In short. Paralleling switchgear connects two or more generators to a common bus. It must bring each set into synchronism before closing, share kW and kVAr between them, protect the bus and each generator, and manage starting, stopping and the failure of a unit. The bus and every breaker must be rated for the combined fault level of all sets running together.
Who this page is for: For consultants, contractors and owners designing or buying multi-generator paralleling systems.
Key facts
- Each set has its own breaker, synchroniser and protection.
- The common bus must withstand the fault level of all sets together.
- Load sharing splits kW and kVAr in proportion to rating.
- A master or plant controller handles start, stop and dispatch.
- Reverse power and loss of excitation protect each set from the others.
- Paralleling with the grid needs utility approval and extra protection.
Main parts
| Part | Job |
|---|---|
| Generator breakers | Connect each set to the bus |
| Bus | Rated for combined current and fault level |
| Synchroniser and check-sync | Match voltage, frequency and phase before closing. See synchronisation |
| Load-share controller | Splits kW and kVAr. See load sharing |
| Master controller | Start, stop and dispatch. See power management |
| Feeder breakers | Distribution and shedding |
Worked example: bus fault level with three sets (illustrative)
| Item | Working | Result |
|---|---|---|
| Set rating | 3 × 1000 kVA at 415 V | about 1391 A each |
| Initial fault contribution per set (sub-transient reactance about 12%) | 1391 ÷ 0.12 | about 11.6 kA |
| Three sets together | 3 × 11.6 | about 35 kA initially |
| Bus and breakers chosen | Breaking rating above 35 kA symmetrical, and making (peak) rating above about 2.1 × that, plus any motor contribution, with margin; checked again if a fourth set or grid parallel is added | |
The original design used breakers rated for one set’s contribution only. Adding sets later multiplies the fault level at the bus. See coordination.
Do not add a generator to an existing paralleling board without recalculating the bus fault level. Breakers that cannot interrupt the new fault current can fail violently.
Protection for each set
- Overcurrent, voltage-restrained where fault current decays.
- Earth fault and restricted earth fault.
- Reverse power and loss of excitation.
- Over and under voltage and frequency.
See overcurrent and DC control power.
Paralleling design sheet
| Item | Value |
|---|---|
| Sets now and future | |
| Bus fault level, all sets | |
| Breaker short-circuit rating | |
| Load sharing method | |
| Grid parallel? (approval) |
The synchronising window and the breaker’s closing time
A synchroniser does not close the breaker when the two voltages are exactly in phase. It closes it early, because the breaker takes time to close, and in that time the incoming set keeps slipping against the bus. The controller therefore works to a window of voltage, frequency and phase difference, and issues the close command at the moment that will bring the contacts together close to zero angle.
| Quantity | Typical window (illustrative) | Why it matters |
|---|---|---|
| Voltage difference | Within about 5% | A large difference drives reactive current between the sets at the instant of closing |
| Frequency difference (slip) | About 0.1 to 0.2 Hz, incoming set slightly fast | A slightly fast incoming set picks up a little load rather than motoring |
| Phase angle | Within about 10 degrees at contact closure | The angle sets the size of the current and torque surge |
The phase advance needed is slip × 360 × closing time. With a slip of 0.1 Hz and a breaker that takes 80 ms to close, the angle moves by 0.1 × 360 × 0.08, about 2.9 degrees, during the closing time; at 0.2 Hz it moves about 5.8 degrees. The synchroniser must know the breaker’s actual closing time, measured at commissioning, and that time must stay consistent: a breaker whose mechanism has slowed with age closes later than the synchroniser expects. See automatic synchronising control architecture.
What an out-of-phase closure does
If the breaker closes with the two voltages apart, the difference voltage drives a current through the reactances of both machines. A screening estimate of the surge in per unit is 2 × sin(δ ÷ 2) ÷ X, where δ is the angle at closure and X the total reactance in the loop.
With a loop reactance of 0.30 per unit, closing at 60 degrees gives about 3.3 times rated current, and closing at 180 degrees, fully out of phase, about 6.7 times: comparable to a terminal short circuit, but with a torque that can shear couplings and twist shafts. That is why every paralleling breaker needs an independent check-synchronising relay in its closing circuit, wired so that neither the automatic synchroniser nor an operator can close outside the window.
Bus arrangements and what each costs
| Arrangement | Advantages | Limitations |
|---|---|---|
| Single bus | Simplest; lowest cost; easy to operate | A bus fault or bus maintenance takes every set and every feeder out |
| Split bus with a bus coupler | A bus fault takes out only half; maintenance on one half while the other runs | More breakers and interlocking; sharing across the coupler must be managed |
| Split bus with a tie to a second board | Each half can be fed from the other; supports concurrent maintenance | Higher cost; fault level with the tie closed must be checked |
Choose the arrangement from what the site must keep running during a bus fault and during maintenance, then size every breaker for the fault level of the arrangement that produces the highest current.
Worked example: sharing between sets of different sizes
Sets of different sizes can run in parallel provided they share load in proportion to their ratings. In droop mode each governor lowers its speed as its load rises, and sets with the same percentage droop share load in proportion to rating. Take a 1000 kVA set (800 kW) and a 500 kVA set (400 kW), both at 4% droop, carrying 900 kW. The load divides in the ratio of rating divided by droop, 800 to 400, so the large set carries 600 kW and the small set 300 kW: each at 75% of its rating.
If the small set’s droop were set at 3% instead, it would take a larger share than its rating justifies and reach full load first. Isochronous sharing over a load-sharing link removes the frequency droop but needs the link to work; droop remains the fallback when it does not. See generator kW load-sharing control.
Where a split bus has a coupler, interlock it with the generator breakers and the synchronising logic so that the two halves are always synchronised before the coupler closes, and so that the coupler cannot close while either half is being fed from a source that has not been checked against the other. The coupler is a paralleling breaker in its own right and needs its own check-synchronising relay.
Dead-bus closing when several sets start together
After a blackout, several sets may reach rated speed at almost the same moment, and each sees a dead bus. If two of them close onto the dead bus together, they are paralleled without synchronising. The paralleling system must therefore grant dead-bus closing permission to one set only, through a hard-wired or reliably communicated arbitration, and every other set must then synchronise to the live bus in the normal way. The arbitration has to work even if the plant controller has failed, which is why many plants back it up with a simple wired permissive chain between the generator breakers. See dead-bus, live-bus and sync-check control logic.
Reverse power and loss of excitation on paralleled sets
A set that loses fuel, or whose governor fails, stops producing power and starts drawing it from the others, running as a motor. Reverse power protection detects that: for a diesel set it is commonly set at around 5 to 10% of the set’s rated kW, with a delay of a few seconds to ride through the brief reverse flow that can follow synchronising or a load change.
A set whose excitation fails draws reactive power from the others instead, and its voltage collapses; loss-of-excitation protection trips it before it overheats or drags the bus voltage down. Both functions are needed only because the sets are paralleled, and both are often missing on boards that began life with one set and had others added later. See reverse power and generator protection.
When the paralleling board also connects to the grid
A board that parallels with the utility, even briefly, needs everything above plus protection the utility will specify: loss-of-mains detection, an interface protection relay at the point of connection, and often directional overcurrent so that the plant does not feed a fault on the utility network. The fault level at the board rises by the utility’s contribution, and the sets must be able to export or import within agreed limits without hunting. Treat grid paralleling as a separate design stage with the utility’s approval, not as an option ticked on the controller. See utility and DG synchronisation.
What a paralleling breaker must have
- A motor-operated closing mechanism with a consistent, measured closing time.
- A breaking rating above the fault level of all sets together, and a making rating above the corresponding peak.
- A check-synchronising relay in its closing circuit, independent of the synchroniser.
- Trip from the set’s own protection, including reverse power and loss of excitation, on a supervised trip circuit.
- Position contacts reporting to the plant controller, so the controller knows which sets are on the bus.
Paralleling sets of different makes or ages
Older sets added to a new board often bring different governors, AVRs and load-sharing methods. Before they are paralleled, check that every set can accept the same sharing signal or can run in droop with matched droop settings, that their AVRs share reactive load stably, that their winding pitches will not drive circulating third-harmonic current through joined neutrals, and that each set’s protection includes reverse power and loss of excitation. A set that cannot meet these is better kept on a separate bus than forced onto a common one.
Commissioning a paralleling board
Before the first close, prove phase rotation and phasing across every generator breaker by measuring the voltage between matching phases with both sides live and the breaker open: near zero when the synchroscope shows in phase, and twice phase voltage when it shows opposition. Then close with the trip ready, and test sharing at about 25, 50, 75 and 100% of plant load, recording kW and kVAr on every set. Finally, trip each set in turn at load and confirm that the others carry on, that load shedding acts if needed and that no protection on the healthy sets operates.
Common mistakes
- Fault level not updated when sets are added.
- No reverse power protection.
- Sharing not tested at several loads.
- No plan for a failed master controller.
What to send us
Send the set ratings, number of sets planned and single-line diagram. WhatsApp 98852 01608 or use the application engineering enquiry. See synchronising switchgear.
Evidence note. Reactances and fault levels are illustrative; studies govern.
Questions engineers ask
How close must voltage, frequency and phase be before paralleling?
Typical limits are a voltage difference within about 5%, a slip of about 0.1 to 0.2 Hz with the incoming set slightly fast, and a phase angle within about 10 degrees at the moment the contacts touch. The synchroniser issues the close command early to allow for the breaker closing time: at 0.1 Hz slip and an 80 ms breaker, the angle moves about 2.9 degrees while the breaker closes.
What reverse power setting suits a diesel generator?
Commonly around 5 to 10% of the set rated kW, with a delay of a few seconds so that the brief reverse flow after synchronising or a load change does not trip it. The function protects the set and the others on the bus when one set loses fuel or its governor fails and it starts to run as a motor. Confirm the setting with the engine maker motoring power figure.
Can different generator sizes run in parallel?
Yes. Sets of different ratings share load in proportion to their ratings, provided their governors use the same droop or a common load-share link, their voltage regulators share reactive power correctly, and their alternator pitches are compatible so circulating third-harmonic current through the neutrals stays small. Test sharing at several loads with a load bank before relying on it.
What if sync-check fails?
The close is blocked, which is the sync-check relay doing its job. Look at what is outside the window: slip too high because the governor is hunting, voltage difference because a regulator setting is wrong, or a phase angle that never settles. A sync-check failure on a new installation can also mean reversed phase sequence or VT wiring, which must be found before any manual close is attempted.
What is a dead-bus closing?
The first breaker closing onto a busbar with no voltage on it. No synchronising is needed, but the logic must make sure only one set closes onto the dead bus, otherwise two unsynchronised sets could close together. A dead-bus arbitration signal or a short random delay with a lockout of the others is normally used, then the remaining sets synchronise to the live bus.
Is a master controller necessary?
For two sets with good individual controllers, often not; they can share load and arbitrate dead-bus closing between themselves. For plants with several sets, mains parallel operation or load shedding, a master controller or power management system coordinates starting, stopping, reserve and shedding, and gives one place to see and record the plant state.
This guide gives general principles. Specification needs project data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.