In short. Earth faults are the most common electrical faults, and they are often too small for phase overcurrent protection to see, especially on generator supply. Dedicated earth-fault protection measures the current that does not return through the phase and neutral conductors and trips on a much lower setting. How sensitive it can be, and whether it trips or only alarms, depends on how the system neutral is earthed. Most nuisance earth-fault trips on generator sites come from neutral current returning by two paths, which a four-pole changeover prevents.
Who this page is for: For electrical engineers and maintenance teams setting or troubleshooting earth-fault protection on sites with generators, transformers and changeovers.
Key facts
- Earth-fault protection measures residual current: the phase and neutral currents should add to zero in a healthy circuit.
- Sensing methods: residual connection of phase CTs, a core-balance CT, a CT in the neutral-earth link, or an RCD.
- RCDs at 30 mA protect people; 100 to 300 mA devices protect against fire.
- Solid earthing gives high earth-fault current; resistance earthing limits it and needs sensitive relays.
- Two neutral-earth links with a three-pole changeover cause false trips; a four-pole changeover prevents them.
- Never raise or disable an earth-fault setting to stop trips without finding the cause.
Why earth-fault protection is separate
A phase overcurrent device must be set above the full-load current. An earth fault through a high-resistance path, such as a damaged cable touching a damp tray or a winding touching its frame, can draw tens or hundreds of amps, well below that setting, while still causing fire, damage and dangerous touch voltages. On a generator the problem is worse, because the whole fault level is lower. A dedicated earth-fault element ignores the balanced load and responds only to current leaving the intended circuit.
How earth-fault current is sensed
| Method | Principle | Strengths | Watch for |
|---|---|---|---|
| Residual connection | Sum of three phase CTs (and the neutral CT on four-wire systems) | No extra CT; used in many ACB releases | False residual if CTs saturate or are mismatched at high phase current |
| Core-balance CT | One CT around all phase and neutral conductors | Very sensitive; ideal for feeders and motors | The cable screen earth lead must be passed back through the CT |
| Neutral CT (standby earth fault) | CT in the source neutral-to-earth connection | Sees all earth-fault current returning to that source | Only works if the neutral is earthed at that point |
| Restricted earth fault | Compares neutral CT with residual of phase CTs around a generator or transformer winding | Fast, sensitive protection for the winding itself | Needs matched CTs and a stability check. See restricted earth fault |
| Residual-current device (RCD) | Toroid in the device itself | Protects people (30 mA) and against fire (100 to 300 mA) | Leakage from many loads adds up and causes trips |
How neutral earthing changes the current
| Neutral earthing | Earth-fault current | Typical protection response |
|---|---|---|
| Solidly earthed (most LV sites) | High, comparable to phase faults | Trip quickly; easy to detect, high arc energy |
| Resistance earthed (some HT systems and large generators) | Limited to a design value, often a few hundred amps or less | Sensitive relay on the neutral resistor; trip |
| Unearthed or high impedance | Very small on the first fault | Insulation monitoring; alarm and locate rather than trip |
See earthing and neutral grounding for the arrangements in detail.
Typical settings (illustrative)
| Location | Device | Pickup | Delay |
|---|---|---|---|
| Main incomer, 1600 A ACB | Ground-fault (G) element | About 0.2 × In or a little less, for example 300 to 400 A | 0.3 to 0.4 s |
| Outgoing feeder, 400 A MCCB | Ground-fault element or core-balance relay | About 100 to 160 A | About 0.1 s (at least 0.2 s below the incomer) |
| Motor feeder | Core-balance CT relay | A few amps to tens of amps | Short, with stability against starting |
| Final circuits to sockets and wet areas | RCD | 30 mA | Instantaneous |
| Generator neutral | Standby earth fault | Below the minimum generator earth-fault current | Longest delay, as backup |
Each pickup must sit above normal leakage and unbalance, and well below the minimum earth-fault current that the circuit can see on every source. Delays step up towards the source so that the device nearest the fault trips first.
The most common problem: neutral current with two return paths
Consider a building fed from a transformer through a three-pole changeover, with the neutral shared between the transformer and a generator. If both the transformer and the generator have a neutral-earth link, the normal neutral current from single-phase loads divides: part returns along the neutral conductor and part along the earth path between the two links.
| Arrangement | What the incomer earth-fault element sees | Result |
|---|---|---|
| Three-pole changeover, two neutral-earth links | Part of the normal neutral current, perhaps 100 A or more on an unbalanced site, appears as residual current | False trips at busy times; real faults can also be partly hidden |
| Three-pole changeover, one neutral-earth link only, at the main board | Correct residual current on grid supply; on generator supply, depends on where the sensing is | Workable only with careful CT placement |
| Four-pole changeover, each source with its own link | Only true earth-fault current | Correct operation on both sources |
This is why new installations with generators normally use four-pole changeovers, including in AMF panels. See AMF panels and earthing and bonding.
Do not switch off or raise an earth-fault setting because it trips after a generator was added. Find the second neutral-earth path first; the trip is usually telling the truth about current in the earth system.
Worked example: nuisance trips after a generator was added (illustrative)
A commercial building has a 1000 kVA transformer and a 1600 A incomer with its ground-fault element set at 300 A, 0.3 s. A 500 kVA generator is added through a three-pole changeover, and its contractor fits a neutral-earth link at the generator as well as the existing one at the transformer. On hot afternoons, single-phase air-conditioning load drives up to about 800 A through the neutral.
About 40% of it, roughly 320 A, now returns through the earth path between the two links instead of the neutral conductor. The incomer’s residual measurement sees that diverted current as an earth fault, it stays above 300 A for longer than 0.3 s, and the whole building goes dark with no fault anywhere.
The fix is a four-pole changeover with each source keeping its own neutral-earth link, a re-check of the incomer CT arrangement, and secondary injection of the settings. The earth-fault element then sees only true earth current, and selectivity returns.
Earth-fault protection of the generator itself
- Standby earth fault in the generator neutral gives backup for earth faults anywhere on the generator-fed system.
- Restricted earth fault protects the stator winding and its connections quickly, and does not respond to faults outside its zone.
- Controller earth-fault functions on modern generator controllers can provide basic protection on smaller sets; check the CT arrangement they rely on.
Testing
- Secondary injection of every earth-fault element: pickup and time.
- Primary injection through the CTs where the CT wiring and polarity must be proved.
- Core-balance CT installation check, including the cable screen earth lead.
- Count the neutral-earth links and confirm each is where the design says.
- RCD trip tests at rated residual current.
- Repeat checks on generator supply, not only on grid supply.
See injection testing.
Earth-fault settings worksheet
| Location | Sensing method | Pickup (A) | Delay (s) | Minimum earth-fault current, grid (A) | Minimum earth-fault current, generator (A) |
|---|---|---|---|---|---|
| Main incomer | |||||
| Generator neutral | |||||
| Largest feeder | |||||
| Motor feeders |
Grading the stages, and where the margin comes from
Earth-fault protection is rarely a single device. On a generator installation there are usually three in series looking at the same fault, and whether the right one operates is decided by settings rather than by hardware. The example below takes a 500 kVA set at 415 V, whose full-load current is 696 A, and grades three definite-time stages against it.
| Stage | Pickup | Time delay | What it is there for | What it must not do |
|---|---|---|---|---|
| Outgoing way | 70 A, about 10% of full load | 0.1 s | Clear a fault on one circuit without disturbing the rest of the board | Pick up on the standing earth leakage of filters and drives on its own circuit |
| Board incomer | 140 A, about 20% | 0.4 s | Catch a fault on the busbar itself, or a downstream device that failed to clear | Operate before the outgoing way has been given its chance |
| Generator neutral | 210 A, about 30% | 0.7 s | Last line: a fault anywhere the other two cannot see, including the cable to the board | Trip the set for a fault a downstream device was going to clear anyway |
Two patterns in that table are worth taking rather than the numbers themselves. Pickup rises as the stage moves upstream, because an upstream device sees the leakage of everything beneath it and has to sit above the sum. Time rises in the same direction, because each stage has to wait long enough to be sure the one below it has failed rather than merely been slow.
Why the step is 0.3 seconds
The interval between stages is not a convention; it is the sum of four real quantities, and it is worth building it up once so that a site knows which of them it can shorten.
- Breaker clearing time, about 60 milliseconds. The downstream device has operated, but the fault is live until its contacts part and the arc is extinguished. The upstream relay is still seeing current throughout.
- Relay overshoot, about 50 milliseconds. The upstream relay has been timing. When the current disappears it does not stop instantly, and a relay close to its setting can still issue a trip after the fault has gone.
- Timing error, about 40 milliseconds. Two timers each accurate to a few percent can err in opposite directions, and the grading has to hold when they do.
- Safety allowance, about 100 milliseconds. For the current transformer, the wiring, the trip coil and everything measured on a test bench rather than in a hot switchroom.
Those add to roughly 250 milliseconds, and the 0.3-second step is that figure rounded up. It follows that shortening the grading interval is a measurement exercise, not a setting change: a site that needs faster clearance has to establish the real breaker and relay times for its own equipment and show the arithmetic still works, and on modern numeric relays with fast breakers it often does. Reducing the interval because the longest stage feels slow, without touching the four quantities above, removes the margin rather than the delay.
The row that causes most trouble in service is the last one. At 0.7 seconds the generator stage is deliberately the slowest device on the installation, and an engineer looking at it for the first time usually wants to speed it up. That delay is what stops a single faulty circuit taking the whole site off supply during an outage, which is the one condition the set exists for. If the generator stage is operating in practice, the fault is almost never at the generator: either a downstream stage is set too high to see its own fault, or its breaker is not clearing, and the setting that needs attention is the one that failed rather than the one that caught it.
Common mistakes
- More than one neutral-earth link with a shared neutral.
- Residual CTs of different ratios or classes.
- Core-balance CT with the screen earth not returned through the core.
- Settings proved only on grid supply.
- Disabling earth-fault protection to stop trips.
What to send us
Send the single-line diagram, the changeover type (three-pole or four-pole), where the neutral-earth links are, the relay or release settings and the trip records. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. Settings are typical starting values for illustration; final settings need a protection study and the device makers’ data.
Questions engineers ask
Why is the generator earth-fault stage the slowest on the installation?
Because it is the last device that should act. Grading it behind the board incomer and the outgoing ways is what stops one faulty circuit taking the whole site off supply during an outage, which is the condition the set exists for. If that stage is operating in service the fault is rarely at the generator: a downstream stage is set too high to see its own fault, or its breaker is not clearing.
Can the grading interval be shorter than 0.3 seconds?
Yes, if the four quantities inside it are measured rather than assumed. The usual step is breaker clearing time of about 60 milliseconds, relay overshoot of about 50, timing error of about 40 and a safety allowance of about 100, which round up to 0.3 seconds. Modern numeric relays and fast breakers can beat that, but the shorter interval has to be justified from the real equipment times, not simply set.
Why is a separate earth-fault relay needed?
Because many earth faults draw less current than the phase overcurrent pickup, especially through arcing, high-resistance paths or a resistance-earthed generator neutral. Phase elements set above load and starting current cannot see them. An earth-fault element measures residual or neutral current, which is near zero in normal service, so it can be set at a small fraction of rated current with its own delay.
What causes nuisance earth-fault trips?
Unequal CT saturation during motor starts or transformer inrush on residually connected schemes, normal leakage from filters and long cables, triplen harmonics in four-wire circuits, and neutral-earth links in more than one place so neutral current returns through earth. Core-balance CTs, a short delay, four-pole switching where the earthing needs it and a single neutral-earth link cure most of them.
Should earth faults always trip?
On solidly and low-resistance earthed low-voltage systems, yes: the fault current is large enough to be dangerous and must be cleared. On high-resistance earthed or unearthed systems the first earth fault draws only a few amperes, so it is often alarmed and located while supply continues, but a second fault on another phase becomes a phase-to-phase fault and must trip.
How can it be tested?
Secondary injection proves the relay pickup and timing. Primary injection through the CTs, or a test current passed through a core-balance CT, proves the CT ratio, polarity and wiring, which residual schemes depend on. Test with the generator neutral arrangement as well as the transformer one, because the earth-fault current and the measuring point can change with the source.
This guide gives general principles. Earth-fault design must suit your earthing system.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.