Restricted Earth-Fault Protection Guide

How restricted earth-fault protection detects winding earth faults in generators and transformers: high and low impedance schemes, CT needs, stability and setting checks.

In short. Restricted earth-fault (REF) protection compares the current in a winding’s neutral connection with the sum of its phase currents. It trips only for earth faults inside the protected winding, it is fast and sensitive, and it stays stable for faults outside. It catches low-level winding earth faults that overcurrent and ordinary earth-fault protection miss, provided its CTs are matched, correctly connected and proven.

Who this page is for: For protection engineers and commissioning teams on generators and transformers.

Key facts

  • External faults: phase CT sum equals neutral CT current, so the relay sees nothing.
  • Internal earth faults: the balance is lost and the relay trips quickly.
  • Covers earth faults within a winding, not phase-to-phase faults.
  • Very useful near the star point, where fault current is low.
  • High-impedance schemes need a stabilising resistor and a voltage limiter.
  • Stability must be proven with a through-fault or on-load test.

Principle

For an external fault, current entering the winding through the phase CTs equals the current leaving through the neutral CT, so the relay is balanced. For a fault inside the winding, the neutral carries current the phase CTs do not see in balance, and the relay operates.

Worked example: a fault near the star point (illustrative)

A 1000 kVA generator is resistance-earthed, limiting a terminal earth fault to about 300 A.

Fault position from star pointApproximate fault currentOrdinary earth fault set at 100 AREF set at 30 A
100% (terminals)300 AOperatesOperates
30%90 ADoes not operateOperates
10%30 ADoes not operateAt the limit

In a resistance-earthed winding, fault current falls roughly in proportion to distance from the star point. REF protects about 90% of the winding here; ordinary earth fault only about the outer two-thirds. See differential protection.

Do not commission REF without a stability test. A reversed or mismatched neutral CT makes it trip on external earth faults, and a shorted or open CT circuit can stop it tripping at all.

Setting and CTs

  • Use matched protection-class CTs. See protection CTs.
  • Set the stabilising resistor for the worst external fault.
  • Check sensitivity against the fault current at the chosen percentage of winding.
  • Test by primary injection and on load. See injection testing.

See earth fault and coordination.

REF settings record

ItemValue
CT ratios and class 
Setting and stabilising resistor 
Percentage of winding covered 
Stability test result 

High-impedance or low-impedance REF

Two quite different relays carry the name restricted earth fault. A high-impedance scheme connects the phase and neutral CTs in parallel across a relay with a large stabilising resistor in series, so that a CT that saturates on a through-fault cannot push enough current through the relay to trip it. A low-impedance, or biased, scheme brings each CT into a numerical relay separately and compares the currents in software, raising its threshold as the through current rises. Both work well when they are applied correctly; they ask for different things from the CTs and from the commissioning team.

FeatureHigh-impedance REFLow-impedance (biased) REF
CTsDedicated, identical ratio, low-leakage class PX with a stated knee-point voltageCan share CTs with other functions; ratios may differ and are matched in the relay
Stability on through-faultsFrom the stabilising resistor; proven by calculationFrom the bias characteristic; depends on the relay’s algorithm and CT data
Extra hardwareStabilising resistor and, often, a voltage-limiting resistorNone beyond the relay
SensitivitySet by the CT magnetising currents as much as by the relay settingSet by the relay threshold and the CT accuracy
Typical useGenerators and transformers where dedicated CTs are fittedRetrofits and numerical generator or transformer relays

Choose between them early, because the choice decides the CTs that are bought. A high-impedance scheme needs its own matched CTs, ordered with a knee-point voltage and magnetising data, and it is the more predictable of the two because its stability can be shown by a simple calculation and a primary test.

A biased scheme can reuse CTs already fitted for other protection, which often makes it the only practical choice when an existing machine is upgraded, but its stability rests on the relay’s algorithm and on CT data that must still be checked against the relay maker’s requirements. Either way, write down which scheme is used and why on the settings sheet.

Worked example: the stabilising voltage

A high-impedance scheme is designed by assuming the worst case for stability: one CT saturates completely on a through-fault while the others reproduce the current faithfully. The healthy CTs then drive the fault current through the saturated CT’s winding resistance and the connecting leads, and the voltage that appears across the relay branch must stay below the relay setting.

Take a 1000 kVA, 415 V generator with a full-load current of about 1391 A and CTs of 1500/1. Its subtransient reactance of 0.15 per unit gives a through-fault current of about 1391 ÷ 0.15, roughly 9300 A, or 6.2 A on the CT secondary.

With a CT winding resistance of 4 Ω and a lead loop of 1 Ω, the voltage across the relay branch could reach 6.2 × (4 + 1) = 31 V. A setting of 40 V gives a margin above that, and the CTs must then have a knee-point voltage of at least twice the setting: 80 V, so 100 V is a sensible specification. With a relay setting current of 0.02 A, the stabilising resistor is about 40 ÷ 0.02 = 2000 Ω, less the relay’s own small burden.

The primary operating current decides the coverage

The relay dial is not what decides how much of the winding REF protects. A real fault must drive enough current to operate the relay and also to magnetise every CT in the scheme at the setting voltage, plus whatever leaks through the voltage limiter. That total, referred to the primary, is the primary operating current.

In the example, with four CTs each drawing 0.005 A at 40 V and 0.002 A through the limiter, the primary operating current is 1500 × (0.02 + 4 × 0.005 + 0.002) = 63 A. On a generator whose earthing resistor limits a terminal fault to 300 A, the fault current falls roughly in proportion to the distance from the star point, so REF operates for faults beyond about 63 ÷ 300 = 21% of the winding from the star point and protects the outer 79%.

CTs with higher magnetising currents, or a fifth CT in the scheme, push that figure down. Ask for the magnetising curve of every CT and work out the primary operating current before accepting the coverage claimed for the scheme. See protection CTs and VTs.

When a voltage-limiting resistor is needed

On an internal fault the stabilising resistor is now in the path of a large current, and the CTs try to develop a very high voltage across it. A common estimate of the resulting peak is Vp = 2 × √(2 × Vk × (Vf − Vk)), where Vk is the knee-point voltage and Vf the voltage the full fault current would develop across the relay branch. Where Vp exceeds about 3 kV, a non-linear voltage-limiting resistor is fitted across the relay branch.

The two cases on a typical site behave very differently. On the resistance-earthed generator above, the internal fault is limited to 300 A, only 0.2 A on the secondary, so the voltage across a 2000 Ω branch stays near 400 V and the limiter is barely needed.

On the low-voltage winding of a solidly earthed 1000 kVA transformer, an earth fault can approach 27.8 kA, or about 18.5 A on the same CTs; the theoretical voltage is about 37.2 kV, and with a 100 V knee point the estimated peak is about 5445 V. That scheme needs a limiter, and the limiter’s own leakage then joins the primary operating current calculation.

Where the neutral CT goes

The neutral CT must sit so that it sees exactly the current that the phase CTs do not account for. On a generator or transformer with a neutral earthing resistor, it is placed in the neutral connection between the star point and the resistor, or in the earth side of the resistor where that is the only conductor carrying neutral current to earth.

It must not be placed so that the phase CTs and the neutral CT together enclose any other path, such as a neutral that also feeds single-phase load. Where a four-wire system carries load current in the neutral, a fourth CT on the load neutral is needed, or the scheme will see neutral load current as an earth fault. See neutral protection and neutral earthing.

Faults found at commissioning, and how they show

FaultWhat the tests showResult if missed
Neutral CT reversedThrough-fault injection operates the relay instead of leaving it stableTrips on every external earth fault
One phase CT of a different ratioSpill voltage on load and on through-fault injectionFalse trips on heavy load or external faults
Open circuit in a CT leadSpill voltage on load; that CT reads nothing on injectionFalse trip on load, or no trip for a real fault
CT secondary earthed at two pointsUnstable readings that change with other site earth currentsUnpredictable operation
Wrong stabilising resistor valueMeasured resistance differs from the designLoss of stability or of sensitivity

Earth each CT circuit at one point only, normally at the relay panel, and record where. A scheme earthed at two points can carry circulating currents from other parts of the site’s earthing and behave differently from one day to the next.

When REF is worth fitting

REF earns its place where a winding earth fault would otherwise go undetected or be cleared slowly: on resistance-earthed generators, where the current near the star point is too small for ordinary earth-fault protection; on transformers whose differential protection is not sensitive enough to see low-level earth faults; and on any machine large enough that the repair cost of a burnt core justifies a few more CTs. On a small solidly earthed set protected by a sensitive earth-fault element and a generator controller, it may add little. Make the decision with the fault current at different points of the winding in front of you, not by habit.

Commissioning REF: what proves the scheme

CheckMethodWhat it proves
CT ratio and polarityPrimary injection through each phase CT and the neutral CT in turnEach CT is the right ratio and faces the right way
Magnetising curvesSecondary excitation test on every CTKnee point and magnetising current match the design figures
Through-fault stabilityPrimary injection from a phase into the neutral outside the zoneThe relay stays stable for an external earth fault
Internal fault operationPrimary injection inside the zone, raised until the relay operatesThe measured primary operating current matches the calculation
Stabilising resistorMeasure its resistance and confirm the settingThe design value was fitted and set
On-load checkMeasure the spill voltage across the relay with the machine loadedNear zero with the plant running normally

Record the results with the settings sheet. A REF relay that has passed secondary injection only has proven the relay, not the scheme. See primary and secondary injection testing.

Common mistakes

  • No stability test.
  • Mismatched CTs.
  • Expecting REF to cover phase faults.
  • Setting too high to protect much of the winding.

What to send us

Send the earthing arrangement, CT data and relay settings. WhatsApp 98852 01608 or use the application engineering enquiry. See overcurrent.

Evidence note. Currents and coverage are illustrative; studies govern.

Questions engineers ask

How much of a generator winding does REF protect?

It depends on the primary operating current, not only on the relay setting. That current is the relay setting plus the magnetising current of every CT at the setting voltage, referred to the primary. For example, a 63 A primary operating current on a generator whose earthing resistor limits a terminal fault to 300 A protects about the outer 79% of the winding. Work it out from the CT magnetising curves before accepting a coverage figure.

What knee-point voltage do REF CTs need?

At least twice the relay setting voltage, which in turn must exceed the voltage a saturated CT could develop on a through-fault. For a 1000 kVA set with 1500/1 CTs, a through-fault of about 9300 A gives 6.2 A secondary; with 4 ohms of CT winding and a 1 ohm lead loop that is 31 V, so a 40 V setting and a knee point of 100 V are sensible.

Why use REF as well as differential?

Because earth faults close to the neutral end of a star winding drive very little phase current, often too little for a differential relay to detect. Restricted earth fault compares neutral current with residual phase current and can be set sensitively, so it covers much more of the winding for earth faults, especially where the neutral is resistance earthed.

What is a stabilising resistor?

A resistor in series with the relay in a high-impedance scheme. For a fault outside the zone, a saturated CT could otherwise drive a false current into the relay; the resistor raises the voltage needed to operate the relay above what that error can produce, so the scheme stays stable, while an internal fault still drives enough voltage to trip it.

Can REF protect a delta winding?

Not in its usual form, because a delta winding has no neutral to measure. A delta winding inside a zone can be covered for earth faults by a balanced earth-fault scheme with an earthing transformer, or by sensitive earth-fault elements on the system it supplies.

Does it work with a solidly earthed neutral?

Yes. With a solid earth the fault currents are higher, so REF detects faults further towards the neutral than on a resistance-earthed winding, and it operates very fast. Differential protection covers phase-to-phase faults that REF cannot see, so on larger machines and transformers the two are used together.

This guide gives general principles. Scheme design needs CT data and a study.