Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Breaker Interlocking and Transfer Logic Guide

How mechanical, electrical and key interlocks and transfer logic prevent unsafe paralleling and dead-bus closing, with typical schemes for multi-source boards and their tests.

In short. Interlocking makes unsafe switching impossible, not merely unlikely. Transfer logic decides which breaker closes when a source fails. Together they stop two sources being connected by mistake, protect people during maintenance and make every transfer predictable. Use more than one layer (mechanical, electrical and key interlocks) so that one failure does not defeat the protection.

Who this page is for: For electrical engineers, panel builders and maintenance teams designing or checking changeovers and multi-source switchboards.

Key facts

  • Mechanical interlocks work without control power.
  • Electrical interlocks use auxiliary contacts in the closing circuit.
  • Key interlocks enforce a sequence across separate panels.
  • Logic interlocks in software must never be the only layer.
  • Test every interlock at commissioning and after any change.
  • A defeated interlock is a hidden fault until the day it matters.

Types of interlock

TypeHow it worksPoint
MechanicalLinkages stop one breaker closing if another is closedIndependent of control power
ElectricalAuxiliary contacts in the closing circuitFlexible; depends on wiring and supply
KeyA key released by one device is needed to operate anotherWorks across panels and buildings
LogicController program blocks the close commandUseful as an extra layer only

Worked example: a main-tie-main board (illustrative)

The board has two bus sections joined by a tie. Bus A is fed by transformer incomer 1. Bus B is fed by transformer incomer 2 or by a generator incomer in the same panel.

RuleMechanicalElectricalKey
Never all three breakers closed (two sources in parallel) YesTwo keys for three breakers
Generator incomer and transformer incomer 2 never closed together on bus BYes (same panel)Yes 
Earth switch only when the incomer is open and racked out  Yes

With two keys for three breakers, only two can be closed at once, whatever the control system does. At commissioning, each combination was attempted and blocked. See commissioning.

Never bypass or defeat an interlock to “get the supply back”. An out-of-phase close or a backfeed into a line being worked on can kill people and destroy equipment.

Transfer logic

Transfer logic decides the order of opening and closing when a source fails or returns, with delays and permissives. See ATS and AMF logic, AMF basics and changeover switchgear.

Related: coordination, overcurrent and earth fault.

Interlock test sheet

Combination attemptedShould beResultLayer that blocked it
 Blocked  
 Blocked  
 Allowed  

Worked example: how many breaker combinations must be tested

An interlocking scheme is only proven when every forbidden combination of breaker positions has been attempted and blocked. The number of combinations grows quickly. Take the main-tie-main board above with four breakers: incomer 1, the tie, incomer 2 and the generator incomer, each open or closed. That is 2 × 2 × 2 × 2 = 16 combinations. Three rules forbid paralleling sources: incomer 2 and the generator never together; incomer 1, the tie and incomer 2 never together; and incomer 1, the tie and the generator never together.

Working through all 16 leaves 10 allowed and 6 forbidden. Each of the 6 forbidden states must be attempted at commissioning, by every route that can close a breaker: local push-button, remote command, automatic logic and, where possible, manual mechanism. Write the 16 states as a table on the test sheet and tick each one, rather than testing the handful of combinations that come to mind.

Interlocks on withdrawable breakers

InterlockWhat it prevents
Racking only with the breaker openDrawing an arc by racking a closed breaker on or off the busbar
Closing only in the service or test positionClosing a breaker that is part-way between positions
Automatic shutters over the busbar spoutsTouching live busbar contacts when the breaker is withdrawn
Earth switch only with the breaker withdrawnEarthing a live circuit through the breaker
Door interlockOpening the compartment with the breaker in service, unless deliberately defeated by authorised staff

These interlocks are built into the switchgear and are easy to take for granted. Check them at every maintenance visit: a shutter that sticks open or a racking interlock that has been bent to make racking easier removes a protection that people rely on without knowing it.

Wiring electrical interlocks so they fail safe

An electrical interlock places a normally closed auxiliary contact of breaker A, closed only when A is open, in the closing circuit of breaker B. Three details decide whether it can be trusted. The contact must open as soon as A starts to close, not at the end of its travel, so use an early-acting contact where the breaker offers one.

The arrangement must fail safe: loss of control power, a broken wire or a removed fuse must leave B unable to close, never able to close freely. And because a single contact can weld or stick, critical interlocks between sources should have a second, independent layer, mechanical or key, so that one contact failure does not defeat them. See electrical interlocking and permissive logic.

A trapped-key sequence for safe maintenance

Trapped-key systems enforce an order of operations across panels that may be in different rooms. A typical sequence for working on an outgoing feeder cable is shown below; each key can be released only when the step before it has been completed.

  1. Open the feeder breaker; its key is released and the breaker is locked open.
  2. Use that key to rack the breaker out; a second key is released only in the racked-out position.
  3. Use the second key at the earth switch, which can then be closed; a third key is released with the earth switch closed.
  4. Use the third key to open the cable compartment door.
  5. To restore, reverse the sequence: the door must be closed to recover the key that allows the earth switch to open, and so on back to the breaker.

Keep spare keys under the control of the authorised person, never in the panel or on a hook beside it, and record every use of a spare.

Transfer timing with interlocks in the loop

An open-transition transfer between two breakers is a sequence: open the first, confirm it has opened, wait, close the second. The confirmation comes from the first breaker’s auxiliary contact, and the second breaker’s closing circuit is interlocked on that same contact.

With a breaker that opens in about 50 ms and an auxiliary contact that changes state about 20 ms later, the earliest the second breaker can close is around 70 ms after the open command, plus any deliberate delay for motor residual voltage, typically 1 to 3 seconds where motors are connected. A controller that issues both commands at once, relying on the interlock to hold the second back, wears the closing mechanism and leaves the timing to chance; sequence the commands and let the interlock be the safeguard, not the timer.

Interlocks between panels in different rooms

When the utility incomer is in the main switchboard and the generator breaker is in a synchronising panel in the generator room, a mechanical interlock is impossible and an electrical interlock needs a cable between the two. That cable must be routed and protected so that its loss is detected: a broken interlock cable that simply removes a closing permission is safe, but one that removes a blocking signal is not. Where the two breakers must never be closed together, use a trapped-key scheme between the rooms as the independent layer, so the protection does not depend on a single cable.

An interlock schedule for a two-source board

Breaker to closeMust be openLayersOverride
Utility incomerGenerator incomerMechanical, electricalNone
Generator incomerUtility incomerMechanical, electricalClosed transition only, through sync check and a time limit
Bus tieOne of the two incomersElectrical, keyNone
Earth switchIncomer racked outMechanical, keyNone

Where closed transition is used, the interlock between the two incomers must be overridden for a fraction of a second, and only through a synchronising check and a timer that opens one source if the overlap lasts too long. That override is the most safety-critical part of the scheme and needs its own test record.

Retesting after changes

Interlocks are often broken by work done for another reason: a breaker replaced with a different model whose auxiliary contacts are wired differently, a new feeder added to a board, or a controller reprogrammed. Treat any change to a breaker, its control wiring or the transfer logic as a reason to repeat the interlock test for every combination involving that breaker, and keep the completed test table with the board’s records.

Interlocks for generator-to-generator transfer

Sites with a duty and a standby set, each able to feed the same load through its own breaker, need the same discipline as a utility-to-generator changeover. The two generator breakers must never close together unless the sets are synchronised, so the interlock blocks the second breaker until the first is confirmed open, or until the synchronising check permits paralleling. A transfer between running sets for maintenance is best done by synchronising, sharing and then unloading the outgoing set, which avoids any break; where the sets cannot be synchronised, the transfer is open, with the same timing and residual-voltage considerations as any other. See generator-to-generator transfer.

Labelling and operator training

Interlocks prevent wrong operations, but people still have to know the right ones. Label every breaker, key and interlock with plain names that match the single-line diagram on the panel door, show the key sequence on a diagram beside the key exchange, and train every person allowed to operate the board on the sequence and on what to do when an interlock blocks them. An operator who understands why a breaker will not close calls for help; one who does not looks for a way round it.

Controlling interlock defeat

There are legitimate reasons to defeat an interlock, for example testing a breaker in a test position with its partner closed. Every such case should require a dedicated defeat key or a switch under lock, be recorded in a log with the name of the person, the time and the reason, and be reversed before the work permit is closed. An interlock bypassed with a jumper wire “for now” is the commonest single cause of out-of-phase closures and backfeeds found in investigations.

Common mistakes

  • Software interlock as the only layer.
  • Spare keys left in the lock.
  • Interlocks not tested after modifications.
  • Bypass links left in place.

What to send us

Send the single-line diagram and the switching rules you need. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. The scheme is illustrative.

Questions engineers ask

How many breaker combinations need interlock testing?

All of them that are forbidden. With four breakers, each open or closed, there are 16 combinations; on a main-tie-main board with a generator incomer, the rules against paralleling sources forbid 6 of them. Each forbidden state should be attempted by every route that can close a breaker: local, remote, automatic and manual. Write all 16 states on the test sheet and tick each one.

Why must an electrical interlock fail safe?

Because a loss of control power, a broken wire or a removed fuse must leave the protected breaker unable to close, never free to close. Wire a normally closed auxiliary contact of the other breaker into the closing circuit so that any open circuit blocks closing, use early-acting contacts where available, and back up critical interlocks with a mechanical or key layer in case a contact welds.

Why do I need both mechanical and electrical interlocks?

Because they fail differently. A mechanical interlock works without control power and cannot be defeated by a wiring or software fault, but it only links breakers mounted together. Electrical interlocks link breakers anywhere and add logic, but depend on control power and correct wiring. Using both means a single failure of either cannot parallel two sources that must never be paralleled.

What is a trapped-key system?

An interlock using keys that are held captive in locks on switches, breakers or doors, released only when the equipment is in a safe state. Because one key cannot be in two places, the sequence is enforced: for example, the key that allows the generator breaker to close is released only when the mains breaker is locked open.

Can interlocks be bypassed?

Only under a controlled procedure with written authorisation, a defined reason, extra precautions and a time limit, and never as a routine way to get a transfer working. Bypass facilities should be key-controlled and logged. An interlock left bypassed after the work is a common cause of out-of-phase closes and back-feeds.

How often should they be tested?

At commissioning, after any change to the switchgear, wiring or logic, and periodically, commonly once a year, by trying every forbidden operation and confirming it is blocked, as well as every permitted one. Record the results; an interlock is only known to work if it has been tested in the forbidden direction.

This guide gives general principles. Follow local safety rules and standards.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.