In short. Generators running in parallel must share real power (kW) in proportion to their ratings and share reactive power (kVAr) without fighting each other. Governors set the kW share; voltage regulators set the kVAr share. Droop gives simple, robust sharing with a frequency that falls slightly with load; isochronous load sharing holds frequency constant using communication between controllers. A power management system adds the plant-level decisions: when to start and stop sets, how much reserve to hold, and which loads to shed when capacity is lost.
Who this page is for: For plant engineers, commissioning engineers and consultants running two or more generators in parallel, and for anyone whose sets do not share load evenly.
Key facts
- With droop, each set’s load is set by its droop and no-load frequency; equal droop and equal no-load frequency share kW in proportion to rating.
- Typical droop is 3 to 5% from no load to full load.
- Mismatched droop gives unequal sharing; mismatched voltage settings give circulating kVAr.
- Isochronous load sharing holds frequency at 50 Hz but depends on the controller link; it needs a safe fallback.
- Spinning reserve must cover the largest load step or the loss of the largest running set.
- Commission sharing at low, mid and high load with a load bank.
Sharing real power (kW)
| Method | How it works | Notes |
|---|---|---|
| Droop | Each governor lowers speed slightly as load rises; the sets settle at a shared frequency | Simple, no communication; frequency varies with load |
| Isochronous with load-share link | Controllers exchange load data and hold frequency constant | Standard for island plants; needs a fallback if the link fails |
| Digital communication | Controllers share data over a network | Flexible and supports power management |
| Base load | One set holds a fixed output | Used when paralleled with the utility |
Worked example: what mismatched droop does (illustrative)
Two 500 kVA (400 kW) sets share a 600 kW load. Both have the same no-load frequency of 50 Hz (in practice it is usually set higher, so that full load sits near 50 Hz).
| Case | Working | Set A | Set B | Frequency |
|---|---|---|---|---|
| Both at 4% droop | Equal droop, equal rating | 300 kW (75%) | 300 kW (75%) | About 48.5 Hz |
| A at 5%, B at 3% | 5 × PA = 3 × PB, PA + PB = 600 | 225 kW (56%) | 375 kW (94%) | About 48.6 Hz |
With mismatched droop, set B runs near full load while set A is only just over half loaded. A further 50 kW step would push B into overload while A still has spare capacity. Matching the droop, or switching to isochronous sharing, restores equal loading. See kW and kVAr sharing.
Sharing reactive power (kVAr)
If one voltage regulator is set slightly higher than another, its set pushes reactive current into the other. The result is circulating kVAr: both sets show higher current than the load explains, power factors move in opposite directions, and alternators run hot. Voltage droop or cross-current compensation makes the regulators share kVAr. Symptoms to watch for are unequal power factors between sets at the same kW, and current that does not fall when load is removed.
Do not judge sharing by kW alone. Two sets can share kW perfectly while circulating large reactive current between them, overheating both alternators. Check kW, kVAr and current on every set.
Power management functions
| Function | Typical rule |
|---|---|
| Load-dependent start | Start the next set when load exceeds about 80% of running capacity for a set time |
| Load-dependent stop | Stop a set when the remaining sets would be loaded below about 60 to 70%, after a minimum run time |
| Spinning reserve | Keep online capacity above load at least equal to the largest step or the largest running set |
| Load shedding | Drop non-essential loads in priority order if a set trips. See load shedding |
| Fault response | Start a standby set when a running set fails |
| Run-hour balancing | Rotate the lead set to even out wear |
Plant example: mixed ratings
A plant has three 1000 kVA sets and one 500 kVA set. With proportional sharing, the 500 kVA set carries half the load of each larger set. At light load one large set runs; the next starts when load passes 80% of running capacity, about 800 kVA with one 1000 kVA set running. A reserve rule keeps enough capacity online to absorb the largest motor start without dropping frequency below the shedding threshold.
Commissioning steps
- Check governor and voltage regulator settings and droop on each set.
- Test sharing at low, mid and high load with a load bank.
- Test load steps and the trip of one running set.
- Break the controller link and confirm the fallback to droop or a safe mode.
- Verify load-shedding priorities and timings.
- Record the settings and results.
Troubleshooting
| Symptom | Likely cause |
|---|---|
| Unequal kW at the same rating | Mismatched droop or speed settings; load-share link fault |
| Unequal power factors, high current | Circulating kVAr from voltage settings or missing compensation |
| Hunting between sets | Governor tuning conflict |
| Sets start too late on load rise | Start threshold or delay set too high |
Paralleling worksheet
Two 500 kVA sets and one 1010 kVA set on a common bus, recorded at a 905 kW test load before and after commissioning. The first three rows are as found; the last three are the same plant after the droop and voltage settings were matched.
| Set | kVA | Droop (%) | kW at test load | kVAr at test load | Current (A) |
|---|---|---|---|---|---|
| Set A, as found | 500 | 4.0 | 180 | 265 | 446 |
| Set B, as found | 500 | 3.0 | 240 | 110 | 367 |
| Set C, as found | 1010 | 3.0 | 485 | 304 | 796 |
| Set A, as left | 500 | 3.0 | 225 | 169 | 391 |
| Set B, as left | 500 | 3.0 | 225 | 169 | 391 |
| Set C, as left | 1010 | 3.0 | 455 | 341 | 791 |
Look at Set A as found. It is carrying the least real power of the three — 180 kW against its 400 kW capability — and drawing 446 A, more than Set B at 240 kW. That combination is impossible from real load alone, and it is the signature of circulating reactive current: Set A’s voltage was set about half a percent high, so it was supplying 265 kVAr where its share was 169, and the surplus was flowing round the bus into the other two machines doing no useful work at all.
Two separate faults were present, and they are adjusted in different places. The kW imbalance came from Set A’s 4% droop against the others’ 3%: a set with more droop sheds load at any given frequency, so A sat at 45% of its rating while B and C sat at 60% of theirs. That is a governor setting. The kVAr imbalance came from the voltage setting, which is a regulator adjustment, and it does not appear on a kW meter at all.
After matching, each set carries load in proportion to its rating: 225, 225 and 455 kW against capabilities of 400, 400 and 808 kW — all three at 56% — and the reactive power follows in the same proportion. Set A’s current has fallen from 446 A to 391 A while its useful output has risen from 180 kW to 225 kW. That is the whole value of the exercise: the same plant, 55 A less current in one alternator, and 45 kW more work out of it.
Worked example: setting droop so full load sits at 50 Hz (illustrative)
With droop, frequency falls as load rises, so the no-load frequency is set high enough that full load arrives at 50 Hz. Using the droop relation on this page, f = fno-load × (1 − droop × P ÷ Prated):
| Item | Working | Result |
|---|---|---|
| No-load frequency for 4% droop | 50 ÷ (1 − 0.04) | about 52.08 Hz |
| Frequency at 75% load | 52.08 × (1 − 0.04 × 0.75) | about 50.52 Hz |
| Frequency at full load | 52.08 × (1 − 0.04) | 50.0 Hz |
| Frequency at no load | As set | 52.08 Hz |
Every set on the bus needs the same droop and the same no-load frequency for its rating; one set left at 50 Hz no-load would carry almost nothing while the others carried the plant. Where the load connected cannot accept a 2 Hz swing, use isochronous sharing, or let the power management system trim the speed setting of all sets together so frequency returns to 50 Hz after each change.
Worked example: what half a percent of voltage does (illustrative)
Two 500 kVA sets share reactive power through voltage droop set at 4% at rated kVA. If one regulator is set 0.5% higher than the other, the difference in reactive output between them is about 0.005 ÷ 0.04 × 500 ≈ 62.5 kVAr: the high set carries about 31 kVAr more than its share and the low set about 31 kVAr less. Neither set’s kW changes, so a kW meter shows nothing wrong, but the high set’s current and temperature rise. Halving the droop doubles the circulating kVAr for the same setting error, which is why reactive droop should not be set so low that small calibration differences dominate.
Worked example: how many sets to run (illustrative)
A plant has three 1000 kVA sets, each 800 kW, and the rule is that losing any one running set must not require load shedding of essential loads.
| Sets running | Capacity | Capacity after losing one | Highest load that keeps the rule |
|---|---|---|---|
| 2 | 1600 kW | 800 kW | 800 kW |
| 3 | 2400 kW | 1600 kW | 1600 kW |
At a 1200 kW load, two sets carry it at 75% each, which looks comfortable, but the loss of one leaves 800 kW against 1200 kW. Either a third set runs, or load shedding must remove at least 400 kW within the first fraction of a second, before frequency falls to the under-frequency trip of the remaining set. Write the rule into the power management settings as a start threshold, here 800 kW with two sets, rather than leaving it to judgement.
Under-frequency load shedding in stages
- Stage one: the least important loads, at a frequency just below the normal droop range, with a short delay.
- Stage two: the next group, about half a hertz lower.
- Stage three: the last non-essential group, above the generator under-frequency trip with a clear margin.
- Direct shedding: where a set trip is detected from its breaker, shed the calculated amount at once rather than waiting for frequency to fall.
Stages must sit above the generator’s own under-frequency protection, or the protection trips the remaining sets before shedding has finished. See under and over voltage and frequency protection.
Mixed makes, sizes and ages
Steady sharing can be correct while transient sharing is poor. A set with a fast electronic governor picks up a load step before an older set with a slower governor, so for a few seconds it carries more than its share and may trip on overload or reverse power. Match governor response where possible, test sharing during steps as well as at steady load, and set protection delays to ride through the transient differences. Where controllers of different makes share load, confirm that their load-share signals are compatible and scaled correctly before the first parallel run.
Common mistakes
- Different droop settings between sets.
- No fallback when the sharing link fails.
- Starting extra sets too late for load growth.
- Checking kW sharing but not kVAr.
What to send us
Send the generator list, load profile, controller details and readings of kW, kVAr and current per set. WhatsApp 98852 01608 or use the enquiry form. See also load-sharing controls.
Evidence note. Droop figures and thresholds are typical values for illustration; controller and engine makers’ data govern.
Questions engineers ask
How much spinning reserve should a generator plant hold?
Enough that losing the largest running set does not overload the rest, unless fast load shedding is designed to cover the gap. With three 800 kW sets, two running can carry 1600 kW but only 800 kW after losing one; at a 1200 kW load either a third set runs or shedding must remove at least 400 kW within a fraction of a second.
What no-load frequency gives 50 Hz at full load with 4% droop?
About 52.08 Hz, from 50 divided by 0.96. The set then runs at about 50.52 Hz at 75% load and 50.0 Hz at full load. Every set sharing load by droop needs the same droop and no-load frequency, or the set left at a lower no-load frequency carries less than its share.
Why do my generators not share equally?
Real power sharing is set by the governors, so unequal kW usually means mismatched droop or no-load speed settings, or a fault in the load-share link. Unequal current or power factor at equal kW points to the voltage regulators instead: mismatched voltage settings or missing reactive droop cause circulating kVAr. Measure kW, kVAr and current on every set at several loads to tell them apart.
Is droop or isochronous better?
Droop is simple and robust and needs no communication, but frequency falls as load rises unless the speed settings are trimmed. Isochronous load sharing holds 50 Hz at every load and suits island plants with frequency-sensitive loads, but it depends on the controller link, so it needs a tested fallback to droop when the link fails.
What is spinning reserve?
Capacity that is running and connected but not loaded, held to absorb a load step or the loss of a running set. A common rule is that it should at least equal the largest running set, so one set can trip without load shedding. Where that costs too much fuel, fast load shedding is designed to cover the gap instead.
What happens if the network between controllers fails?
A well designed plant detects the loss of the load-share link and falls back to droop sharing, so the sets keep sharing load at a slightly varying frequency. Without a fallback the sets can drift apart, one taking most of the load and another motoring. Test the fallback at commissioning by breaking the link with the plant on load.
This guide gives general principles. Settings need testing on the actual plant.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.