Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Static Transfer Switch Systems

How static transfer switches move critical loads between two sources within milliseconds, where they fit in A/B distribution, key ratings and the failure modes to design out.

In short. A static transfer switch (STS) uses thyristors to move a load between two sources within a few milliseconds, fast enough for single-cord equipment to keep running. It transfers cleanly only when both sources are in phase. It must refuse to transfer onto a downstream fault, and it becomes a single point of failure unless it has its own bypass.

Who this page is for: For data centre, hospital and control room engineers using static transfer switches between two UPS or power paths.

Key facts

  • Transfer time is a few milliseconds, against a fraction of a second to seconds for a mechanical changeover.
  • Both sources must be synchronised for a clean transfer.
  • Out-of-phase transfer can cause heavy inrush in downstream transformers.
  • Transfer is blocked when the fault is downstream of the switch.
  • A maintenance bypass is needed for servicing without shutdown.
  • The switch itself must be counted in the failure analysis.

Static and mechanical transfer compared

ItemStatic transfer switchAutomatic transfer switch
Switching elementThyristorsContacts
Transfer timeA few millisecondsAround 100 ms to seconds
Typical useBetween two UPS outputsBetween mains and generator
Main limitNeeds synchronised sourcesLoad sees a break

Worked example: blocked transfers (illustrative)

FindingCauseFix
Switch refused to transfer during a UPS faultThe two UPS outputs were about 40° apart; the switch’s limit was about 15°UPS systems linked so their outputs stay in phase
Earlier forced transfer tripped a downstream breakerOut-of-phase transfer drove the downstream transformer into heavy inrushPhase-angle limit kept; transformer inrush reviewed
No way to service the switch liveNo maintenance bypassBypass added with interlocks

See transfer coordination and bypass arrangements.

Do not override the switch’s phase-angle limit to force transfers. An out-of-phase transfer can trip the very loads it is meant to protect.

What to specify

  • Rating and overload capacity.
  • Transfer time and phase-angle limit.
  • Downstream fault detection and transfer blocking.
  • Maintenance bypass and interlocks.
  • Alarms and event recording.

See dual-cord loads.

Static switch check sheet

ItemValue or status
Source A and B 
Sources synchronised? 
Phase-angle limit 
Maintenance bypass 
Last transfer test 

Where the milliseconds go in a static transfer

A static transfer switch is fast because it uses thyristors rather than contacts, but its transfer is not instantaneous, and its time is the sum of distinct stages. Knowing them explains both why an STS is fast enough for most loads and why the figure in a brochure is sometimes optimistic.

StageTypical timeWhat decides it
Detecting that the preferred source has failedAbout 1 to 4 msThe detection method; fast sensing compares each sample with an ideal sine wave
Turning off the thyristors on the failed sourceUp to about 10 ms if left to commutate naturallyA thyristor stops conducting only when its current reaches zero, once each half-cycle
Turning on the thyristors on the alternate sourceUnder 1 msGate firing, once the first source is confirmed off
Total, break-before-makeAbout 4 to 12 ms, a quarter to half a cycleMostly the wait for the current zero

The middle stage is the important one. The two sources must never be connected together through the switch, so the alternate thyristors cannot be fired until the failed source’s thyristors have stopped conducting, and they stop only at a current zero. Some designs force the turn-off to shorten that wait; most rely on the natural zero and therefore transfer within about half a cycle at worst. That is comfortably inside the 20 ms that information technology equipment is generally expected to ride through, which is why an STS can switch dual-source loads without any break the load notices.

Why the phase angle limit exists

An STS checks that its two sources are close in phase before it transfers, and blocks or delays the transfer when they are not. The reason is what an out-of-phase transfer does to any transformer downstream. A transformer’s core flux follows the voltage applied to it; when the voltage suddenly jumps to a different phase angle, the flux cannot jump with it, and the core is pushed off centre by an amount that grows with the angle. The size of the jump, as a fraction of the normal peak voltage, is two times the sine of half the angle.

Phase angle between sources at transferVoltage jump, as a share of peakEffect on a downstream transformer
10°0.17Negligible
15°0.26Small; within most designs’ margin
30°0.52Noticeable flux offset; inrush possible in a transformer near saturation
60°1.00Large inrush likely, comparable to energising the transformer
180°2.00Worst case: an inrush larger than a normal switch-on

A large inrush through the STS can trip the upstream breaker on the new source, or blow the switch’s fuses, turning a transfer meant to protect the load into an outage. Most STS units therefore allow an in-phase transfer only within a set angle, commonly in the range of 15 to 30 degrees, and either block or delay a transfer outside it. The setting is a trade between protecting downstream transformers and transferring when it is needed, and it should be chosen knowing what the STS feeds.

Before or after the transformer

Where the load is fed through a transformer — a power distribution unit with an isolation transformer, or a step-down to a different voltage — the STS can sit on either side of it. Upstream of the transformer, one STS and one transformer serve the load, but every transfer energises the transformer through the switch, and every out-of-phase transfer risks the inrush described above. Downstream, with a transformer on each source and the STS on the secondary side, the transformers stay energised all the time and the switch transfers between two already-magnetised supplies, which avoids the inrush problem entirely at the cost of a second transformer.

The downstream arrangement is generally the more robust where sources may be out of phase, such as two independent UPS systems without synchronisation between them. Where the sources are kept synchronised and the phase angle is reliably small, the upstream arrangement is simpler and saves space. The choice should be made at the design stage, because moving an STS from one side of a transformer to the other later means rebuilding the distribution.

Keeping two UPS sources in step

An STS fed by two independent UPS systems will find them drifting apart in phase, because each inverter runs on its own clock unless it is told otherwise. Over time the angle between them wanders through the whole cycle, and the STS is blocked whenever the angle is outside its limit — which may be exactly when it is needed.

The remedy is a synchronisation arrangement that keeps both UPS outputs locked to a common reference: usually the mains bypass when it is present, and one UPS designated as the reference when it is not. With synchronisation in place, the angle between sources stays within a few degrees and the STS can transfer at any time. Check that the arrangement still works when the reference UPS is itself on bypass or in maintenance, because that is the condition in which it is most often found wanting.

Overload and fault ratings of the switch

A thyristor has very little thermal mass, so an STS handles overload and fault current very differently from a mechanical switch of the same continuous rating. Its overload capability is stated as a set of currents and times, and its ability to survive a fault is stated as an I²t figure, the energy the thyristors can take before damage. Both must be checked against the upstream protection on each source: the upstream breaker or fuse has to clear a fault downstream of the STS before the thyristors’ I²t is exceeded, on whichever source is connected at the time.

Some designs fit fast fuses in series with the thyristors to protect them. The fuses do protect the switch, but they add a part that can fail and, if a fuse opens, they remove that source from the load without warning. Others omit the fuses and rely on coordination with upstream protection, which demands careful study of both sources. Either can be right; the decision should be explicit, written on the drawings with the coordination study that supports it, and not left to the supplier’s default.

Three-pole or four-pole

Whether the STS switches the neutral depends on how the two sources are earthed. If both sources share one neutral-to-earth bond, a three-pole switch that leaves the neutral permanently connected is normal. If each source has its own bond — two separate transformers, or two UPS systems each creating its own neutral — a three-pole switch connects the two neutrals together permanently, and neutral current then divides between the neutral conductors and the earth conductors, upsetting earth-fault protection and introducing noise into the earth. A four-pole STS, which switches the neutral with the phases, keeps each source’s neutral with its own phases. Settle the earthing of both sources first, and choose the number of poles from it.

How the switch itself fails, and how that is caught

The thyristors are the heart of the STS and also its main failure point. A thyristor that fails short-circuited is the dangerous case: on the side that is not supposed to be conducting, it creates a path between the two sources the moment the other side fires, connecting them together out of phase. Good designs monitor every thyristor continuously for conduction when it should be off, block transfers towards a source whose switch has failed, and raise an alarm. A thyristor that fails open simply removes one source from service, which is less dramatic but leaves the load with no alternate path.

Two features make these failures survivable. A maintenance bypass, with interlocks, lets the load be fed directly from either source while the switch is repaired. And the alarms from the STS must reach someone, because a switch with a failed thyristor on its alternate side looks normal from outside while it quietly offers no protection at all. Read the switch’s event log at each service visit, and test a transfer each way under load at least once a year.

Common mistakes

  • Unsynchronised sources.
  • No maintenance bypass.
  • Switch left out of the failure analysis.
  • Transfers never tested on load.

What to send us

Send the single-line diagram and switch details. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The example is illustrative.

Questions engineers ask

How fast does a static transfer switch transfer?

Typically within about 4 to 12 milliseconds, a quarter to half a cycle. Detection takes about 1 to 4 milliseconds, and the thyristors on the failed source stop conducting only at the next current zero, which can take up to about 10 milliseconds. The alternate source is then switched on in under a millisecond. That is well inside the 20 milliseconds most information technology equipment is expected to ride through.

Should a static transfer switch be three-pole or four-pole?

It depends on how the two sources are earthed. If both share one neutral-to-earth bond, a three-pole switch is normal. If each source has its own bond, such as two separate transformers or two UPS systems each creating a neutral, a three-pole switch ties the neutrals together and neutral current flows in the earth conductors. A four-pole switch keeps each neutral with its own source. Decide the earthing first, then the number of poles.

Is an STS a single point of failure?

It can be. Design with a maintenance bypass and consider redundant STS units for the most critical loads. Monitoring of its alarms, regular thermographic checks and a tested bypass procedure reduce the risk further, so the STS can be serviced without the load losing supply.

Why must the two sources be synchronised?

If they are out of phase, a transfer can cause current surges and a voltage disturbance. The STS checks the phase angle between the sources and transfers instantly only within a set limit; outside it the transfer is delayed or blocked. UPS units feeding both sides are synchronised to a common reference to keep them in phase.

Can an STS replace an ATS?

No. An STS suits clean, synchronised sources, while an ATS typically moves between utility and generator. The ATS includes a break while the generator starts and the sources are not synchronised, and it handles the higher fault levels and motor loads of a whole building, so the two devices serve different points in the system.

What happens if the load has a fault when the STS transfers?

It may transfer the fault to the alternate source. Downstream protection must clear it quickly and selectively. Many STS designs block transfer when they detect a downstream fault current, so the fault is not passed to the healthy source. The protection study confirms this setting and the downstream breaker clearing times.

This guide gives general principles. Ratings and settings should be taken from manufacturer data and a protection study.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.