If two such transformers are on the bus, they are energised one at a time. See transformer energisation studies.
Do not energise a transformer that is large relative to the generator while other loads are connected, and never energise several at once. Stage them, energise them first, or ramp the voltage, and confirm protection will not trip on the inrush.
Typical magnitudes
| Feature | Typical |
|---|---|
| Peak inrush | About 5 to 12 times rated current; higher in some designs |
| Decay | Tenths of a second to several seconds |
| Harmonics | Strong second harmonic |
| Source effect | A weaker source lowers the peak but prolongs the decay and the voltage dip |
Protection
Generator overcurrent elements may see the inrush as an overload or fault, and differential schemes need second-harmonic restraint. Check the instantaneous settings against the inrush peak and use a short delay where the damage curves allow. See transformer protection.
Inrush screening sheet
| Item | Value | Example: the 500 kVA step-up case on this page (illustrative) |
|---|---|---|
| Transformer kVA, voltage and rated current | 500 kVA at 415 V; about 696 A | |
| Inrush multiple (maker) and peak (A) | About 10 times; about 7000 A peak | |
| Generator rated current and X″d | 750 kVA set, about 1043 A; X″d about 0.12 | |
| Inrush as a share of generator fault current | About 80% of about 8700 A | |
| Energisation method and sequence | Transformer energised alone; breaker closed before the set builds voltage, then voltage ramped |
Reading the calculator’s defaults
The calculator opens with a 1000 kVA transformer, an inrush of ten times rated current, a 1250 kVA generator and a subtransient reactance of 0.15. Its three answers follow from two lines of arithmetic:
| Line | Working | Result |
|---|---|---|
| Theoretical inrush | 1000 kVA × 10 | 10,000 kVA |
| Voltage dip | (10,000 × 0.15) ÷ (1250 + 10,000 × 0.15) | about 55% |
| Inrush the set actually supplies | 10,000 × (1 − 0.55) | about 4545 kVA |
A dip of more than half the voltage drops contactors, resets drives and can trip the generator on undervoltage. The answer is not a larger number to be accepted but a sign that the energisation method has to change.
How generator size changes the dip
For the same 1000 kVA transformer at ten times inrush and a reactance of 0.15:
| Generator | Estimated dip | Verdict |
|---|---|---|
| 1250 kVA | about 55% | Too deep; change the method |
| 2000 kVA | about 43% | Still too deep with other loads connected |
| 3000 kVA | about 33% | Workable only with the transformer energised alone |
Even a set more than twice the size leaves a dip that most installations cannot accept with load connected. Buying generator capacity to ride through inrush is expensive; changing how the transformer is switched on is usually cheaper and better.
Why the same transformer gives different inrush each time
Inrush depends on the residual magnetism left in the core when it was last switched off and on the point of the voltage wave at which it is switched on again. Closing near a voltage zero with residual flux in the same direction drives the core deep into saturation and gives the worst case; closing at the matching point gives almost none. That is why one energisation goes smoothly and the next trips the set, and why a single successful test does not prove the arrangement. Controlled, point-on-wave switching uses this effect deliberately to keep inrush small.
Transformers already in service also matter. When a second transformer is switched on beside one that is already energised, the first can draw a sympathetic inrush, so the disturbance lasts longer than either would alone.
Energisation methods compared
| Method | How it works | Effect on the generator |
|---|---|---|
| All transformers together | Every breaker closes at once | Largest dip; inrushes add; not recommended on generator |
| Staged, one at a time | Each transformer closed after the last has settled | One inrush at a time; loads connected afterwards |
| Soft (ramped) energisation | Breaker closed before the set builds voltage, then voltage ramped up | Magnetising current rises gradually; little or no inrush |
| Pre-magnetising | A small auxiliary supply magnetises the core before the main breaker closes | Much smaller inrush on closing |
| Point-on-wave switching | Controller closes each pole at the best point on the wave | Small inrush once residual flux is known |
Protection settings to check before the first energisation
- Transformer differential protection with harmonic restraint, so the second-harmonic content of inrush blocks a false trip.
- Generator overcurrent and voltage-controlled overcurrent elements, with time delays that ride through the inrush but still clear a real fault.
- Undervoltage and underfrequency trips on the generator and on loads, set so a brief, expected dip does not shut down the plant.
- Instantaneous elements on the transformer feeder set above the expected inrush peak.
Settings are confirmed with the protection maker’s data, and the first energisation on generator is recorded with a power-quality recorder so that later changes are based on measurement.
Two smaller transformers or one large one
A site with two 500 kVA transformers presents the same 10,000 kVA of theoretical inrush as one 1000 kVA unit if both are switched on together. Energised one at a time, each presents about 5000 kVA, and on the 1250 kVA set with a reactance of 0.15 the estimated dip falls from about 55% to about 38%, with the first transformer already settled before the second closes. Staging is the simplest improvement available, and the energisation sequence is written into the plant’s restart procedure so that it is followed after every outage, not only at commissioning.
Recording an energisation
A power-quality recorder on the generator terminals during the first energisation captures the voltage dip, its duration, the current peak and how long the inrush takes to decay. Those figures confirm or correct the screening estimate, show how much margin the protection settings have, and give a baseline for future changes such as adding a transformer or moving to a different generator. The record is kept with the plant’s commissioning file.
Rental sets and temporary transformers
Rental generators often feed transformers that were never meant to be energised from a diesel set, during shutdowns or while a utility supply is repaired. The same screening applies: the transformer rating and its inrush multiple are compared with the rental set’s capability before the hire is booked, and the set is chosen so the transformer can be energised alone, before any load is connected, with the outgoing breakers open.
Generator settings that help
Some generator controls make energisation easier. A voltage regulator with a soft-start ramp lets the transformer magnetise gradually when its breaker is closed before the set builds voltage. A permanent magnet excitation system keeps excitation available during the dip, so the voltage recovers faster. A governor tuned for the plant’s actual load steps limits the frequency excursion when the transformer and then its load are connected. Each setting is agreed with the generator maker, applied at commissioning and recorded, so a later service does not quietly return it to the factory default.
The same thinking applies after every outage, not only at commissioning. When the mains fails and the plant restarts on generator, transformers that were magnetised a moment earlier may carry residual flux in an unfavourable direction, so the restart sequence that worked on a calm commissioning day must also work on the worst switching instant.
Writing the sequence into the AMF or power management logic, rather than leaving it to whoever is on shift, is what makes it repeatable. A short note beside the panel naming the order, the waiting time between transformers and the person to call if a breaker trips keeps the plant safe when the restart happens at night.
Common mistakes
- Energising with load already connected.
- Energising several transformers together.
- Protection without harmonic restraint.
- Using grid experience to judge a generator restart.
What to send us
Send the transformer and generator data, protection settings and the restart sequence. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. The comparison is a screening guide; the transformer maker’s inrush data and a study govern.
Questions engineers ask
Will a bigger generator solve transformer inrush?
Only partly and at high cost. For a 1000 kVA transformer at ten times inrush, the estimated dip falls from about 55% on a 1250 kVA set to about 33% on a 3000 kVA set. Staged, soft or pre-magnetised energisation usually solves it for far less.
Why does inrush vary from one switching to the next?
Because it depends on the residual magnetism left in the core and on the point of the voltage wave at which the breaker closes. Closing near a voltage zero with residual flux in the same direction gives the worst case, which is why one successful energisation does not prove the arrangement.
How long does inrush last?
From a fraction of a second to several seconds, depending on the transformer, its residual magnetism and the strength of the source. A generator is a weak source compared with the grid, so inrush on generator supply decays more slowly and the voltage dip lasts longer than on mains.
Can inrush trip a generator?
Yes. A deep voltage dip can trip it on undervoltage, the current can operate overcurrent elements, and the harmonic content can upset protection without harmonic restraint. With a 1000 kVA transformer on a 1250 kVA set the screening dip is about 55%, enough to drop contactors and drives.
How do I reduce it?
Energise transformers one at a time before connecting load, use soft energisation by closing the breaker before the set builds voltage and then ramping it, fit a pre-magnetising scheme, or use point-on-wave switching. Each is cheaper than buying generator capacity only to ride through inrush.
Is it the same as the short-circuit current?
No. Inrush is magnetising current as the core saturates, not a fault, but its first peaks can approach fault-current levels for a short time. Its second-harmonic content is what lets transformer differential protection recognise it and avoid a false trip, so that relay is checked before the first energisation on generator.