In short. A failure mode and effects analysis (FMEA) lists how each part of the power system can fail, what that failure does to the critical load, and how quickly it would be noticed. Each risk is scored, and the highest risks get actions. In critical power, the most useful results usually come from hidden failures, such as a flat starting battery or a breaker left open after maintenance. Scenarios that combine failures add what a part-by-part list misses.
Who this page is for: For facility managers, consultants and reliability engineers reviewing critical power systems for weak points.
Key facts
- List each part, its failure modes and their effect on the critical load.
- Score severity, occurrence and detection, each from 1 to 10.
- Risk priority number = severity × occurrence × detection.
- Review every high-severity item, whatever its total score.
- Hidden failures, found only on demand, deserve the most attention.
- Re-score after actions to confirm the risk fell.
Worked example: four entries (illustrative)
| Failure mode | S | O | D | Score | Action | Score after |
|---|---|---|---|---|---|---|
| Generator starting battery weak | 9 | 5 | 6 | 270 | Battery monitoring with alarm | 90 (D 2) |
| UPS bypass breaker left open after maintenance | 8 | 4 | 7 | 224 | Checklist and position alarm | 64 (D 2) |
| Fuel contaminated | 9 | 3 | 6 | 162 | Periodic fuel testing | 54 (D 2) |
| Changeover controller fails to transfer | 9 | 3 | 5 | 135 | Regular on-load transfer test | 81 (D 3) |
S is severity, O is occurrence and D is detection, where a higher D means harder to detect. Each action improved detection, which is often the cheapest way to cut risk. See availability modelling.
Do not rank by total score alone. A failure that would drop the whole critical load deserves action even if it seems rare.
From parts to scenarios
| Scenario | Why a part list misses it |
|---|---|
| Mains fails during UPS maintenance | Two normal states combined |
| Generator starts but the changeover fails | Each part passes its own test |
| Cooling fails, then the UPS overheats | Failure spreads between systems |
See continuity chain and transfer coordination.
FMEA sheet
Seven parts of a 500 kW vaccine cold store and quality-control laboratory, scored on the one-to-ten scales. It is a different installation from the one in the example above, which is why the generator battery is deliberately left out of this sheet rather than scored again; these are the seven lines that came after it. S is severity if the failure happens, O is how often it is expected, D is the chance it stays undetected until it matters — so a high D is a bad thing, and RPN is the three multiplied together.
| Part | Failure mode | Effect | S | O | D | Action |
|---|---|---|---|---|---|---|
| Battery string connection | High-resistance joint | String drops out under load; half the autonomy gone with no warning and no alarm | 8 | 4 | 8 | RPN 256. Impedance test every six months and alarm the string breaker position |
| Day tank level switch | Sticks in the full position | Transfer pump never calls. The 500-litre day tank empties in about seven hours at 74 litres an hour while the bulk tank is still full, and the set stops | 9 | 3 | 7 | RPN 189. Independent low-level float on its own alarm, plus a dipped reading at every monthly run |
| UPS static switch | Fails to transfer to bypass on a UPS fault | All 104 kW of no-break load lost, with a healthy supply sitting on the other side of the switch | 9 | 2 | 7 | RPN 126. Exercise the transfer twice a year on load and alarm the switch position continuously |
| Monitoring supply at the server rack | Plug pulled out during cleaning | Audit trail gap. Nothing is damaged but batch release is delayed until the gap is explained | 6 | 5 | 4 | RPN 120. Locked plug, a labelled socket and a daily check that data is arriving |
| Refrigeration anti-recycle timer | Fails short, so the delay is lost | All three motors restart together instead of in sequence. The 135 kW block arrives as one step, the frequency dip goes past the 10% limit and the set can trip, so the building loses the supply it had just recovered | 7 | 3 | 5 | RPN 105. Stagger the restarts 30 seconds apart in the controller and prove it on the next black-building test |
| Cold-store feeder cable | Mechanical damage at the yard crossing | Refrigeration lost. A second feeder exists but has to be changed over by hand, so the loss lasts as long as it takes somebody to get there | 7 | 2 | 6 | RPN 84. Route survey, mechanical protection at the crossing and a labelled manual changeover |
| Mains contactor in the changeover | Contacts weld closed | The set could close onto a live mains and back-feed into a fault | 10 | 1 | 6 | RPN 60. Mechanical interlock between the two contactors and auxiliary contact proving before any close |
The sheet is sorted by RPN, and the order it produces is not the order anybody expected. The welded mains contactor is the most frightening line on the page — severity 10, a back-feed onto a live network — and it ranks last, at 60, because it is rare and because a mechanical interlock makes it visible.
The highest score, 256, belongs to a loose battery terminal: a joint nobody can see, on equipment nobody tests between services, which quietly removes half the autonomy the whole design depends on. That is the pattern FMEA exists to expose. Severity alone ranks the dramatic failures; the product ranks the ones that are actually waiting for you.
The two highest lines also share a cause, and it is worth naming: both are failures of a measurement, not of a machine. The battery joint and the stuck float switch are both cases where the system is telling the control panel that everything is in order and the panel has no way to know otherwise. Four of the seven actions in the last column are therefore detection measures rather than repairs — an impedance test, an independent float, a switch-position alarm, a daily data check — because on a standby installation the detection score is almost always the easiest of the three to move.
A starting library of failure modes
An FMEA is only as complete as its list of failure modes, and the most common weakness is listing each component as simply “fails”. Each type of component fails in several distinct ways, with different effects, and each way needs its own line. The library below is a starting point for the main items in a critical power system.
| Component | Failure modes to list separately |
|---|---|
| Circuit breaker | Fails to open on command or fault; fails to close; opens without cause; loses its position indication |
| Automatic transfer switch | Fails to transfer; transfers when it should not; stuck between sources; transfers to a dead source |
| Generator | Fails to start; fails to take load; fails while running; fails to synchronise; shares load wrongly |
| UPS | Inverter failure with transfer to bypass; failure to transfer; battery unable to carry the load; output fault |
| Protection relay | Fails to trip; trips without a fault; loses its auxiliary supply |
| Control system | Stops issuing commands; issues a wrong command; loses communication with field devices |
| Cable or busbar | Short circuit; earth fault; open circuit at a joint |
The modes that do something unwanted — a breaker opening without cause, a transfer switch moving to a dead source, a control system issuing a wrong command — are the ones most often omitted, because designers think about equipment failing to do its job rather than doing the wrong job. They are also among the most damaging, because redundancy designed to cover a missing function may do nothing against an active wrong one.
Common mistakes
- Scoring done once and filed.
- Human error left out.
- Only single failures considered.
- Actions with no owner or date.
What to send us
Send your single-line diagram and maintenance records. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Scores are illustrative.
Scoring S, O and D without flattering the design
An FMEA is only as good as its three columns, and all three are routinely scored in whichever direction makes the result comfortable. The scales below are the ones used on the sheet above, written down before the scoring started rather than agreed afterwards, which is the single thing that most improves an FMEA.
- Severity is scored on the load, not on the equipment. 10 is danger to a person or a back-feed onto a live network. 8 or 9 is the loss of a load that cannot be recovered — a batch, a sample, a cold chain. 5 to 7 is a loss that costs time but nothing irreversible. 1 to 3 is an inconvenience. Scoring a UPS failure as 10 because the UPS is expensive is the commonest mistake on the sheet; the question is what the load does, not what the repair costs.
- Occurrence is scored from your own records where they exist. Service reports, fault logs and the number of failed starts in the last hundred are better than any published figure, because they already include this site’s heat, dust and fuel. Where there is no record, score it from the nearest thing you do have and mark the line as an estimate, so that it can be corrected rather than inherited.
- Detection is the column that gets flattered. The honest test is: if this failed at three o’clock this morning, how would anybody know before the next outage? A continuous alarm into a manned room is a 2. An alarm on a panel nobody looks at is a 6, not a 2. A condition only found at the annual service is an 8 or 9. Anything found only by the failure itself is a 10. A great deal of the difference between a useful FMEA and a decorative one lives in this column.
Two rules keep the output usable. First, re-score after the action, not just before: the point of the last column is to move a number, and an action that leaves the RPN where it was has not earned its place.
The battery joint above goes from 256 to about 64 once impedance testing drops detection from 8 to 2 — the failure is just as likely, and that is fine, because it is now found at a test instead of at an outage. Second, never let a low RPN close out a high severity: a severity of 9 or 10 gets a control regardless of what the product says, because the product is an ordering tool and not a licence.
Lastly, a date and a name. Every line that carries an action carries who does it and by when, and the sheet is reviewed against the fault log once a year. An FMEA with no review date is a document about a building that no longer exists.
Questions engineers ask
What failure modes should an FMEA list for a circuit breaker?
Each distinct mode on its own line: fails to open on command or on a fault, fails to close, opens without cause, and loses its position indication. Listing a component as simply failing hides these differences, and each has a different effect on the system. The same applies to every component: a transfer switch can fail to transfer, transfer when it should not, stick between sources or transfer to a dead source.
Why do unwanted actions matter so much in an FMEA?
Because designers tend to list equipment failing to do its job and miss equipment doing the wrong job: a breaker opening without cause, a transfer switch moving to a dead source, a control system issuing a wrong command. These are among the most damaging failures, because redundancy designed to cover a missing function may do nothing against an active wrong one. List them explicitly for every component.
When should an FMEA be done?
During design, so findings can change the design, and again after major changes or incidents. An FMEA done after construction can only add procedures and monitoring, while one done during design can change the architecture, which is far cheaper. A review after an incident checks whether the analysis missed the failure that occurred.
Is a risk priority number reliable?
It is a ranking aid based on judgement. Use it to prioritise discussion, not to claim precision. Two people can give the same failure different scores, so the numbers are agreed in a team review, and a high severity item is addressed even if its overall score is modest.
What is the difference between FMEA and a fault tree?
An FMEA starts from component failures and traces effects. A fault tree starts from an unwanted outcome and traces possible causes. They complement each other: the FMEA finds what each failure does, while the fault tree shows the combinations of failures that lead to an outage of the critical load.
How many scenarios should I test?
All high-ranked ones, and a sample of others, as the site allows. Tests are planned with the operations team, run under controlled conditions with rollback ready, and recorded with the observed result, so the analysis is confirmed by real behaviour rather than by assumption alone.
This guide gives general principles. A site-specific FMEA needs your drawings and operating experience.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.