Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Critical-Power Monitoring, SCADA and Power Analytics

What to monitor in a critical-power system, how SCADA and analytics turn data into early warning, and how to design alarms, history and remote access without adding new failure points.

In short. Monitoring turns a critical power system from something you hope works into something you can see working. Measure each source, UPS, battery and main feeder. Record events with accurate, synchronised timestamps, and review trends, not just alarms. Most failures give warning first: a battery string ageing faster than the rest, a transformer loading creeping up, or fuel disappearing overnight. Analytics are only useful if someone looks at them and acts.

Who this page is for: For facility managers and engineers setting up or improving monitoring of generators, UPS and critical distribution.

Key facts

  • Measure kW, kVA, power factor, voltage, current and distortion at each source.
  • Monitor UPS state, battery health, generator status and fuel level.
  • Log breaker positions and trips as timestamped events.
  • Synchronise clocks so events from different devices line up.
  • Review trends monthly; most warnings are slow, not sudden.
  • Assign an owner for every report and alarm.

What to monitor

EquipmentKey points
Transformers and incomersLoading, voltage, power factor, distortion
GeneratorsRunning state, load, fuel level, starting battery, alarms
UPSMode, load, bypass availability, alarms
BatteriesString and block voltage, internal resistance, temperature
SwitchgearBreaker positions and trips
RoomsTemperature, humidity, water detection

Worked example: what one year of trends showed (illustrative)

TrendMeaningAction
One battery string’s internal resistance up 25% against the othersString ageing fastReplaced before a discharge test would have failed
Generator day tank down 150 litres overnight with the set stoppedLeak or theftLeak found at a fuel line joint
Transformer loading reaching 92% on summer afternoonsLittle headroomCooling load moved; capacity study started

None of these raised an alarm on its own. They showed up only because someone reviewed the trends each month. See alarm management and battery autonomy.

Do not install monitoring and then only react to alarms. Slow trends give the earliest warning, and they need a person to review them.

Data settings

DataTypical recording
Energy and loading trendsEvery 15 minutes
Events and tripsTimestamped to the millisecond where possible
Power quality disturbancesCaptured as waveform records

Monitoring coverage sheet

EquipmentMonitored?Trend reviewed byHow often
Generators and fuel   
UPS and batteries   
Transformers and incomers   

How much data a monitoring system produces

Monitoring systems are often specified by the number of points they read, and the storage behind them sized as an afterthought. The arithmetic is simple and worth doing early. A system reading 200 analogue values once a second, storing each as an 8-byte value with its time, writes about 1600 bytes a second: about 138 MB a day and about 50 GB a year. That is manageable, but a system with ten times the points, or ten readings a second, quickly is not.

Two techniques cut it down without losing what matters. A deadband stores a new value only when it has changed by more than a set amount, so a voltage that sits steady for an hour is stored a few times rather than 3600. And compression of the stored history, which most historians apply, reduces the volume further. Together they commonly cut the storage by ten times or more, bringing the year in the example to around 5 GB. What must not be thinned in this way are events: breaker operations, alarms and transfers are stored every time, with their full time stamps, because they are what an investigation will need.

How accurate the clocks need to be

A sequence of events is only useful if the times are accurate enough to put the events in the right order. A breaker that tripped 4 ms after another, recorded by two devices whose clocks differ by 50 ms, will appear to have tripped first, and the investigation that follows will be wrong from its first step. The accuracy needed depends on what the record is for.

PurposeAccuracy needed between devicesTypical method
Trends, energy, operator logsAbout a secondNetwork time protocol from a site server
Ordering alarms and transfersAbout 10 msNetwork time protocol on a well-managed local network
Protection sequence of eventsAbout 1 msPrecision time protocol, or a dedicated time code from a satellite clock

The weakest clock decides the accuracy of the whole record. A site where the protection relays are synchronised to a satellite clock but the UPS and generator controllers keep their own time, drifting by seconds a month, cannot reconstruct an event that involved all three. Synchronise every device that records events, check the offsets at each maintenance visit, and record in the event list which time source each device uses.

How many alarms an operator can actually handle

An alarm is useful only if someone can respond to it, and a person can respond to only a limited number in a given time. Guidance widely used in the process industries suggests that in steady operation an operator should see no more than about one alarm every ten minutes on average, and treats more than ten alarms in ten minutes as a flood, in which important alarms are missed among unimportant ones. Electrical monitoring systems routinely exceed both, especially during a supply disturbance, when every device reports the same event in its own words.

Three practices bring the rate under control. Review the alarm list against the question “what should someone do when this appears?”, and turn anything without an answer into a logged event rather than an alarm. Group consequential alarms behind the first cause, so that a mains failure produces one alarm, not forty. And measure the alarm rate monthly from the system’s own log, treating a rising rate as a defect to be fixed, not a fact of life.

Priorities matter as much as numbers. If a third of all alarms are marked high priority, the marking means nothing. A workable distribution keeps the high-priority category for conditions that need action within minutes to protect the critical load — on battery with the generator not running, UPS on bypass, fuel critically low — and places everything else lower, so that the few alarms that truly need a fast response stand out when they come.

Most critical power failures are preceded by a slow change that was recorded but not noticed. A small number of trends, reviewed monthly against a threshold, catch most of them.

TrendWhat a change meansTypical action threshold
Battery block internal resistanceAgeing or a failing blockA rise of around a quarter above the block’s own baseline, or a block well above its neighbours
UPS load per module or unitRedundancy being consumedThe level at which losing one unit would overload the rest
Generator start time and battery voltage during crankingStarting system deterioratingAny steady lengthening or falling voltage over successive tests
Transformer and cable temperaturesOverload or a failing connectionA rise not explained by load or weather
Voltage distortion at the main boardNew nonlinear load, or a resonance developingA step change, or a rise towards the planning limit

The thresholds should be set from the site’s own baseline, recorded when the equipment was new or newly serviced, rather than from general figures. A trend line with the threshold drawn on it, reviewed by a named person each month, does more for reliability than a much larger number of points that nobody looks at.

Getting data out of the equipment

Critical power equipment speaks several languages. UPS units usually offer network management cards using the simple network management protocol and often Modbus; generator controllers and metering devices mostly use Modbus over a serial link or a network; protection relays may use the substation protocols, and building management systems use their own. A monitoring system has to read all of them, and each connection has its own polling rate and limits.

Two practical points matter more than the choice of protocol: confirm, for every device, exactly which values are available and at what resolution before the system is ordered, because many devices expose far less than their front panels show; and read alarms and events from the device’s own event log where possible rather than inferring them from polled values, which can miss a short event between two polls.

What the first screen should show

The overview screen is what the person on duty sees at three in the morning, and it should answer three questions at a glance: is the critical load supplied, from which source, and with how much in reserve.

That means the state of each source and transfer device shown on a simplified single-line diagram, coloured by state; the load on each UPS and generator against the capacity it must keep in reserve; the remaining battery autonomy and fuel; and a short list of active alarms in priority order. Everything else — trends, harmonic spectra, energy reports — belongs one click away. A first screen crowded with every measured value hides the one change that matters among dozens that do not.

Keeping the monitoring network from becoming a risk

A monitoring system connects to the controllers of the equipment it watches, and a network that can read a UPS can often also command it. The network design should make the monitoring system the only path in, and make that path as narrow as possible. Keep the equipment network separate from the office network, with a firewall between them that allows only the monitoring traffic that is needed.

Use read-only access wherever the device supports it, so that the monitoring system cannot switch anything. Change every default password on every network card and controller at installation. And provide remote access, if it is wanted at all, through one managed gateway with its own authentication and a record of who connected and when, never through a device exposed directly to the internet.

Proving every point before relying on it

A monitoring system is commissioned point by point, and each point is checked against an independent measurement, not against another reading from the same system. Compare each voltage, current and power value with a calibrated meter at the same moment; operate each breaker and confirm that its position and the event time arrive correctly; and trigger each alarm at its source, then confirm that it appears on the screen and reaches every person and phone it is meant to reach.

Record the result for every point in a schedule. Points that were never proved are where a system misleads its operators during the first real event — a reversed current transformer reporting export when the site is importing, or an alarm that was configured but never delivered.

Common mistakes

  • Clocks not synchronised.
  • Battery monitoring at string level only.
  • Data collected but never reviewed.
  • Monitoring network not on UPS.

What to send us

Send your single-line diagram and what you monitor today. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The example is illustrative.

Questions engineers ask

How accurate do the clocks in a power monitoring system need to be?

It depends on the purpose. About a second is enough for trends and energy reports, about 10 milliseconds for ordering alarms and transfers, and about 1 millisecond for protection sequence of events. Network time protocol on a well-managed local network meets the first two; precision time protocol or a satellite time code is needed for the third. The weakest clock decides the accuracy of the whole record, so synchronise every device that records events.

How many alarms is too many?

Guidance widely used in the process industries suggests about one alarm every ten minutes on average in steady operation, and treats more than ten alarms in ten minutes as a flood in which important alarms are missed. Keep as alarms only conditions that need someone to act, group consequential alarms behind the first cause, reserve high priority for conditions needing action within minutes, and measure the alarm rate monthly from the system log.

What should I monitor first?

Readiness of sources and transfer equipment, battery health and per-path loading. Generator in automatic mode with no alarms, fuel level, starting battery voltage, changeover position, UPS battery condition and the load on each path show whether the system can respond to the next failure, which is the purpose of monitoring.

Can SCADA control the system?

It can supervise and command, but critical control should be local so it survives SCADA failure. Automatic transfer, protection and load shedding run in local controllers that work without the network, while SCADA shows status, records events and allows supervised commands, so a SCADA failure never stops the power system from responding.

How long should data be kept?

Long enough to diagnose events and trends; follow your records policy. High-resolution event and waveform records are kept around each event, while trend data such as loads, temperatures and battery readings are kept for years, so that slow deterioration and seasonal patterns can be seen and compared.

Is remote monitoring safe?

With proper network design, authentication and segmentation, yes. Treat it as a security design task. Remote access passes through a secured gateway with individual accounts, the control network is separated from office networks, and remote commands are limited or confirmed locally, so a compromised account cannot switch critical equipment.

This guide gives general principles. Cybersecurity and network design require specialist input.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.

CallWhatsAppEnquire