In short. A and B distribution gives critical loads two independent paths, from separate sources through separate boards and cables to the load. Each path must be able to carry the whole load alone. The two paths must stay independent through every change made over the years. A and B labelling and regular checks matter as much as the original design, because one wrongly connected feed quietly removes the redundancy.
Who this page is for: For data room, hospital and control room engineers designing or maintaining A and B power.
Key facts
- A and B paths share no source, board or upstream breaker, and cable routes are kept separate wherever possible.
- Each path is sized for the whole load.
- Normal loading on each distribution unit is kept to about 40% or less, so one unit can carry the whole pair at about 80%.
- Single-cord loads need a transfer switch fed from A and B.
- Label A and B clearly at every board and outlet.
- Audit connections after every change.
Worked example: four 150 kVA distribution units (illustrative)
| Pair | Load | Each unit normally | On one unit if the other fails |
|---|---|---|---|
| A1 and B1 | 120 kW | 60 kW (40% at unity power factor) | 120 kW (80%) |
| A2 and B2 | 120 kW | 60 kW (40%) | 120 kW (80%) |
An audit found that after a UPS replacement, unit A2 had been reconnected to the B UPS. Both halves of pair 2 then depended on one UPS. The connection was corrected and a check of every A and B source was added to the change procedure. See dual-cord loads and static transfer switches.
Do not reconnect any distribution unit after maintenance without confirming which source feeds it. A swapped A and B feed looks normal until the day it matters.
Independence check
| Item | Must be separate for A and B |
|---|---|
| Source (UPS or system) | Yes |
| Switchboards | Yes |
| Cable routes | Preferably |
| Rooms | Where fault tolerance is needed |
See fault tolerance and bus arrangements.
A and B audit sheet
An 800 kW semiconductor test and assembly plant, audited after a board extension — a larger installation than the four 150 kVA units in the example above, and audited for a different kind of fault. Every unit here was labelled correctly, so a check that stopped at the labels would have passed the whole sheet. The third column is the one that earns its place: it records where the feed actually comes from when it is traced back breaker by breaker, not what the label on the door says.
| Unit | Labelled | Actual source | Load, kW | Correct? |
|---|---|---|---|---|
| A1, 125 kVA | A | UPS A, board A1, no ties closed | 48 (38%) | Yes |
| B1, 125 kVA | B | UPS B, board B1, no ties closed | 48 (38%) | Yes |
| A2, 125 kVA | A | UPS A, board A1, no ties closed | 55 (44%) | Yes, but see below |
| B2, 125 kVA | B | UPS B, board B1, no ties closed | 55 (44%) | Yes, but see below |
| A3, 125 kVA | A | UPS A, board A2, no ties closed | 52 (42%) | Yes |
| B3, 125 kVA | B | UPS B, board B2, no ties closed | 52 (42%) | Yes |
| A4, 125 kVA | A | UPS A, board A2 — but tie Q7 to board B2 was found closed | 45 (36%) | No. A4 and B4 share board B2 through Q7 |
| B4, 125 kVA | B | UPS B, board B2, tie Q7 closed | 45 (36%) | No. Same shared board as A4 |
| Nitrogen plant control panel (single cord, on a transfer switch) | A and B | Both transfer switch inputs trace to UPS A — one through board A1, one through board A2 | 6 | No. A transfer switch with both inputs on one source |
| Total critical load | — | — | 400 | — |
Three findings came out of it, and not one of them involved a wrong label.
A closed tie defeats independence without touching anything. Tie Q7 had been closed during a board extension and never reopened. Both halves of pair 4 then stood on board B2, so a fault on that board, or any work on it, takes a 90 kW dual-cord load that was built to survive either path failing. Nothing was mislabelled, nothing was miswired, and the single line on the wall still showed Q7 open. This is why the independence check has to be a trace rather than a reading, and why tie positions belong on a log with a named owner.
A transfer switch is only as independent as its two inputs. The nitrogen plant panel is single cord, so it sits on a transfer switch exactly as it should — but both inputs had been picked up from the A side, through two different boards, which looks like diversity on a drawing and is none at all. A transfer switch fed this way transfers perfectly and still drops the load the moment UPS A is the thing that fails. The fix was one cable, from board B1; the lesson is that the audit question is not “are there two inputs?” but “where do the two inputs end up?”
Load creep quietly eats the failover margin. The plant was designed to the 40% rule, and the sheet shows pair 2 at 44% on each unit. That is still comfortable on both paths — but on one path those units carry 110 kW, which is 88% of a 125 kVA unit, not the 80% the design assumed. Pair 2 was split across a new pair of units to bring it back; the other three pairs sit at 77%, 83% and 72% on failover and were left. The figure to govern a change request is never the normal loading. It is what the surviving unit would read.
Loading each branch circuit for the day the other side fails
On a properly split A and B system, each dual-corded item draws roughly half its power from each side in normal running. When one side is lost, the whole of its load moves to the other cord in an instant, and every branch circuit on the surviving side carries double its normal current. Each circuit therefore has to be loaded in normal running to no more than half of what it may carry after a failure.
A common rule is to keep any circuit at no more than 80% of its breaker rating after a failure. For a 16 A circuit that is 12.8 A after failover, so no more than about 6.4 A in normal running. A circuit that looks lightly loaded at 9 A on a normal day will reach 18 A when the other side drops, and trip its breaker at exactly the moment it is the only supply. Branch circuit monitoring, reading each circuit’s current continuously, is the simplest way to see these circuits before they matter; without it, a clamp-meter survey of every circuit twice a year serves the same purpose.
The power a single rack can safely draw
The same arithmetic sets the power budget for each rack or equipment position. A rack fed by two single-phase 32 A distribution strips, one from each side, can draw no more after failover than one strip can carry. At 80% of 32 A, 25.6 A at 230 V and a power factor of about 0.95, that is about 5.6 kW for the whole rack. A rack loaded to 6 kW draws about 27.5 A from a single strip after failover and is over the limit.
| Strip feeding each side | Current after failover at 80% | Rack budget at 230 V and 0.95 |
|---|---|---|
| Single-phase 16 A | 12.8 A | about 2.8 kW |
| Single-phase 32 A | 25.6 A | about 5.6 kW |
| Three-phase 16 A per phase | 12.8 A on each phase | about 8.4 kW, if balanced across the phases |
| Three-phase 32 A per phase | 25.6 A on each phase | about 16.8 kW, if balanced across the phases |
The rack budget belongs on a label on the rack and in the records of whoever installs equipment in it, because the people who add servers are rarely the people who designed the power. With three-phase strips, the budget is reached on the most heavily loaded phase first, so equipment must be spread across the phases as it is installed, not wherever the nearest socket happens to be.
How dual power supplies actually share
Not every dual-corded item shares its load equally between its cords. Many server and network supplies share roughly evenly, but some run one supply as primary, carrying nearly all the load, with the other in standby; some share unevenly by design; and some, when one cord is lost and then restored, stay on the surviving supply until restarted. Each behaviour affects how the A and B sides are loaded, and the only reliable way to know is to measure.
With per-circuit or per-outlet monitoring, the picture appears at once. An item drawing current on its A cord and nothing on its B cord is either running primary-standby, has a failed supply, or has a cord plugged into the wrong side or not at all. Each of these is worth finding, because in the last two cases the item is single-corded in practice and will drop when side A is maintained or fails. A monthly review of items with one cord at or near zero current catches them.
Taking one side out for maintenance
The main purpose of an A and B design is that either side can be shut down for maintenance with the load running on the other. The procedure that makes this safe is short but must be followed every time, because the most common A and B outage is a side switched off while some load still depends on it alone.
| Step | Check |
|---|---|
| 1. Confirm the other side is healthy | Its UPS on inverter, no alarms, its distribution live to every rack |
| 2. Confirm every critical item is drawing from the other side | Per-cord currents, or supply status indicators, for every item on the affected units |
| 3. Check the other side’s loading after the move | Expected loading on each surviving circuit below its limit |
| 4. Isolate in stages, watching the load | Open one distribution unit at a time and confirm nothing drops |
| 5. Restore, then confirm sharing | Both cords drawing current again on every dual-corded item |
The last step is the one most often forgotten. Some supplies do not resume sharing on their own after their cord is restored, and an item left drawing only from side B has silently become single-corded; the next maintenance of side B then drops it.
Common mistakes
- A and B fed from one board.
- Labels not matching connections.
- Loading checked per unit only, not as the A+B total that each unit must carry alone.
- No audit after changes.
What to send us
Send your distribution layout and loads. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The example is illustrative.
Questions engineers ask
How much power can a dual-corded rack safely draw?
No more than one of its two strips can carry alone, because the whole rack moves to one strip when the other side fails. Keeping a strip at no more than 80% of its rating after failover, a single-phase 32 amp strip at 230 volts and a power factor of about 0.95 allows about 5.6 kW per rack, and a three-phase 32 amp strip about 16.8 kW if the load is balanced across the phases. Label the budget on the rack.
Why do some servers draw current from only one of their cords?
Some supplies run as primary and standby rather than sharing, some share unevenly by design, and some stay on one supply after the other cord is restored until restarted. A cord drawing nothing can also mean a failed supply or a cord on the wrong side. Per-cord or per-circuit monitoring shows these at once. Items with one cord at zero are single-corded in practice and will drop when that side is maintained.
Is A/B the same as 2N?
A/B describes two paths to the load. 2N describes two complete systems each able to carry the full load. A properly built A/B distribution with full-capacity paths is a form of 2N. Each path must also have its own sources, switchgear and controls, so that no single failure affects both.
Why keep each path at about half load?
So that when one path fails the other can carry everything without overload. Each path is kept below half its rating in normal operation, monitored continuously, and new loads are checked against the combined load before connection, because a path that has quietly grown above half its rating will overload during a failover.
What about single-corded equipment?
Use a transfer switch to select a path, accepting the switch as a single point of failure. A rack-mounted automatic transfer switch close to the equipment limits that risk to the few devices it feeds, and it is monitored and tested so that a failed switch is found before it is needed.
How do I check my paths are independent?
Trace each path from source to load and list every shared element, including controls, cooling, earthing and cable routes. Each shared element is then separated, protected or accepted with a recorded reason, and the list is reviewed after every change to the paths, rooms or equipment.