Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Islanded Critical-Power Operation

How a site operates as an electrical island: detection, separation from the grid, frequency and voltage control, load balance, reserve and resynchronisation, with the checks needed.

In short. Islanded operation means running the site on its own generators or batteries for hours or days, without mains. That changes more than the source. The fault level is lower, so protection may need different settings. The neutral earthing must come from the island’s own source. Frequency and voltage control rests with the sets, and fuel becomes a supply-chain issue. Plan an island for its whole duration, not just its first minutes.

Who this page is for: For sites facing long outages, planned grid shutdowns or remote operation: hospitals, plants and campuses.

Key facts

  • Fault current on generators is much lower than on mains.
  • Protection may need a separate settings group for island mode.
  • The neutral must stay earthed through the island’s source.
  • Sets in parallel share load through their governor and voltage controls.
  • Fuel stock and refuelling set the island’s real duration.
  • Load steps are a bigger risk than on mains.

Worked example: a 72-hour island (illustrative)

ItemWorkingResult
Energy700 kW average × 72 h50,400 kWh
Fuel at about 0.27 litres per kWh50,400 × 0.27about 13,600 litres
Fuel on siteBulk tank plus day tanks12,000 litres: short by about 1600 litres, and more once fuel that cannot be drawn from the tank bottoms is allowed for
Fault level at a main feederAbout 25 kA on mains; about 5 kA on generatorsSome breakers too slow on generator

The site arranged refuelling before day two and added an island settings group for the main feeder breakers. Use the set’s own fuel data for real planning. See short-circuit studies and earthing and neutral.

Do not assume protection set for mains will work in a long island. Check that faults on generator supply still clear quickly enough.

Island checks

AreaCheck
ControlLoad sharing and frequency stable in parallel
ProtectionClearing times at generator fault level
EarthingNeutral earthed through the island source
FuelStock, consumption and refuelling plan
StaffShift cover and procedures

See grid-forming battery islands and microgrids.

Island planning sheet

ItemValue
Island duration needed 
Average and peak load 
Fuel on site and refuelling 
Generator fault level 

How much fault current an island really has

On the mains, a fault at a 415 V board draws tens of kiloamps and every breaker trips on its instantaneous setting. In an island fed by generators, the fault current is far smaller and changes with time. A 500 kVA set with a rated current of about 696 A and a subtransient reactance of 0.12 per unit delivers about 5.8 kA in the first cycles, falling within a fraction of a second towards a sustained value that depends on its excitation.

With a permanent-magnet or other excitation support, the sustained current is commonly held at around three times rated, about 2.1 kA; without it, the current can collapse to below rated current as the voltage falls, and some faults are never cleared at all.

Breaker ratingInstantaneous setting at 10 times ratingOn the first cycles, about 5.8 kAOn the sustained current, about 2.1 kA
250 A2500 ATrips instantlyAbout 8 times rating: trips on its time-delayed element
400 A4000 ATrips only if the fault is close to the set and the current has not yet decayedAbout 5 times rating: slow trip, seconds
630 A6300 ADoes not trip instantlyAbout 3 times rating: very slow trip, or none

The larger the breaker, the less likely it is to trip promptly in an island. Faults on large feeders are then left on the set for seconds, deepening the voltage dip for every other load and risking the generator’s own protection tripping first, which ends the island altogether. A protection study for island mode, with the generator’s decrement curve drawn against every breaker’s characteristic, is the only way to know which faults will clear; the remedies include lower instantaneous settings applied in island mode, excitation support on the sets, and generator protection that discriminates with the feeders.

Earth faults deserve their own check. In an island the earth fault current returns through the generator’s neutral bond, and its size depends on the alternator’s zero-sequence reactance and on how the neutral is earthed. Where residual-current or earth-fault protection was set for the mains, with its solidly earthed transformer star point, its pickup may sit above the earth fault current the island can produce, or its timing may no longer discriminate. Check earth-fault settings for island mode alongside the phase-fault settings, and confirm by test that an earth fault on a feeder in an island is seen and cleared.

Two settings groups: grid and island

Many modern relays and electronic trip units hold more than one group of settings and switch between them on a signal. An island-capable site uses that to run grid settings, chosen for high fault levels and discrimination, while the mains is connected, and island settings, chosen for the generators’ much lower fault current, while it is not. The switch between groups is driven from the position of the mains incomer, so that it happens automatically at the moment the island forms.

The island group typically lowers instantaneous and short-time pickups on feeders and incomers, may shorten delays, and enables generator-specific functions such as voltage-controlled overcurrent. The group change must itself be tested: a site whose relays stay on grid settings in an island, because the signal was never wired or a contact failed, has the protection of neither mode.

Under-frequency load shedding in the island

An island has no grid to absorb a sudden loss of generation. If one of several sets trips, the remaining sets are suddenly overloaded, their frequency falls, and unless load is removed quickly they slow further and trip in turn. Under-frequency load shedding removes blocks of load in stages as the frequency falls, so that the remaining sets can recover.

StageFrequency settingShort delayLoad removed
149.0 HzAbout 0.2 sComfort cooling, non-essential process
248.5 HzAbout 0.2 sFurther non-essential loads
348.0 HzAbout 0.2 sEssential loads that can be restored later

The settings here are an illustration; the right stages and blocks come from the island’s own arithmetic. The first stage should remove enough load that the loss of the largest running set leaves the remaining sets within their capacity, so that a single trip is usually stopped at stage one. The stages must stay above the frequency at which the generators’ own protection trips, and the blocks must be measured, not estimated, because a stage that sheds less than planned fails to stop the decline. The shed loads are restored in steps after the frequency has recovered, following the restart sequence for the site.

Keeping several sets sharing properly

An island run on two or more generators depends on them sharing the load in proportion to their ratings, both the real power in kW and the reactive power in kVAr. Real power is shared by the governors, either by speed droop, in which each set’s frequency falls slightly as its load rises, or isochronously, with load-sharing controllers communicating between sets to hold the frequency at 50 Hz while dividing the load. Reactive power is shared by the voltage regulators, through reactive droop or a similar controller function. Either can go wrong without stopping the island, and the symptoms are worth knowing.

SymptomLikely causeWhat to check
One set carries far more kW than the othersMismatched droop settings, or a failed load-sharing linkGovernor droop on each set; the sharing communication
kW shared well, but one set’s current much higherReactive power not sharedVoltage regulator droop settings and sensing
Load swings slowly back and forth between setsGovernors or regulators hunting against each otherGain and stability settings; the sharing controller tuning
Frequency settles below 50 Hz under loadRunning in droop without a correctionWhether isochronous sharing or a frequency correction is intended

The second row is the one most often missed, because the kW readings look perfect while one set runs hot carrying the reactive load for both. Watch the current and kVAr on each set, not just the kW, during island tests and long island runs.

Returning the island to the grid

When the mains returns, the island can be ended in two ways: by an open transition, which interrupts the loads briefly while the source changes, or by synchronising the island to the mains and closing the incomer with both running, so that the loads see no break. The second needs the island to be brought into step with the grid, and the incomer allowed to close only when the two agree closely enough.

A synchronising check relay supervises the closing, and typical limits are a voltage difference of a few percent, a frequency difference of a small fraction of a hertz and a phase angle of around 10 degrees. Wider limits give a heavier jolt on closing, felt as a power swing on the sets and a torque on their shafts.

The utility’s agreement is needed for any arrangement that parallels a site’s generation with the grid, even briefly, and it usually comes with conditions on protection at the point of connection. Those conditions belong in the island design from the start, not in a later request.

Checks during a long island

An island measured in hours or days is a period of continuous operation of equipment normally run for a monthly test. Running checks keep it healthy: the load and power factor on each set against its rating; the share of load between sets; coolant and oil temperatures and pressures; fuel level against the consumption rate, with the next delivery confirmed well before it is needed; and the voltage and frequency at the critical boards.

A log entry every hour, signed, catches the slow changes — a set taking a growing share, a temperature creeping up — that an alarm sees only when it is too late. Plan the staffing for it before the island happens: a long island is a shift operation, and the people running it need to be rested, briefed and relieved.

Common mistakes

  • Fuel planned for hours, not days.
  • Mains protection settings used on generators.
  • Neutral earthing lost in island mode.
  • No staffing plan.

What to send us

Send loads, generator data and the island duration you need. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Values are illustrative.

Questions engineers ask

What is under-frequency load shedding?

Automatic removal of blocks of load in stages as the island frequency falls, so that the remaining generators can recover after a set trips or a large load arrives. Typical stages might shed non-essential load at 49.0 hertz, further load at 48.5 and some essential load at 48.0, each after a short delay. The first stage should remove enough load to cover the loss of the largest running set, and all stages must sit above the generator protection settings.

Why does one generator run hotter than the others in an island?

Often because reactive power is not being shared, even though the kW readings show an even split. The voltage regulators share kVAr through reactive droop or a sharing controller, and if their settings differ, one set carries most of the reactive load and runs at a higher current. Check the current and kVAr on each set as well as the kW, and compare the regulator droop settings and sensing between sets.

Is islanding the same as backup power?

Backup power may supply a separated load only. Islanding continues to run a connected system, with its generation and loads, independently. An island needs its own frequency and voltage control, protection that works at its lower fault levels, and a defined way to resynchronise and reconnect when the grid returns.

Why is protection harder in an island?

Low fault current from generators and inverters may not trip standard overcurrent relays. Inverters limit their fault current to little more than rated current, and generator fault current decays within seconds. Protection in island mode may use voltage-restrained overcurrent, differential or under-voltage functions, with a separate settings group selected when the island forms.

Does the utility need to approve?

Usually yes for grid-connected installations that can island or reconnect. Check local rules. The utility needs to know that the site will not energise its network during an outage, which would endanger its line staff, so anti-islanding protection and the reconnection arrangements are agreed in writing before commissioning.

Can renewable sources join the island?

Yes with suitable controls, and usually with storage or a grid-forming source to hold the frequency. Solar output can change quickly with cloud, so the island controller limits renewable output to what the forming source can balance, and keeps any generator above its minimum load to avoid wet stacking and reverse power.

This guide gives general principles. Grid-interconnection rules and utility approvals must be checked for your site.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.