Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Critical Power and Resilience

Designing power for loads that must not fail: UPS, generators and BESS, transfer coordination, N+1 and 2N redundancy, and testing.

In short. Critical power is designed for continuity, not just capacity. It starts by classifying loads by how long each can go without power. It then builds a chain of sources (mains, UPS, generator and battery storage) and a distribution system in which no single failure, maintenance task or human error drops the critical load. The chain is then proved by testing it as a whole. Redundancy that shares a room, a fuel tank or a controller is not real redundancy.

Who this section is for: For owners, consultants and facility engineers of hospitals, data rooms, plants and other sites where a power failure is not acceptable.

Key facts

  • Classify loads first: no-break, short-break and long-break.
  • UPS covers the gap until the generator takes over, with margin for failed starts.
  • N+1 survives one failure; 2N survives a failure during maintenance.
  • Check loading after a failure, not only in normal running.
  • Shared rooms, fuel, controls and boards defeat redundancy.
  • Only an integrated mains-failure test proves the system.

How this section is organised

GroupQuestions it answersStart with
Loads and sourcesWhat must keep running, and from what?Load classes
UPS and batteriesHow big, how long, how redundant?UPS architecture
Transfer and distributionHow does power reach the load through a failure?Transfer coordination
Redundancy and failureWhat survives, and what does not?Fault tolerance
Control and recoveryShedding, restart, black start, islandsLoad shedding
Monitoring, testing and lifeHow do we know it will work?Failure testing
Choosing an architectureWhich design suits our requirement?Requirement to architecture

Worked example: from requirement to tested system for a hospital block (illustrative)

StepDecision
Classify loads60 kW no-break on UPS; 180 kW short-break on generator; 260 kW shed
Size sourcesUPS with 15 minutes of battery; generators sized for 250 kW (240 kW of load plus UPS battery recharge) with one set out
RedundancyN+1 generators; A and B distribution to critical rooms
ControlsLoad shedding on set trip; staged restart
ProofIntegrated mains-failure test, including return to mains

An integrated test like this is what finds a critical server left on a mains-only board, while it can still be put right before handover. See continuity chain and A and B distribution.

Do not accept a critical power system on component test certificates alone. Faults between systems only show up when mains is actually switched off under load.

Where to start

If your question is…Start with
How much UPS battery time do we need?Battery autonomy
N+1 or 2N?Redundant architectures
Running several generators togetherMulti-generator plants
Upgrading without a shutdownModernisation

Requirement sheet

QuestionAnswer
Loads that cannot take any break 
Downtime acceptable per year 
Maintenance without shutdown needed? 
Longest outage to plan for 

What to send us

Send your critical loads, current arrangement and the downtime you can accept. WhatsApp 98852 01608 or use the application engineering enquiry.

All 42 guides in this section

Key figures from across this section

Each guide in this section works through its subject with its own calculations. The figures below are the ones most often asked for, each taken from the guide that explains it, so that the answer and its reasoning are one click apart.

QuestionShort answerWorked through in
How much does each extra spare unit help?With three units needed, each available 98% of the time, failures per 1000 demands fall from about 58.8 with no spare to about 2.3 with one and about 0.1 with twoN, N+1, N+2 and 2N
How fast does a static transfer switch transfer?About 4 to 12 ms, a quarter to half a cycleStatic transfer switch systems
How much power can a dual-corded rack draw?About 5.6 kW on single-phase 32 A strips, keeping each strip within 80% after the other side failsA/B power distribution
Standby or prime generator rating?Three hours of outage a day is about 1095 running hours a year, beyond what a standby rating allowsEmergency and standby generators
How quickly must load be shed when a set trips?Often within a few tenths of a second; a direct scheme acts in about 0.1 to 0.2 sLoad shedding and priority control
What ageing allowance goes into UPS battery sizing?Commonly 1.25, so the battery still meets the autonomy at 80% of its new capacityUPS battery autonomy

Every figure rests on assumptions stated in its guide, and the guides show how to repeat the calculation with a site’s own data. Use the table to find the right guide quickly, then use the guide, not the table, for any decision.

Questions engineers ask

What is the difference between N+1 and 2N?

N+1 adds one spare unit to the number needed, so one unit can fail. 2N duplicates the entire system, so a whole path can fail or be maintained without affecting the load. For example, a 1000 kVA load with 500 kVA sets needs three sets for N+1, or two complete 1000 kVA systems for 2N. The choice depends on the cost of an outage.

Is a generator alone enough for critical loads?

No. A generator takes seconds to start and transfer. Loads that cannot tolerate any break need a UPS or battery system to bridge that gap. Size the UPS runtime to cover the generator start, the transfer and a failed first start attempt, and test the whole sequence on load, since each part may work alone while the combination fails.

Engineering content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026. For advice on your own site, send us your requirement or call 98852 01608.

CallWhatsAppEnquire