In short. Restricted earth-fault (REF) protection compares the current in a winding’s neutral connection with the sum of its phase currents. It trips only for earth faults inside the protected winding, it is fast and sensitive, and it stays stable for faults outside. It catches low-level winding earth faults that overcurrent and ordinary earth-fault protection miss, provided its CTs are matched, correctly connected and proven.
Who this page is for: For protection engineers and commissioning teams on generators and transformers.
Key facts
- External faults: phase CT sum equals neutral CT current, so the relay sees nothing.
- Internal earth faults: the balance is lost and the relay trips quickly.
- Covers earth faults within a winding, not phase-to-phase faults.
- Very useful near the star point, where fault current is low.
- High-impedance schemes need a stabilising resistor and a voltage limiter.
- Stability must be proven with a through-fault or on-load test.
Principle
For an external fault, current entering the winding through the phase CTs equals the current leaving through the neutral CT, so the relay is balanced. For a fault inside the winding, the neutral carries current the phase CTs do not see in balance, and the relay operates.
Worked example: a fault near the star point (illustrative)
A 1000 kVA generator is resistance-earthed, limiting a terminal earth fault to about 300 A.
| Fault position from star point | Approximate fault current | Ordinary earth fault set at 100 A | REF set at 30 A |
|---|---|---|---|
| 100% (terminals) | 300 A | Operates | Operates |
| 30% | 90 A | Does not operate | Operates |
| 10% | 30 A | Does not operate | At the limit |
In a resistance-earthed winding, fault current falls roughly in proportion to distance from the star point. REF protects about 90% of the winding here; ordinary earth fault only about the outer two-thirds. See differential protection.
Do not commission REF without a stability test. A reversed or mismatched neutral CT makes it trip on external earth faults, and a shorted or open CT circuit can stop it tripping at all.
Setting and CTs
- Use matched protection-class CTs. See protection CTs.
- Set the stabilising resistor for the worst external fault.
- Check sensitivity against the fault current at the chosen percentage of winding.
- Test by primary injection and on load. See injection testing.
See earth fault and coordination.
REF settings record
| Item | Value |
|---|---|
| CT ratios and class | |
| Setting and stabilising resistor | |
| Percentage of winding covered | |
| Stability test result |
High-impedance or low-impedance REF
Two quite different relays carry the name restricted earth fault. A high-impedance scheme connects the phase and neutral CTs in parallel across a relay with a large stabilising resistor in series, so that a CT that saturates on a through-fault cannot push enough current through the relay to trip it. A low-impedance, or biased, scheme brings each CT into a numerical relay separately and compares the currents in software, raising its threshold as the through current rises. Both work well when they are applied correctly; they ask for different things from the CTs and from the commissioning team.
| Feature | High-impedance REF | Low-impedance (biased) REF |
|---|---|---|
| CTs | Dedicated, identical ratio, low-leakage class PX with a stated knee-point voltage | Can share CTs with other functions; ratios may differ and are matched in the relay |
| Stability on through-faults | From the stabilising resistor; proven by calculation | From the bias characteristic; depends on the relay’s algorithm and CT data |
| Extra hardware | Stabilising resistor and, often, a voltage-limiting resistor | None beyond the relay |
| Sensitivity | Set by the CT magnetising currents as much as by the relay setting | Set by the relay threshold and the CT accuracy |
| Typical use | Generators and transformers where dedicated CTs are fitted | Retrofits and numerical generator or transformer relays |
Choose between them early, because the choice decides the CTs that are bought. A high-impedance scheme needs its own matched CTs, ordered with a knee-point voltage and magnetising data, and it is the more predictable of the two because its stability can be shown by a simple calculation and a primary test.
A biased scheme can reuse CTs already fitted for other protection, which often makes it the only practical choice when an existing machine is upgraded, but its stability rests on the relay’s algorithm and on CT data that must still be checked against the relay maker’s requirements. Either way, write down which scheme is used and why on the settings sheet.
Worked example: the stabilising voltage
A high-impedance scheme is designed by assuming the worst case for stability: one CT saturates completely on a through-fault while the others reproduce the current faithfully. The healthy CTs then drive the fault current through the saturated CT’s winding resistance and the connecting leads, and the voltage that appears across the relay branch must stay below the relay setting.
Take a 1000 kVA, 415 V generator with a full-load current of about 1391 A and CTs of 1500/1. Its subtransient reactance of 0.15 per unit gives a through-fault current of about 1391 ÷ 0.15, roughly 9300 A, or 6.2 A on the CT secondary.
With a CT winding resistance of 4 Ω and a lead loop of 1 Ω, the voltage across the relay branch could reach 6.2 × (4 + 1) = 31 V. A setting of 40 V gives a margin above that, and the CTs must then have a knee-point voltage of at least twice the setting: 80 V, so 100 V is a sensible specification. With a relay setting current of 0.02 A, the stabilising resistor is about 40 ÷ 0.02 = 2000 Ω, less the relay’s own small burden.
The primary operating current decides the coverage
The relay dial is not what decides how much of the winding REF protects. A real fault must drive enough current to operate the relay and also to magnetise every CT in the scheme at the setting voltage, plus whatever leaks through the voltage limiter. That total, referred to the primary, is the primary operating current.
In the example, with four CTs each drawing 0.005 A at 40 V and 0.002 A through the limiter, the primary operating current is 1500 × (0.02 + 4 × 0.005 + 0.002) = 63 A. On a generator whose earthing resistor limits a terminal fault to 300 A, the fault current falls roughly in proportion to the distance from the star point, so REF operates for faults beyond about 63 ÷ 300 = 21% of the winding from the star point and protects the outer 79%.
CTs with higher magnetising currents, or a fifth CT in the scheme, push that figure down. Ask for the magnetising curve of every CT and work out the primary operating current before accepting the coverage claimed for the scheme. See protection CTs and VTs.
When a voltage-limiting resistor is needed
On an internal fault the stabilising resistor is now in the path of a large current, and the CTs try to develop a very high voltage across it. A common estimate of the resulting peak is Vp = 2 × √(2 × Vk × (Vf − Vk)), where Vk is the knee-point voltage and Vf the voltage the full fault current would develop across the relay branch. Where Vp exceeds about 3 kV, a non-linear voltage-limiting resistor is fitted across the relay branch.
The two cases on a typical site behave very differently. On the resistance-earthed generator above, the internal fault is limited to 300 A, only 0.2 A on the secondary, so the voltage across a 2000 Ω branch stays near 400 V and the limiter is barely needed.
On the low-voltage winding of a solidly earthed 1000 kVA transformer, an earth fault can approach 27.8 kA, or about 18.5 A on the same CTs; the theoretical voltage is about 37.2 kV, and with a 100 V knee point the estimated peak is about 5445 V. That scheme needs a limiter, and the limiter’s own leakage then joins the primary operating current calculation.
Where the neutral CT goes
The neutral CT must sit so that it sees exactly the current that the phase CTs do not account for. On a generator or transformer with a neutral earthing resistor, it is placed in the neutral connection between the star point and the resistor, or in the earth side of the resistor where that is the only conductor carrying neutral current to earth.
It must not be placed so that the phase CTs and the neutral CT together enclose any other path, such as a neutral that also feeds single-phase load. Where a four-wire system carries load current in the neutral, a fourth CT on the load neutral is needed, or the scheme will see neutral load current as an earth fault. See neutral protection and neutral earthing.
Faults found at commissioning, and how they show
| Fault | What the tests show | Result if missed |
|---|---|---|
| Neutral CT reversed | Through-fault injection operates the relay instead of leaving it stable | Trips on every external earth fault |
| One phase CT of a different ratio | Spill voltage on load and on through-fault injection | False trips on heavy load or external faults |
| Open circuit in a CT lead | Spill voltage on load; that CT reads nothing on injection | False trip on load, or no trip for a real fault |
| CT secondary earthed at two points | Unstable readings that change with other site earth currents | Unpredictable operation |
| Wrong stabilising resistor value | Measured resistance differs from the design | Loss of stability or of sensitivity |
Earth each CT circuit at one point only, normally at the relay panel, and record where. A scheme earthed at two points can carry circulating currents from other parts of the site’s earthing and behave differently from one day to the next.
When REF is worth fitting
REF earns its place where a winding earth fault would otherwise go undetected or be cleared slowly: on resistance-earthed generators, where the current near the star point is too small for ordinary earth-fault protection; on transformers whose differential protection is not sensitive enough to see low-level earth faults; and on any machine large enough that the repair cost of a burnt core justifies a few more CTs. On a small solidly earthed set protected by a sensitive earth-fault element and a generator controller, it may add little. Make the decision with the fault current at different points of the winding in front of you, not by habit.
Commissioning REF: what proves the scheme
| Check | Method | What it proves |
|---|---|---|
| CT ratio and polarity | Primary injection through each phase CT and the neutral CT in turn | Each CT is the right ratio and faces the right way |
| Magnetising curves | Secondary excitation test on every CT | Knee point and magnetising current match the design figures |
| Through-fault stability | Primary injection from a phase into the neutral outside the zone | The relay stays stable for an external earth fault |
| Internal fault operation | Primary injection inside the zone, raised until the relay operates | The measured primary operating current matches the calculation |
| Stabilising resistor | Measure its resistance and confirm the setting | The design value was fitted and set |
| On-load check | Measure the spill voltage across the relay with the machine loaded | Near zero with the plant running normally |
Record the results with the settings sheet. A REF relay that has passed secondary injection only has proven the relay, not the scheme. See primary and secondary injection testing.
Common mistakes
- No stability test.
- Mismatched CTs.
- Expecting REF to cover phase faults.
- Setting too high to protect much of the winding.
What to send us
Send the earthing arrangement, CT data and relay settings. WhatsApp 98852 01608 or use the application engineering enquiry. See overcurrent.
Evidence note. Currents and coverage are illustrative; studies govern.
Questions engineers ask
How much of a generator winding does REF protect?
It depends on the primary operating current, not only on the relay setting. That current is the relay setting plus the magnetising current of every CT at the setting voltage, referred to the primary. For example, a 63 A primary operating current on a generator whose earthing resistor limits a terminal fault to 300 A protects about the outer 79% of the winding. Work it out from the CT magnetising curves before accepting a coverage figure.
What knee-point voltage do REF CTs need?
At least twice the relay setting voltage, which in turn must exceed the voltage a saturated CT could develop on a through-fault. For a 1000 kVA set with 1500/1 CTs, a through-fault of about 9300 A gives 6.2 A secondary; with 4 ohms of CT winding and a 1 ohm lead loop that is 31 V, so a 40 V setting and a knee point of 100 V are sensible.
Why use REF as well as differential?
Because earth faults close to the neutral end of a star winding drive very little phase current, often too little for a differential relay to detect. Restricted earth fault compares neutral current with residual phase current and can be set sensitively, so it covers much more of the winding for earth faults, especially where the neutral is resistance earthed.
What is a stabilising resistor?
A resistor in series with the relay in a high-impedance scheme. For a fault outside the zone, a saturated CT could otherwise drive a false current into the relay; the resistor raises the voltage needed to operate the relay above what that error can produce, so the scheme stays stable, while an internal fault still drives enough voltage to trip it.
Can REF protect a delta winding?
Not in its usual form, because a delta winding has no neutral to measure. A delta winding inside a zone can be covered for earth faults by a balanced earth-fault scheme with an earthing transformer, or by sensitive earth-fault elements on the system it supplies.
Does it work with a solidly earthed neutral?
Yes. With a solid earth the fault currents are higher, so REF detects faults further towards the neutral than on a resistance-earthed winding, and it operates very fast. Differential protection covers phase-to-phase faults that REF cannot see, so on larger machines and transformers the two are used together.
This guide gives general principles. Scheme design needs CT data and a study.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.