Protection Coordination and Selectivity Guide

How to make the protective device nearest a fault trip first, using time, current and zone methods, with margins, generator considerations and the checks that prove a coordination study.

In short. Selectivity means that when a fault occurs, only the device nearest to it trips, and every healthy circuit stays on. It is achieved by grading devices in time, current or zone so that upstream devices wait, while still clearing fast enough to protect cables, transformers and the generator. The test that most studies miss is the generator: its fault current is far lower and falls with time, so settings that are selective on the grid can be slow, or not selective at all, on generator supply.

Who this page is for: For protection engineers, consultants and maintenance teams setting or checking breaker and relay settings, especially on sites that run on both grid and generator.

Key facts

  • Upstream operating time ≥ downstream clearing time + grading margin.
  • Typical grading margins are a few tenths of a second for relays and less for modern electronic trip units; use the makers’ data.
  • Full selectivity holds up to the maximum fault level; partial selectivity holds only up to a stated current.
  • Check every source mode: grid, generator and any parallel operation.
  • Generator fault current starts at about rated current ÷ X″d and decays; with a PMG or auxiliary winding it may sustain about 3 times rated for around 10 seconds.
  • Settings changed on site must be recorded and the study updated.

Methods of achieving selectivity

MethodHow it worksTrade-off
Time gradingUpstream devices have longer delaysFaults near the source clear more slowly
Current gradingDifferent pickup levelsWorks only where impedance makes fault current differ between levels
Zone selective interlockingThe downstream device tells the upstream one to waitNeeds wiring or communication, and testing
Differential (unit) protectionTrips only for faults inside its zoneHigher cost
Energy-based selectivityMaker-tested pairs of current-limiting devicesValid only for the tested combinations

Time grading

Upstream operating time ≥ downstream clearing time + grading margin

The margin covers the downstream breaker’s opening time, relay overshoot and tolerances. Electromechanical relays need the widest margins; numerical relays and electronic trip units allow smaller ones. Use the makers’ figures rather than a universal number.

Worked example: one feeder, two sources (illustrative)

A 400 A MCCB feeder sits below a 1600 A incomer ACB. On grid supply, a 1000 kVA, 5% transformer gives about 25 kA at the feeder. On generator supply, a 750 kVA set (rated 1043 A, X″d about 0.12) gives about 8.7 kA in the first cycles, decaying to about 3.1 kA sustained.

DeviceSetting
Feeder MCCB 400 AInstantaneous at 10 × In = 4000 A
Incomer ACB 1600 AShort-time pickup 3 × In = 4800 A, delay 0.3 s; instantaneous off
Fault caseWhat happensVerdict
Grid, bolted fault at the feeder (25 kA)MCCB trips instantaneously; ACB picks up but waits 0.3 sSelective and fast
Generator, bolted fault at the feeder (8.7 kA falling)Current exceeds 4000 A in the first cycles, so the MCCB trips; the ACB waitsSelective
Generator, fault at the end of a long cable (about 3 kA)Below the MCCB instantaneous and the ACB short-time pickups; the MCCB clears only on its long-time curve, after several secondsSlow, and at risk: the generator carries about 3 times rated current for that time, and its own overcurrent protection may trip first and drop the whole board

The fix is a feeder trip unit with a lower short-time or instantaneous pickup, for example an electronic MCCB set to about 2000 A, or a generator setting group, so the remote fault clears within the generator’s capability. The grid-only study would never have shown the problem. See overcurrent protection.

Do not sign off a coordination study checked on grid supply only. Repeat it with the generator’s decaying fault current, or the first fault on generator supply may trip the wrong breaker or overheat the alternator.

Study workflow

  1. Draw the single-line diagram with all device and cable ratings.
  2. Calculate maximum and minimum fault levels for each source mode. See fault levels.
  3. Plot device curves on a common current axis at one voltage.
  4. Set the downstream devices first, then work upstream with grading margins.
  5. Check damage curves of cables, transformers, motors and the generator.
  6. Repeat for generator and parallel modes.
  7. Issue the settings, test them by injection and record as-left values.

Typical problems found

ProblemConsequence
Incomer short-time delay switched offIncomer trips before the feeder: whole board lost
Instantaneous settings overlapping between levelsBoth devices trip on a high fault
Instantaneous set too lowNuisance trips on transformer or motor inrush
Settings changed on site and not recordedThe study no longer describes the plant

Generator considerations

Generator fault current is lower and decays with time, so curves must be checked against the generator’s decrement curve as well as the grid fault level. A second setting group, switched when the generator is the source, is common. The generator’s own damage curve limits how long it can feed a fault. See generator short-circuit contribution and TCC coordination.

Selectivity check sheet

A site with a 1000 kVA transformer and a 250 kVA standby set, worked down the chain. The grid column is the easy one. The column that decides the settings is the minimum fault on the generator: 250 kVA at 0.22 per unit delivers about 1582 A at the first instant and settles to about 1044 A, so any short-time element set above that never operates at all when the set is supplying.

Downstream device and settingUpstream device and settingMax fault (kA)Min fault on generator (kA)Margin met?
63 A MCB, C curve, final circuit160 A MCCB feeder, Ir 128 A, Isd 768 A at 0.1 s251.0Yes
160 A MCCB, Ir 128 A, Isd 768 A at 0.1 s400 A MCCB, Ir 360 A, Isd 2880 A at 0.2 s251.0No — 2880 A is above anything the set can deliver, so the upstream short-time element never picks up on generator supply. Reduce Isd to 900 A, which still sits clear of the 768 A below it.
400 A MCCB, Ir 360 A, Isd 900 A at 0.2 s1600 A ACB incomer, Ir 1440 A, short-time 5760 A at 0.3 s251.0Grid only. On generator supply the incomer gives no backup at all: 1044 A is below even its 1440 A long-time setting, so nothing upstream will ever see the fault.
400 A generator breaker, Ir 360 A, Isd 900 A at 0.2 sGenerator relay, voltage-restrained overcurrent1.61.0Yes — voltage restraint lets the relay pick up below full-load current once the voltage has collapsed, which is the only element that can
     
     
     

Rows two and three are what this sheet exists to catch, and between them they describe the commonest condition on a site with a standby set: a chain that grades correctly against the grid and, the moment the generator takes over, loses first its instantaneous protection and then its backup altogether.

Nothing on the panel looks wrong, and no amount of adjusting the moulded-case breakers fixes row three — a generator that sustains about three times its rated current cannot reach the long-time setting of its own incomer. That is why the fourth row moves the job to the generator relay, where voltage restraint can pick up below full-load current. The study simply was never run with the generator as the source.

Worked example: grading two inverse-time relays (illustrative)

A downstream feeder relay is set at 400 A with a time multiplier of 0.1 on the standard inverse curve, t = 0.14 × TMS ÷ ((I ÷ Is)0.02 − 1). The upstream relay is set at 800 A. The highest fault current both relays see is 4000 A, and the grading margin is 0.3 s.

StepWorkingResult
Downstream time at 4000 A4000 ÷ 400 = 10 times; 0.14 × 0.1 ÷ (100.02 − 1) = 0.014 ÷ 0.0471about 0.297 s
Upstream time required0.297 + 0.30.597 s
Upstream multiple at 4000 A4000 ÷ 800 = 5 times; 50.02 − 1 = 0.0327
Upstream time multiplier0.597 × 0.0327 ÷ 0.14about 0.139, so set 0.14
Check0.14 × 0.14 ÷ 0.0327about 0.599 s: margin met

Grade at the highest fault current both relays see, because inverse curves converge as current rises; at lower currents the margin is wider. Then repeat the check at the generator’s sustained fault current, where the relays may be on a much flatter part of their curves and the times much longer.

Fuses and breakers in the same chain

  • Fuse below fuse: general-purpose fuses of the same type are normally selective when the upstream rating is at least 1.6 times the downstream rating, for example 160 A above 100 A.
  • Fuse below breaker: the fuse’s total clearing energy must stay below the energy that operates the breaker’s instantaneous element; check the maker’s selectivity tables.
  • Breaker below fuse: the hardest pair. The fuse melts quickly at high current, so selectivity often holds only up to a limit current well below the maximum fault.

Reading a selectivity limit correctly

Maker tables often state selectivity between two breakers as a limit current, for example 6 kA. Up to that current only the downstream breaker trips; above it both may trip. Compare the limit with the maximum fault at the downstream breaker’s location, not at the upstream board. A final circuit 40 m from a 25 kA board may see only 4 kA, so a 6 kA limit gives full selectivity there even though it looks inadequate against the board’s fault level.

Earth-fault grading is a separate study

Earth-fault elements, residual current devices and generator earth-fault protection grade among themselves, independently of the phase elements. A common low-voltage chain is 30 mA instantaneous devices on final circuits, 300 mA time-delayed devices on sub-mains, and a ground-fault element on the incomer set at a few hundred amperes with a delay of a few tenths of a second. On generator supply the earth-fault current depends on how the generator neutral is earthed, which can be far lower than the transformer case, so check every earth-fault setting against that figure. See earth-fault and ground-fault protection.

Inrush and cold load pickup

A transformer draws an inrush of roughly 8 to 12 times its rated current for about a tenth of a second when energised, and a feeder restored after a long outage draws more than its normal load while motors restart and cooling loads catch up. Instantaneous settings must sit above the inrush, and time-delayed settings above the cold load, or the first restoration after a fault trips the board again. Generator restoration is the harder case, because the set’s voltage dips under the combined inrush; stage the closing of large transformers and motor groups rather than closing them all at once.

Common mistakes

  • Coordination checked on one source only.
  • Overlapping instantaneous settings.
  • Settings changed in service without updating the study.
  • Ignoring the generator’s damage curve.

What to send us

Send relay and breaker data with present settings, the single-line diagram and the generator data. WhatsApp 98852 01608 or use the enquiry form. See also setting philosophy.

Evidence note. Settings and fault levels are illustrative; final settings follow the device makers’ curves and a coordination study.

Questions engineers ask

How is the time multiplier for an upstream IDMT relay chosen?

Find the downstream relay time at the highest fault both relays see, add the grading margin, then solve the curve for the upstream multiplier. With a downstream relay at 400 A and multiplier 0.1, a 4000 A fault clears in about 0.297 s; adding 0.3 s needs 0.597 s from an 800 A upstream relay, which gives a multiplier of about 0.14 on the standard inverse curve.

What fuse ratio gives selectivity?

General-purpose fuses of the same type are normally selective when the upstream rating is at least 1.6 times the downstream rating, such as 160 A above 100 A. For a breaker below a fuse, selectivity often holds only up to a limit current, so check the maker tables and compare the limit with the maximum fault at the downstream location rather than at the board.

What is full selectivity?

Selectivity that holds for every fault current up to the maximum prospective fault at the downstream device: only the device immediately upstream of the fault trips, and everything else stays on. It is confirmed from the time-current curves and the maker selectivity tables, and must hold on every source, including the generator.

Is full selectivity always possible?

No. Some device pairs are selective only up to a limit current, above which both may trip. That can be acceptable if the limit is above the maximum fault at the downstream location. Where it is not, zone selective interlocking, differential protection or different devices are needed, and critical circuits should be given priority.

What if there is not enough time margin?

Look first at the fault currents actually seen, because inverse curves give wider margins at lower currents. If the margin is still short, use zone selective interlocking, unit protection such as differential, current-limiting devices with tested selectivity, or a separate setting group for generator supply, rather than simply adding delay upstream.

Why recheck after changes?

Because a new transformer, an added generator, a replaced breaker or a changed setting alters the fault levels and the curves the study relied on. A study that no longer matches the plant gives false confidence. Update it whenever the sources, the devices or the settings change, and record the as-left settings after testing.

This guide gives general principles. Coordination requires a study with real data.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.