Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Critical-Power Protection and Selectivity

How protection is designed for critical power so a fault clears locally: selectivity, generator and transformer protection, changing fault levels and the common ways protection causes outages.

In short. In a critical-power system, a fault must clear at the lowest possible level, and the rest of the system must stay on. That is selectivity, and it is harder here than in a simple plant because the source keeps changing: utility, generator, UPS inverter, UPS bypass, or ties closed. Fault current can differ by a factor of a hundred between these states, so settings that are selective in one state can be slow, or not selective at all, in another. Selectivity has to be designed and checked for every source state.

Who this page is for: For protection engineers and consultants coordinating protection in data centres, hospitals and other critical facilities with several source states.

Key facts

  • List every source state and calculate fault levels in each before setting anything.
  • Generator fault current is lower and decays; check pickup on the decayed value.
  • UPS inverters supply only a small multiple of rated current, briefly.
  • On static bypass, the downstream fault level rises to nearly the upstream source’s level.
  • Setting groups switched by source state solve many conflicts.
  • A study is valid only until the next change of source, load or setting.

Fault current by source state

Source stateTypical fault current at a main board (illustrative)Main protection concern
Utility through a 1000 kVA, 5% transformerAbout 28 kAEquipment ratings, arc energy
750 kVA generator aloneAbout 8.7 kA at first, decaying to about 3 kA with PMG or auxiliary-winding support, and far lower without itSlow clearing, loss of selectivity
100 kVA UPS on inverterA few hundred amps, for a short timeDevices may not trip magnetically
Same UPS on static bypass from the utilityAs the upstream sourceDownstream devices no longer selective
Ties closed, sources paralleledHighestBreaker ratings and selectivity

See maximum and minimum fault-current studies.

Worked example: one feeder, four source states (illustrative)

A 250 A feeder breaker below a 1600 A main board has its instantaneous element at 10 × In = 2500 A. The main incomer waits 0.3 s on its short-time element.

Source stateFault current at the feederFeeder clearsSelective?
UtilityAbout 20 kAInstantaneouslyYes
Generator, first cyclesAbout 6 kA, decayingInstantaneouslyYes
Generator, remote fault on a long cableAbout 2 kA sustainedOnly on the long-time curve, after secondsAt risk: the generator’s own overcurrent may trip first
Same fault with a generator setting group (feeder short-time at 1500 A, 0.1 s)About 2 kAIn about 0.1 sYes

A second setting group, selected automatically when the generator is the source, restores selectivity without weakening grid-mode protection. The same exercise is repeated for the UPS output, where the bypass state, not the inverter state, usually decides the downstream device ratings. See critical-power protection architecture.

Do not set critical-power protection for the utility state only. Check every state the system can be in, including generator, UPS bypass and closed ties, or the first fault in an unusual state may take down far more than it should.

Selectivity methods

  • Time grading: downstream devices faster than upstream ones.
  • Current grading: where fault current changes along the circuit.
  • Zone selective interlocking: the nearest breaker trips fast; upstream breakers wait only if a downstream one sees the fault.
  • Differential protection: unit protection for generators, transformers and buses.
  • Directional protection: where power can flow both ways.

See coordination and selectivity.

Generator protection specifics

A generator may use voltage-restrained or voltage-controlled overcurrent, reverse power, loss of excitation and voltage and frequency elements. Excitation support (PMG or auxiliary winding) lets it hold fault current long enough for downstream devices to clear. See generator protection relays.

Protection that causes outages

  • Settings that trip on motor starts or transformer inrush.
  • An incomer that trips for a feeder fault.
  • Settings right for the utility and wrong for the generator.
  • A relay disabled during testing and not restored.
  • One trip supply for main and backup protection.

Verification

Run a coordination study for every source state, apply the settings and setting-group logic, and prove them by injection testing. Review after any change. See injection testing and TCC engineering.

Source-state selectivity matrix

The matrix for the same 800 kW semiconductor plant: a 2500 A main board, 400 A feeders and a 2N UPS pair of 500 kVA systems. It is a larger installation than the single 250 A feeder traced through four states in the example above, and the matrix does the opposite job to that trace — instead of following one feeder through every state, it asks every device pair the same question in every state at once, which is how the one pair that fails gets found. Generator full load current is 1391 A per set; UPS full load current is 696 A per system.

Device pairUtilityGeneratorUPS inverterUPS bypassTies closed
2500 A main incomer above 400 A feederYes. About 31 kA; feeder instantaneous at 4000 A clears at once, incomer short-time waits 0.3 sAt risk on one set. Two sets give about 16.7 kA falling to 8.3 kA, which is fine; one set gives 8.3 kA falling to 4.2 kA, and a remote fault sits near 2 kA, below the 4000 A instantaneousn/a — this pair is upstream of the UPSn/a — upstream of the UPSYes, and more comfortably: the feeder can be fed from either incomer and the fault current rises
400 A feeder above 125 A sub-board incomerYes. About 29 kA at the sub-board; 125 A instantaneous at 1250 A, feeder short-time 0.1 sYes for a fault at the sub-board, about 4 kA on one set. At risk for a remote fault down a long sub-circuit near 900 A, which only the long-time curve seesn/a — both devices sit on the essential board, upstream of the UPSn/a — upstream of the UPSYes
1600 A generator breaker against 2500 A essential incomern/a — the generator breaker is open on mainsYes, but only once the generator overcurrent element is checked against the decayed 4.2 kA and not the first-cycle figure. Set above 1391 A with enough delay to let the incomer short-time act firstn/a — this pair is on the source side of the UPS and takes no part once the inverter is feedingn/a — source side of the UPSYes on settings. Check the incomer’s withstand rating too: with both sets closed the board sees about 16.7 kA
800 A UPS output breaker above 400 A distribution unit incomern/a — the UPS output is fed by its inverter or its bypass, never by the utility directlyn/a — the set feeds the UPS input, never its outputNo. The worst cell on this sheet. The inverter gives about 1.4 kA briefly, so the unit’s 4000 A instantaneous never picks up and only the 800 A long-time curve operates, in secondsYes. On bypass the fault level rises to nearly the upstream figure — about 31 kA on mains, 8.3 kA on one setn/a — the A and B paths are never tied together
400 A distribution unit above 63 A rack feedern/a — both devices are downstream of the UPS outputn/a — downstream of the UPS outputYes. About 1.4 kA from the inverter is above the 63 A device’s 630 A instantaneousYesn/a — the A and B paths are never tied together
2500 A tie Q7 against 400 A feederYesYes with setting group 2 loadedn/a — Q7 ties the two essential boards, upstream of both UPS systemsn/a — upstream of both UPS systemsShould never occur in service. Q7 is padlocked open; closed, the A and B boards share a source and independence has already gone, whatever the settings do
      
      

Laid out this way the sheet answers in two readings. Read across a row and you get one device pair’s weakest state. Read down a column and you get the state that gives the most trouble — and here it is not the utility column, where everything passes because 31 kA makes every instantaneous element work, but the two columns where the fault current is smallest. That is the general result worth carrying away: a study done only at the utility fault level proves the easiest case and misses every real problem.

Row one has the ordinary answer and row four has the interesting one. The feeder on a single generator is a settings problem, and settings fix it: a second group, selected automatically by source state, drops the feeder short-time to 1600 A at 0.1 s so a 2 kA remote fault is cleared by the feeder in about a tenth of a second with the incomer untouched. That was proved on this plant by primary injection at 2 kA rather than by a curve on a screen, and the result was filed against the commissioning finding that raised it.

The UPS output against the distribution unit cannot be fixed that way, and it is worth being plain about why. On inverter the UPS can deliver roughly twice its 696 A, so about 1.4 kA, for a short time — and a 400 A device’s instantaneous element is set near 4000 A because it has to ride through the inrush of what it feeds. No pair of settings reconciles those two numbers, because the available current is below the pickup the downstream device needs.

Three things do help, and none of them is a setting: a current-limiting fuse or an energy-based device at the unit incomer, which clears on let-through energy rather than on a current threshold; keeping the fault out of that zone in the first place with properly supported busbar connections and a short, mechanically protected run; and, honestly recorded, accepting that a fault at a unit incomer takes that path — which on a 2N plant the other path survives, by design. Writing that acceptance into the study is better engineering than a setting that pretends otherwise.

Two last notes on keeping the matrix true. Every “n/a” needs its reason in the cell, as above, because an unexplained blank is indistinguishable from a cell nobody checked. And the whole sheet carries a date and a source-state list: it is valid until the next change of source, load or setting, and on this plant the addition of generator 2 invalidated the previous study entirely — the fault level in the generator column roughly doubled, and every row had to be asked again.

Keeping the settings under change control

Selectivity proved by a study and a test lasts only as long as the settings stay as they were proved. Settings change for many reasons: a relay is replaced and set from a default, a technician adjusts a trip unit to stop a nuisance trip, a controller update resets a parameter. Each change can quietly undo the coordination.

A simple change-control rule protects it: no protection setting is changed without a written request stating the reason, a check against the coordination study, and an approval by the person responsible for protection; the new setting is recorded in the settings register with the date and the name of the person who made it; and the register is compared with the actual settings, read from every device, at each annual review.

Common mistakes

  • Protection set for one source state only.
  • Ignoring generator decrement.
  • Forgetting the UPS bypass state.
  • Settings changed and not documented.

What to send us

Send the single-line diagram, relay and breaker data, and the source states your system can operate in. WhatsApp 98852 01608 or use the enquiry form. See also the protection study selector.

Evidence note. Fault currents and settings are illustrative; a coordination study with the actual equipment governs.

Questions engineers ask

Who should approve a change to a protection setting?

The person responsible for protection on the site, after a written request stating the reason has been checked against the coordination study. A relay set from a default after replacement, a trip unit adjusted to stop a nuisance trip, or a parameter reset by a controller update can each undo proved selectivity. Record every approved change in the settings register with the date and the name of the person who made it.

What is a protection settings register?

A record of the approved setting of every protection device on the site, with the date and author of each change and a reference to the coordination study that supports it. Once a year, read the actual settings from every relay and trip unit and compare them with the register. Any difference is either an unrecorded change to investigate or a register error to correct, and either way it is found before a fault finds it.

Why does protection fail to trip on generator supply?

Generator fault current is lower and decays, so settings based on utility levels may not pick up. A generator may supply three times its rated current for a few seconds and then much less, so instantaneous and short-time settings chosen for the grid can miss a fault on generator supply. The study checks both sources and adds suitable settings.

What is selectivity?

Only the protective device nearest the fault trips, leaving the rest of the system supplied. It is achieved by grading the time and current settings of devices in series, or by zone-selective interlocking, and it is checked in a coordination study across the full range of fault currents for every source state.

Do I need a coordination study?

For critical systems, yes, covering each source state and tie configuration. The study shows the time-current curves of devices in series for utility supply, generator supply and any tie or parallel state, the fault levels in each, and the settings that achieve selectivity, so the settings applied on site are documented and repeatable.

How often should settings be reviewed?

After any change in sources, loads or equipment, and on a periodic schedule. A new generator, a larger transformer, a changed cable or a replaced breaker can upset grading that once worked, so settings are checked against the study whenever these change, and the settings applied in each relay are compared with the record.

This guide gives general principles. Settings must come from a coordination study.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.