In short. A dual-cord device has two power supplies fed from separate A and B paths, so it keeps running if one path fails. That works only if each power supply can carry the whole device alone, and if each path is loaded so that it can take the other side’s load. Single-cord devices need a small automatic transfer switch, or they stay exposed to one path failing.
Who this page is for: For data room, telecom and control room managers who want A and B power to give real redundancy.
Key facts
- Each power supply in a dual-cord device must carry the full device load.
- Each A or B path should normally run below about 40% of its rating.
- On failover, the surviving path then stays below about 80%.
- A and B cords must go to genuinely different paths, not one board.
- Single-cord devices need a rack transfer switch fed from A and B.
- Prove redundancy by switching off one path under load.
Worked example: a rack on two 32 A feeds (A and B) at 230 V, unity power factor (illustrative)
| Case | Rack load | Each side normally | Surviving side after a failure |
|---|---|---|---|
| Rack at 9 kW | about 39 A | about 20 A | 39 A on a 32 A feed: about 122%, overloaded and will trip |
| Rack limited to about 5.9 kW | about 26 A | about 13 A (40%) | 26 A: about 80% of 32 A, holds |
Both cases looked healthy every day, because each side carried only half the load. The first would have tripped on the first real failure. The site set a 40% limit per side and added monitoring with alarms. See critical-power bus arrangements.
Do not judge A and B loading by each side’s normal current. After a failure, one side carries both halves. Check every feed against the combined load.
Dual-cord and single-cord compared
| Item | Dual-cord | Single-cord |
|---|---|---|
| Survives loss of one path | Yes, if loading and power supplies allow | Only with a rack transfer switch |
| Weak point | Both cords on the same path | The transfer switch itself |
| Check | Each power supply rated for full load | Transfer fast enough for the device |
A rack transfer switch must change over faster than the device’s power supply can ride through, usually within about 10–20 milliseconds. See static transfer switches.
A and B check sheet
Five racks on 32 A A and B feeds at 230 V. Two tests have to pass: each path under about 40% of its rating in normal running — 12.8 A here — and the surviving path under about 80% after the other fails, which is 25.6 A. The fourth column applies the second test.
| Rack or device | A load, A | B load, A | Combined vs feed rating | Cords on different paths? |
|---|---|---|---|---|
| Rack 1, dual-cord servers | 11.2 | 10.8 | 22.0 A, 69% of 32 A after failover | Yes — A from UPS 1, B from UPS 2 |
| Rack 2, dual-cord servers | 12.4 | 12.1 | 24.5 A, 77% after failover | Yes |
| Rack 3, dual-cord servers | 14.6 | 14.2 | 28.8 A, 90% after failover | Yes — but see below |
| Rack 4, single-cord switches on a rack transfer switch | 8.3 | 0, standby | 8.3 A, 26% | Yes — the transfer switch is fed from A and B |
| Rack 5, single-cord monitoring appliance | 6.1 | — | 6.1 A, 19% | No — one path only |
Rack 3 is the one to deal with, and notice that it looks healthy. Both cords are connected, both go to genuinely separate paths, and 14.6 A on a 32 A feed is 46% — only a little above the 40% guideline. Lose path B and the whole 28.8 A lands on path A: 90% of a 32 A feed, which is a breaker running at the edge of its thermal setting and a cord assembly running hot, for however long the repair takes. The redundancy is nominally present and would not survive being used.
The 40% guideline exists for exactly this reason. It is not a comfort margin on the normal state; it is the number that makes the failover state survivable, because after failover each path carries both halves.
Rack 5 is the honest single point of failure, and the right response is usually not to fix it. A monitoring appliance whose loss costs nothing is a reasonable thing to leave on one path — provided it is written down as an accepted risk in the register rather than discovered during an outage. Rack 4 shows the alternative where the function does matter: a single-cord device behind a rack transfer switch fed from both paths, which is how network switches and appliances with one power supply are properly handled.
Equipment with more than two power supplies
Large servers, blade chassis and storage arrays often have three, four or more power supplies, arranged so that the equipment runs on fewer than all of them. How those supplies are spread between the A and B sides decides whether the equipment survives the loss of a side.
| Arrangement | Supplies needed to run | Split between A and B | Survives the loss of one side? |
|---|---|---|---|
| 2 supplies, 1+1 | 1 | 1 on A, 1 on B | Yes |
| 4 supplies, 2+2 | 2 | 2 on A, 2 on B | Yes |
| 4 supplies, 3+1 | 3 | 2 on A, 2 on B | No: only 2 remain |
| 6 supplies, 3+3 | 3 | 3 on A, 3 on B | Yes |
The third row is the trap. Equipment configured for N+1 supplies, designed to tolerate the failure of one supply, cannot tolerate the loss of a whole side, because half of its supplies go at once. For A and B operation the equipment must be configured so that either side alone carries enough supplies to run it, which usually means a 2+2 or 3+3 arrangement and sometimes means setting the equipment’s power policy to allow full operation on half its supplies. Check the policy in the equipment’s own management settings, not just the number of cords.
Connectors, ratings and cords that stay in
The cord and connector between the distribution strip and the equipment are part of the power path, and they have ratings of their own. The common equipment inlets in critical rooms are rated around 10 A for the smaller type and 16 A for the larger, and a cord feeding a large server after a side has failed may carry close to its rating. Choose cords and strip outlets of the rating the equipment needs on one side alone, not on half its normal load.
Cords also come out. A cord pulled half out by a cable being moved behind a rack, or by the weight of other cords, can leave equipment silently on one supply until the other side is maintained. Locking cords or retention clips, cable management that keeps weight off the connectors, and the per-cord monitoring that shows any cord at zero current, together keep both cords genuinely in service.
Rack-mounted transfer switches for single-corded equipment
Single-corded equipment on an A and B system is usually given its second path by a small rack-mounted transfer switch fed from both sides. These differ from large static transfer switches in an important way: many use relays rather than semiconductors, and transfer in around 8 to 16 ms. That is within the hold-up time of most computer power supplies but close to its edge, and some equipment with small supplies, or older supplies, may not ride through it.
Check the equipment’s hold-up time against the switch’s transfer time, and test the combination by switching off the preferred side with the equipment running. Remember too that the switch is itself a single point of failure for everything plugged into it, so keep the number of critical items on any one switch small, and its model and position in the A and B audit.
Where many single-corded items share a rack, consider whether they can be replaced over time with dual-corded models, or grouped so that each rack switch serves only equipment that can tolerate the same short transfer. An inventory of single-corded critical equipment, reviewed whenever equipment is replaced, keeps the number of rack switches, and the single points they create, as small as the site allows.
Common mistakes
- Both cords in the same power strip.
- Per-side loading above 50%.
- Single-cord devices ignored.
- Failover never tested.
What to send us
Send rack loads and A and B feed ratings. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Values are illustrative.
What “different paths” has to mean
The last column of the sheet above is answered “yes” far more often than it is true. A and B cords prove nothing by being two cords; they only help if the two paths share nothing that can fail. Tracing them properly means following both back to the source and listing everything they have in common.
The ways this fails on real installations, roughly in order of how often we find them:
- Both cords land on the same board. Different breakers, adjacent positions, one busbar. A board fault, a busbar fault or an incomer failure takes both. This is the commonest, because it is the easiest thing to do when a rack is added after the room was built.
- Two boards, one UPS. The paths separate at distribution and converge at the source. Fine against a breaker failure, useless against a UPS failure or a battery that has lost capacity.
- Two UPSs, one bypass. A shared maintenance bypass or a shared static switch is a shared element in both paths, and it is an active component.
- Two paths, one cable route. Separate boards, separate sources, and both cables in the same trench or the same tray. A mechanical event takes both, and so does a fire. This one survives every electrical test and fails the only test that matters.
- Two paths, one controller. Static transfer switches, rack transfer switches and paralleling controls are active devices, and a shared one is a single point of failure with a processor in it.
The test that settles all five, and the only one worth relying on: switch off one path at the source, under real load, and watch. Not a simulation, not a review of drawings — an actual interruption of path A during a quiet window, with somebody watching the critical load and somebody at the panel. Everything in the list above shows up within seconds, and nothing else reliably finds any of it.
Do it on commissioning, after every change to the distribution, and at an agreed interval thereafter. A dual-cord installation that has never had one path switched off is a dual-cord installation on paper.
Questions engineers ask
Does equipment with four power supplies survive the loss of one side?
Only if either side alone carries enough supplies to run it. With four supplies configured 2+2, two on each side, it survives. With four supplies configured 3+1, needing three to run, losing a side leaves only two and the equipment stops, even though it tolerates the failure of any single supply. Configure the equipment power policy so that half its supplies can run it fully, and check that policy in its management settings.
How fast does a rack-mounted transfer switch transfer?
Many relay-based rack transfer switches transfer in around 8 to 16 milliseconds, within the hold-up time of most computer power supplies but close to its edge. Some equipment with small or older supplies may not ride through. Check the equipment hold-up time against the switch transfer time and test the combination by switching off the preferred side with the equipment running. Keep the number of critical items on any one switch small.
Do I need an STS for single-corded loads?
Only if the load needs more resilience than one path gives. The STS gives the load two sources but adds its own failure point. A rack-mounted automatic transfer switch is a smaller alternative for a few single-corded devices, and the choice between them follows the criticality of the load and the transfer speed it can tolerate.
How fast does an STS transfer?
Usually within a few milliseconds, fast enough for most electronic equipment. Check the equipment’s hold-up time. Transfer speed also depends on the two sources being synchronised, since an out-of-phase transfer may be delayed or disturb the load, so the phase angle limit is checked at commissioning.
How do I find wiring errors?
Label cords and test by switching each path off in turn while watching all devices. A dual-corded device that goes dark when one path is switched off has both cords on the same path, or a failed power supply. Record each result and repeat the test after any rack or cabling change, because errors creep in during moves.
Why is load sharing between supplies important?
If one supply carries most of the load, failover doubles its current and may overload it. Each path is kept below half its rating in normal operation, so that it can carry the whole load when the other fails. Branch circuit monitoring shows the current on each path and warns before this margin is lost.
This guide gives general principles. Confirm equipment specifications from manufacturers.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.