Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Microgrid Critical-Power Architecture

How a microgrid supports critical power: sources, storage, controller functions, grid interface, islanding, protection and the design choices that decide resilience and cost.

In short. A microgrid combines several sources, such as mains, solar, battery storage and generators, under one controller. It can run connected to the grid or as an island. For critical power, the questions are how it moves between those modes without dropping load, which source forms the grid in an island, and how protection works when fault current changes with the sources running. The controller itself must not become a single point of failure.

Who this page is for: For owners and consultants of campuses, plants and remote sites combining solar, batteries and generators.

Key facts

  • Define every mode: grid-connected, island, and transitions between them.
  • In an island, a generator or grid-forming inverter must set voltage and frequency.
  • Solar output varies; it supports the island but normally cannot form it.
  • Fault current changes with the mix of running sources.
  • The controller needs backup, safe fallback and cyber security.
  • Test transitions on site, not only in simulation.

Worked example: a campus island day (illustrative)

TimeLoadSolarGrid formed byBattery
Late night, about 2 hours150 kW0Battery inverterDischarging about 300 kWh (60% of 500 kWh)
Rest of the night150 kW0GeneratorRecharging from the generator, which keeps the set at a healthy load
Early morning350 kW50 kWGeneratorCharging from generator
Midday500 kW220 kWGeneratorCharging from the generator, ready for the evening peak
Evening peak700 kW20 kWGeneratorShaving the peak

The sources were 300 kWp solar, 250 kW / 500 kWh battery storage and two 500 kVA sets. The generators run only when needed and at a healthy load. At the evening peak, if one set trips, the other set and the battery give about 650 kW, so some load must be shed. See load shedding. See grid-forming battery islands and islanded operation.

Do not let one controller decide everything without a fallback. If it fails, the generators and battery must still keep the critical load running on their own settings.

Design checks

AreaCheck
TransitionsGrid loss, reconnection, change of grid-forming source
ProtectionClearing in every source mix. See inverter fault current
EarthingNeutral reference in each mode. See earthing and neutral
ControllerBackup, fallback and access security

Microgrid sheet

ItemValue
Sources and ratings 
Load profile by hour 
Island duration needed 
Controller fallback 

The three layers of microgrid control

A microgrid controller is usually described as one box, but its job divides into three layers that work on very different timescales, and problems are easier to find when it is clear which layer is responsible. The fastest layer lives in each source’s own controls; the slower layers sit in the supervisory controller.

LayerTimescaleWhat it doesWhere it lives
PrimaryMilliseconds to a secondHolds voltage and frequency, shares load by droop between sourcesGenerator governors and regulators, inverter controls
SecondarySeconds to a minuteReturns frequency and voltage to nominal after the primary layer has let them droop, rebalances the sourcesSupervisory controller
TertiaryMinutes to hoursDecides which sources run, battery charging and discharging, solar limits, grid import and exportSupervisory controller, often with a schedule

The division explains a principle worth insisting on: the island must survive the loss of the supervisory controller. If it fails, the primary layer should carry on holding voltage and frequency by droop, slightly off nominal and without optimisation but stable, until the controller returns or an operator takes over. A design in which the sources stop or trip when the supervisory controller goes quiet has made the slowest, most complex part of the system a single point of failure for the fastest and most critical one.

How much solar an island can accept

On the grid, solar output that exceeds the site’s load simply flows out. In an island there is nowhere for it to go except into the battery, and a generator cannot be pushed below its own minimum load without running badly or tripping on reverse power. The solar the island can accept at any moment is therefore the load, minus the generator’s minimum loading, plus whatever the battery can absorb.

For an island load of 300 kW, a 500 kVA set rated 400 kW with a minimum loading of 30%, 120 kW, and a battery able to absorb 100 kW, the limit is 300 − 120 + 100 = 280 kW. If the solar array can produce 400 kW on a clear afternoon, 120 kW of it must be curtailed.

When the battery is full, the limit falls to 180 kW. The supervisory controller enforces this by sending the solar inverters a power limit; many inverters also reduce output on their own as the frequency rises, which gives a fast backstop if the controller is slow. Without one of these, the first sunny hour in an island ends with the generator reverse-powering and tripping, and the island collapsing.

The generator’s minimum loading deserves its own check. Below roughly a third of its rating, a diesel engine runs cool, burns its fuel incompletely and accumulates unburnt fuel and carbon in its exhaust system, the condition known as wet stacking. A microgrid that pushes its generator to very light load for hours every sunny day, to let the solar run, trades fuel saved today for engine trouble later. Set the minimum loading in the controller from the engine maker’s guidance, and treat it as a hard limit on how much solar the island accepts while that set runs.

Running enough capacity for what might happen next

An island must keep running capacity above the present load by at least the largest change it may have to absorb: the largest single load that can start, or the sudden loss of the largest running source, whichever is greater. In a microgrid, the loss of solar output when a cloud passes is often the largest event, because a large array can drop most of its output within a minute.

Consider an island carrying 300 kW, of which 150 kW comes from solar, with a generator and a battery covering the rest. If a passing cloud removes 120 kW of solar, the generator and battery must pick it up within seconds. The tertiary layer therefore keeps running reserve against the solar actually being produced, not against the load alone, and starts a further generator or holds battery charge in reserve when the solar share is high. A microgrid that sizes its reserve for loads and forgets that its largest source can dim within a minute is the one that trips on the first cloudy afternoon.

Solar inverters that are designed to switch off

Grid-connected solar inverters are required to stop exporting when the grid is lost, so that they cannot keep a disconnected network live while utility staff work on it. In a microgrid, that very behaviour would switch off the solar the moment the island forms. The design has to reconcile the two: the solar inverters must see the island’s voltage and frequency, formed by a generator or grid-forming battery, as a valid supply, while the microgrid as a whole must still disconnect cleanly from the utility and never energise its network.

In practice, the utility interface breaker and its protection take on the anti-islanding duty for the whole site, and the solar inverters’ voltage and frequency trip settings are adjusted, within what their certification allows, to ride through the transition into the island rather than tripping. Those settings, and the utility’s agreement to them, must be settled in the design. An island that forms correctly but loses all its solar for several minutes while the inverters run their reconnection timers is a common result of leaving the defaults in place.

Fault current that changes with the sources running

The fault current available in a microgrid depends on which sources are connected. On the grid it is high. In an island formed by generators it is a fraction of that, and in an island formed by a battery inverter alone it may be little more than the inverter’s rating. A breaker that clears a fault instantly on the grid may take seconds, or not trip at all, in a battery-formed island.

Each operating mode needs its own protection check, and the protection settings should change with the mode, either through settings groups switched by the controller or through protection designed to work at the lowest fault level the microgrid will see. List the modes, the sources running in each and the fault current available, and check every protective device against the worst of them.

Giving the battery one priority at a time

A microgrid battery can do many jobs, and the tertiary layer has to decide which one it is doing at any moment, because the jobs pull its state of charge in opposite directions.

DutyWhat it wants from the batteryWhen it should take priority
Island reserveCharge held high, ready for an outageAlways, down to the reserve floor; never traded away for savings
Absorbing solar in an islandRoom to charge, so charge kept below fullIn an island, around midday
Peak shaving on the gridCharge available for the daily peakOn the grid, before the expected peak
Generator supportFast power for load steps and cloud eventsWhenever a generator is running in an island

The conflicts are real: a battery kept full for reserve cannot absorb surplus solar, and a battery emptied for peak shaving leaves no reserve for an outage that evening. The rule that resolves them is a fixed order, written into the controller: reserve first, then the duties that keep the island stable, then the duties that save energy or demand. Review the order once a year against how the site actually used the battery.

Records that make the microgrid tunable

A microgrid is tuned, not just commissioned, and tuning needs data. Keep, from the first day, a record of every transition into and out of the island, every curtailment of solar, every generator start and stop called by the controller, and the frequency and voltage at the main bus through each event. After a few months these records show where the settings are too tight — generators started for clouds that passed in seconds — or too loose — frequency dips that came close to the shedding thresholds. Small adjustments made from evidence, one at a time and recorded, turn a microgrid that merely works into one that runs well.

Common mistakes

  • Solar counted as firm capacity.
  • Protection checked in grid mode only.
  • No controller fallback.
  • Transitions never tested.

What to send us

Send your sources, load profile and island needs. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Values are illustrative.

Questions engineers ask

How much solar can a microgrid island accept?

The island load, minus the generator minimum loading, plus whatever the battery can absorb at that moment. For a 300 kW load, a 400 kW set with a 30% minimum of 120 kW, and a battery able to take 100 kW, the limit is 280 kW; with the battery full it falls to 180 kW. The controller curtails the solar inverters to that limit. Without curtailment the generator is driven below its minimum or into reverse power and trips.

What happens to a microgrid if its supervisory controller fails?

In a sound design the island carries on. The controller handles the slower layers, restoring frequency and deciding which sources run, while each generator and grid-forming inverter holds voltage and frequency by droop on its own. On controller failure the island drifts slightly off nominal but stays stable until the controller returns or an operator takes over. A design in which sources trip when the controller goes quiet makes it a single point of failure.

What makes a microgrid different from a generator backup system?

It has an integrated controller, storage and often renewables, and can operate in both grid-connected and islanded modes with defined transitions. A backup generator simply takes over when the grid fails, while a microgrid manages all its sources continuously, keeping the generators efficiently loaded and switching between modes in a planned way.

Does a microgrid need a BESS?

Not always, but storage helps frequency control, seamless transitions and efficient generator loading. Without a battery, a generator or another grid-forming source must hold the frequency at all times, and transitions between modes usually involve a short break. Logged load data and the required transition quality decide whether storage is worthwhile.

How is a microgrid tested?

By testing grid loss, islanded steps, source failures, controller failure and resynchronisation. Each test follows a written procedure with expected results, is run under controlled conditions with rollback ready, and is repeated after changes to the controller, sources or settings, since a microgrid relies on its controls working exactly as designed.

Do I need utility approval?

Usually for grid-connected systems. Requirements vary by location. The utility needs assurance that the microgrid will not energise its network during an outage and will reconnect safely, so anti-islanding protection, export limits and reconnection settings are agreed in writing with the utility before commissioning and tested on site.

This guide gives general principles. Microgrid design requires site-specific engineering studies.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.