In short. A grid-following battery inverter needs an existing voltage to follow. A grid-forming inverter creates the voltage and frequency itself, so it can run an island with the generator stopped. In a hybrid island, control passes between the battery and the generator as conditions change. The design must check motor starting against the inverter’s short overload rating, and protection against its limited fault current.
Who this page is for: For owners and consultants planning battery-backed islands with generators, at remote sites, plants and campuses.
Key facts
- Only a grid-forming inverter can run an island alone.
- Its short-time overload limits motor starting.
- Its fault current is limited, often to about one to two times rating.
- Protection must clear faults within that limited current.
- Hand-over between battery and generator control must be smooth.
- Keep a battery reserve for emergencies.
Worked example: a 300 kVA grid-forming inverter (illustrative)
| Check | Working | Result |
|---|---|---|
| 55 kW pump, direct-on-line start | About 68 kVA running × about 6 | about 400 kVA at start |
| Inverter short-time overload, 150% | 300 × 1.5 | 450 kVA: only about 50 kVA left for all other loads during the start, so a direct-on-line start is not advised |
| With a soft starter, about 3 times | 68 × 3 | about 200 kVA: comfortable |
| Fault current on a feeder | About 1.5 times rating | Feeder breakers set to trip within it |
See inverter fault current and motor starting studies.
Do not assume a battery inverter can start the same motors as a generator of similar rating. Check each large motor against the inverter’s short-time overload.
Typical island modes
| Mode | Forms the grid | When |
|---|---|---|
| Battery only | Inverter | Light load; battery charged |
| Generator with battery support | Generator | Heavy load or battery low |
| Generator only | Generator | Battery out of service |
See hybrid systems, battery storage and battery energy storage.
Island inverter sheet
| Item | Value |
|---|---|
| Inverter rating and overload | |
| Largest motor and starting method | |
| Inverter fault current | |
| Emergency reserve |
Grid-forming and grid-following: the difference that decides an island
Most battery and solar inverters are grid-following. They measure the voltage and frequency of a supply that already exists, lock on to it with a phase-locked loop, and inject current into it. Take the supply away and they have nothing to follow, so they stop, as they are designed to. A grid-forming inverter works the other way round: it creates the voltage and frequency itself, behaving like a voltage source, and the loads and any following inverters connect to what it makes. Only a grid-forming source can start and hold an island on its own.
| Behaviour | Grid-following inverter | Grid-forming inverter |
|---|---|---|
| Needs an existing supply | Yes; it follows it | No; it makes it |
| Response to a load step | Holds its set current; the step falls on other sources | Supplies the step at once, as a generator would |
| On loss of the main supply | Trips, by design | Carries on, holding voltage and frequency |
| Sharing with a generator | Follows the generator’s frequency | Shares load by droop, like a second generator |
| Typical use | Solar, peak shaving on a strong supply | Islanded sites, microgrids, generator support |
Many products can operate in either mode, switched by settings, and some switch automatically between them when the grid is lost. The question to put to any supplier is not whether the product is “grid-forming capable” but how it behaves at the instant the main supply disappears with the battery exporting, and how long it takes to settle into the island — and to ask for a test record that shows it.
Sharing load with a generator by droop
When a grid-forming inverter and a generator run together in an island, they share load the way two generators do: each lets its frequency fall slightly as its output rises, and the two settle at a common frequency where their outputs add up to the load. Each source’s share of any change is proportional to its rating divided by its droop. A source with a smaller droop, or a larger rating, takes more of every step.
Take a battery inverter of 250 kW set at 2% droop beside a 400 kW generator at 4%. Their weights are 250 ÷ 2 = 125 and 400 ÷ 4 = 100, so the battery takes about 55.6% of any load change and the generator about 44.4%. A 100 kW step then lands as about 55.6 kW on the battery and 44.4 kW on the generator, and the island frequency settles about 0.22 Hz lower. Both sources agree on that figure, which is the check that the arithmetic is right.
The settings are a design choice, not a default. Setting the battery’s droop smaller makes it take the fast changes and spare the engine, which is usually the point of having it; but the battery then also carries more of a sustained increase, and its state of charge falls faster. Many systems use a supervisory controller to return the battery to a planned output after each step, so that it absorbs the transient and the generator picks up the steady load over the following seconds. Write down which behaviour is intended, and test it with a real load step.
Synthetic inertia and the rate of change of frequency
The spinning mass of a generator resists sudden changes of speed, and that resistance sets how fast the frequency falls when a load is applied. The initial rate of change is about the step, as a share of the rating, multiplied by 50 Hz and divided by twice the inertia constant H. A small diesel set has an H of the order of one second, so a step of 30% of its rating starts the frequency falling at about 7.5 Hz per second — fast enough to trip rate-of-change relays and sensitive drives before the governor has acted.
A grid-forming inverter has no spinning mass but can imitate one, responding to the rate of change itself. Configured to add the equivalent of a further three seconds of inertia on the same base, giving four in total, the same step starts the frequency falling at about 1.9 Hz per second, a quarter of the rate. That is often the most valuable thing a battery does in a generator-backed island: it buys the engine the time its governor needs. The inertia setting uses battery power in short bursts, so it costs very little energy, but it does need the inverter’s overload capacity to be available at the moment of the step.
Energising the island gently
A generator brings a dead system up by closing its breaker onto it at full voltage, and every transformer on the system draws its magnetising inrush at once. A grid-forming inverter can do something no generator can: start the island at zero voltage and ramp it up over a few seconds. The transformers magnetise gradually with the voltage, the inrush all but disappears, and motors with their contactors closed start softly with the ramp.
That makes the battery the natural black-start source for an island with several transformers, even where the generator carries the long-term load. The usual sequence is for the battery to energise the system by ramp, the generator to synchronise to the island the battery has made, and the load to be restored in steps once both are running. The ramp time and the order of closing breakers belong in the restoration procedure, and the battery must hold enough charge in reserve to carry out a black start whenever it may be needed, which is a reason to set a floor on its state of charge in normal operation.
How much charge to keep in reserve
A battery used every day for peak shaving or fuel saving will be found at whatever state of charge the last cycle left it in, unless a reserve is set. For an island site, that reserve is the energy needed to survive the worst credible event: an outage at the moment the generator fails to start, carried for long enough to start it by hand or shut down in an orderly way.
For an island load of 120 kW and a 30-minute reserve, that is 60 kWh, or 12% of a 500 kWh battery, added above the battery management system’s own minimum — about 5%, or 25 kWh, on a typical system. The daily cycling then works only in the band above that floor. The floor should be written into the controller settings, tested by forcing an island at the floor, and reviewed whenever the critical load grows.
Single-phase loads and the neutral
Many battery inverters are three-wire devices, with no neutral of their own. On a grid-connected site the neutral comes from the transformer, but in an island the grid-forming source must provide it. Without a neutral, single-phase loads cannot be served at all; with a neutral provided through an earthing or isolation transformer, the inverter must also be able to supply unbalanced currents, which places a limit on how unequal the phase loads may be. Ask for the inverter’s unbalanced-load capability, as a share of rated current per phase, and check it against the island’s actual single-phase load, phase by phase, before the first island test rather than during it.
The four tests that prove an island
An island scheme that has never been tested is a design, not a capability. Four tests, each recorded with an instrument rather than watched on a display, show whether it works.
| Test | How it is done | What to record |
|---|---|---|
| Loss of grid while exporting | Open the incomer with the battery supplying part of the load | Voltage and frequency at the critical board through the transition, and whether any load dropped |
| Load step in the island | Switch on the largest single load the island will meet | Frequency dip, rate of change, and the share taken by each source |
| Black start by ramp | Energise the dead island from the battery alone | Ramp time, inrush currents, and the voltage at the farthest transformer |
| Return to grid | Restore the incomer and resynchronise | Phase angle and frequency at the moment of closing, and any power swing |
Repeat the second and fourth tests after any change to the controller settings or the island’s load, because both depend on figures that drift as a site grows.
Common mistakes
- Grid-following inverter for island duty.
- Motors started without checking overload.
- Protection based on generator fault current.
- No battery reserve.
What to send us
Send your loads, motors and inverter details. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Values are illustrative.
Questions engineers ask
How do a battery and a generator share load in an island?
By droop, like two generators. Each lets its frequency fall slightly as its output rises, and each takes a share of any change in proportion to its rating divided by its droop. A 250 kW battery at 2% droop beside a 400 kW generator at 4% takes about 55.6% of a load step, and a 100 kW step lowers the island frequency by about 0.22 hertz. A supervisory controller often returns the battery to a planned output afterwards so the generator carries the steady load.
How much battery charge should be kept in reserve for islanding?
Enough to survive the worst credible event, usually an outage when the generator fails to start, for long enough to start it by hand or shut down in order. For a 120 kW island load and 30 minutes, that is 60 kWh, or 12% of a 500 kWh battery, above the battery management minimum of about 5%. Daily cycling then works only above that floor. Write the floor into the controller and test an island starting from it.
Can any BESS do grid-forming?
No. It needs inverters with grid-forming control capability. Confirm with the manufacturer. Most BESS inverters are grid-following, meaning they need an existing voltage and frequency to follow. Grid-forming capability, its current limits and its behaviour during faults and transfers are stated in writing by the maker and proved in commissioning tests.
Is grid-forming always better?
It is needed for islanding and black start; otherwise grid-following can suffice. Choose by the use case. A BESS used only for peak shaving or tariff management while the grid is present can be grid-following, while one that must hold an island together or restart a dead site needs grid-forming control.
How does a BESS handle a motor start?
Within its current limit. Large DOL starts may exceed it, so soft starters or generator support may be needed. Inverters cannot supply the several times rated current a direct-on-line start draws, so the voltage collapses or the inverter trips. A motor start study compares each starting current with the BESS limit before motors are placed on battery-only supply.
What about two grid-forming sources?
They need a coordination scheme, such as droop, so they share load without conflict. Droop settings make each source reduce frequency or voltage slightly as its load rises, so the sources share load in proportion to their ratings without communication, while a supervisory controller can add finer sharing and restore nominal frequency.
This guide gives general principles. Inverter capabilities vary by manufacturer; confirm with data sheets.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.