In short. Real power (kW) is shared between paralleled generators through their governors. With droop control, each set lowers its speed slightly as load rises, so sets on a common bus settle at shared loads. With isochronous sharing, a load-sharing signal or network tells each set its share while frequency is held at nominal. Settings must match across all sets, and sharing must be checked under real load.
Who this page is for: For commissioning engineers and technicians setting up or troubleshooting kW sharing on paralleled sets.
Key facts
- Droop percent = (no-load frequency − full-load frequency) ÷ nominal frequency × 100.
- Typical droop is a few percent; equal droop and rating give equal per-unit sharing.
- Isochronous sharing holds frequency and shares by a common signal or network.
- Unequal no-load speed settings cause unequal sharing under droop.
- A set taking negative kW is motoring and will trip on reverse power.
- Check sharing at several load levels, not just one.
Droop sharing
Each governor has a speed-load line with a small droop. On a common bus all sets run at the same frequency, so each carries the load where its line crosses that frequency.
Worked example: why one set took more (illustrative)
Two 800 kW sets with 4% droop share 800 kW. Nominal 50 Hz, so 4% is 2 Hz from no load to full load.
| Item | Set 1 | Set 2 |
|---|---|---|
| No-load frequency setting | 51.0 Hz | 51.2 Hz |
| Frequency fall per kW | 2 Hz ÷ 800 kW = 0.0025 Hz per kW | |
| Bus frequency found | 50.1 Hz | |
| Load = (no-load f − bus f) ÷ 0.0025 | (51.0 − 50.1) ÷ 0.0025 = 360 kW | (51.2 − 50.1) ÷ 0.0025 = 440 kW |
The two loads add up to the 800 kW bus load. A 0.2 Hz difference in no-load setting moved 40 kW from one set to the other, an 80 kW gap between them. Matching no-load settings brought both to about 400 kW. See kW and kVAr sharing.
Do not mix droop and isochronous sets without a load-sharing scheme. One isochronous set on a bus with droop sets will take every load change until it is fully loaded or reverse-powered.
Isochronous sharing
Sets hold nominal frequency and share load through analogue sharing lines or a controller network. Faults in the sharing link must fall back to droop, not to a set taking all the load. See multi-set load sharing.
Commissioning checks
- Match no-load speed and droop on every set.
- Load the bus in steps; record kW per set.
- Break the sharing link; confirm fallback.
- Check reverse power protection. See reverse power.
kW sharing record
| Total load | Set 1 kW | Set 2 kW | Set 3 kW | Bus frequency |
|---|---|---|---|---|
| 25% | ||||
| 50% | ||||
| 75% |
Worked example: sets of different sizes on droop (illustrative)
An 800 kW set and a 400 kW set, both with 4% droop and both set to the same no-load frequency of 52 Hz, share a 900 kW load. With 4% droop each falls 2 Hz from no load to its own full load, so the 800 kW set falls 2 ÷ 800 = 0.0025 Hz per kW and the 400 kW set 2 ÷ 400 = 0.005 Hz per kW.
| Step | Working | Result |
|---|---|---|
| Fall from no-load frequency, F | F ÷ 0.0025 + F ÷ 0.005 = 900, so 400F + 200F = 900 | F = 1.5 Hz |
| Bus frequency | 52 − 1.5 | 50.5 Hz |
| 800 kW set | 1.5 ÷ 0.0025 | 600 kW, 75% |
| 400 kW set | 1.5 ÷ 0.005 | 300 kW, 75% |
Equal percentage droop on each set’s own rating gives equal percentage loading, which is the aim. If the smaller set were given a droop of 2 Hz referred to the larger set’s 800 kW, it would carry the same kilowatts as the large set, 450 kW each, and run at more than its rating.
Sharing during a load step
Droop sets the sharing once everything has settled. In the first second or two after a step, each set takes load according to how fast its governor and engine respond, so a set with a fast electronic governor and a turbocharger already spinning can pick up much more than its share, while an older set lags. A 200 kW step might land mostly on one set for a moment before the shares even out. That is normal, but it matters for protection: reverse power, overcurrent and overload settings must ride through the transient, and the sets should be tested with real steps, not only at steady loads.
Load-sharing lines and their failure modes
| Failure | What happens without a fallback | What a good design does |
|---|---|---|
| Sharing line broken to one set | That set reads zero share and may run up to full load or run down to motoring | Detects the open line and switches that set to droop |
| Sharing line shorted | All sets read the same false value; sharing is lost | Detects the out-of-range signal and falls back to droop |
| Signal scaling differs between makes | Sets share in the wrong proportion all the time | Interface module scales each signal; checked at commissioning |
| Network link lost on digital sharing | Controllers hold the last share or drift | Each controller switches to droop within a set time and alarms |
When the measurements, not the governors, are wrong
Sharing is only as good as the kilowatt measurement each controller makes. A CT with the wrong ratio entered, a reversed CT on one phase or a VT phase missing can make a controller believe its set carries more or less than it does, and the governor then corrects to the wrong figure. If two sets refuse to share however the settings are adjusted, check each set’s measured kW against an independent clamp-on power instrument at the same moment. A 5% measurement error looks exactly like a 5% sharing error.
Loading and unloading gently
A set that has just closed should take its share over a few seconds, not instantly, and a set that is about to stop should unload to a few percent before its breaker opens. A ramp of about 20% of rating every 10 seconds is a common starting point, set to suit the engine.
Ramping in protects the engine and the others from a sudden shift of load; ramping out stops the set from tripping on reverse power as it disconnects and spares the others a step. Base-load mode, holding one set at a fixed output while the others share the rest, is useful for running-in an overhauled engine and for grid-parallel operation.
When one set will not take its share at high load
A set that shares correctly at half load but falls behind as load rises is usually short of fuel or power, not wrongly set: a restricted fuel filter, a worn actuator, a turbocharger fault or high intake air temperature. The governor asks for more fuel and the engine cannot deliver it, so the set’s share stalls while the others take up the difference. That is why sharing must be checked at 75 and 100% load, and why a sharing record that degrades over months is an early engine maintenance warning.
Commissioning kW sharing step by step
| Step | Check | Pass when |
|---|---|---|
| 1. Each set alone, no load | No-load frequency on a calibrated instrument | Matched within about 0.05 Hz |
| 2. Each set alone, full load on a load bank | Full-load frequency | Droop matches the setting |
| 3. Sets in parallel, 25, 50, 75 and 100% | kW per set | Each within about 5% of its rating-proportional share |
| 4. Load steps up and down | Transient sharing and recovery | Shares settle within seconds; no protection operates |
| 5. Sharing link broken | Fallback | Sets move to droop and keep sharing; alarm raised |
| 6. One set unloaded and opened | Ramp out | No reverse power trip; others take the load smoothly |
When sets hunt against each other
Two sets that share correctly on average can still swap load back and forth every few seconds. The cause is usually governors tuned too aggressively for parallel running, or a sharing loop gain set too high, so each set over-corrects the other’s movement. Tune one set at a time with the others in droop, then bring the sharing loop in gently and watch the kW traces. A recording of a few minutes at steady load shows hunting clearly; a single meter reading never does.
Bringing frequency back to 50 Hz under droop
With droop alone, bus frequency falls as load rises: in the example above it sits at 50.5 Hz with 900 kW, and it would sit lower still at higher load. Many loads do not mind, but clocks, some drives and paralleling with the grid do. A plant controller can trim all the sets’ speed set points together, by the same amount, to bring the bus back to 50 Hz while keeping each set’s share unchanged. The key is that the trim is applied equally; trimming one set alone simply moves load onto it, which is exactly the fault the worked example at the top of this page found.
Recording sharing for maintenance
Log each set’s kW and the bus frequency at a few fixed loads during every load-bank test or monthly on-load run. Over months these records show a set drifting out of its share long before anyone notices on the panel: a slowly falling share at high load points to fuel or air supply, a sudden shift points to a changed setting or a measurement fault. Keep the records with the governor settings so the cause of any change can be traced.
Common mistakes
- Unequal no-load settings.
- Mixed droop and isochronous sets.
- No fallback when the sharing link fails.
- Sharing checked at one load only.
What to send us
Send kW readings per set at several loads and the governor settings. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Settings and loads are illustrative.
Questions engineers ask
How do sets of different sizes share kW under droop?
In proportion to rating, if each has the same percentage droop on its own rating and the same no-load frequency. An 800 kW and a 400 kW set at 4% droop and 52 Hz no-load sharing 900 kW settle at 50.5 Hz with 600 kW and 300 kW, both 75%. Droop referred to the wrong rating makes the small set overload.
How fast should a generator take load after it closes?
Over a few seconds, not instantly. A ramp of about 20% of rating every 10 seconds is a common starting point, adjusted to the engine. Ramping in protects the engine and the other sets from a sudden shift of load; ramping out to a few percent before opening the breaker prevents a reverse power trip and spares the others a step.
Can different sizes share?
Yes, in proportion to their ratings, provided each set has the same percentage droop referred to its own rating and the same no-load frequency, or provided isochronous sharing signals are scaled to each rating. An 800 kW and a 400 kW set sharing 900 kW should then carry 600 kW and 300 kW, both 75%.
Why does one set always carry more?
Usually a no-load speed or droop setting that differs from the others, a sharing signal scaled wrongly, or a kW measurement error such as a wrong CT ratio. If the imbalance appears only at high load, the engine may be short of fuel or power. Compare each set measured kW with an independent instrument before adjusting settings.
What is a load-sharing line?
A signal, often an analogue voltage, connected between generator controllers so each can compare its own load, as a fraction of rating, with the others and adjust its speed set point until all match. It allows isochronous sharing at a constant frequency. A broken or shorted line must be detected and make each set fall back to droop.
Does kW sharing affect kVAr?
They are controlled separately: kW by the governors and kVAr by the voltage regulators. They interact during transients, and a set with unequal kVAr shows higher current at the same kW, which can look like a kW problem on an ammeter. Check kW, kVAr and current together for every set at several loads.
Values are illustrative. Follow manufacturer settings.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.