In short. Remote monitoring shows the state of generators, breakers and protection to people who are not on site. A good design chooses meaningful points, uses open protocols, sends only alarms that need action, and builds in security. It keeps local control working if the link fails. The most valuable remote alarms are the ones that warn before an outage: generator not in auto, low fuel, charger failure, low battery.
Who this page is for: For facility managers, maintenance teams and owners who want to watch generator and switchgear status from a control room or phone.
Key facts
- Monitor readiness, not just running status: mode, fuel, battery, charger, alarms.
- Use open protocols so devices from different makers integrate.
- Alarms must be prioritised; floods hide the important one.
- Remote monitoring must not be needed for local control.
- Secure the link: no direct internet exposure of controllers.
- Show loss of communication clearly; stale data is not live data.
What to monitor
| Equipment | Points |
|---|---|
| Generator | Running, mode, voltage, current, kW, kVAr, frequency, fuel level, oil pressure, coolant temperature, battery voltage, run hours, alarms |
| Switchgear | Breaker positions, trip and alarm status, protection operations, DC supply, temperatures |
| Power quality | Voltage, distortion, unbalance, power factor |
Worked example: alarms that prevented outages (illustrative)
| Remote alarm | What it caught | Outcome |
|---|---|---|
| Generator not in AUTO | Left in MANUAL after a service | Returned to AUTO the same day |
| Battery charger failed | Starting battery would have run down over days | Charger replaced before the next outage |
| Fuel below 40% | A missed delivery | Delivery arranged before a long outage |
| Communication lost | Site router failure | Shown as “no data”, not as healthy |
A first version sent every event as an alarm to a phone, about 60 a day; staff stopped reading them. Reducing to readiness and trip alarms, with priorities, meant each one was acted on. See alarms and records.
Do not expose generator or breaker controllers directly to the internet for remote monitoring. Use a secured gateway, and make sure the site runs normally if the link is lost.
Design points
- A point list with owners and priorities.
- Open protocols through a gateway.
- Alarm priorities and escalation.
- Comms-fail and stale-data indication.
- Security: segmented network, named accounts.
See communications and remote monitoring.
Remote monitoring point list
| Point | Alarm priority | Who is notified | Action expected |
|---|---|---|---|
| Generator not in AUTO | |||
| Fuel low | |||
| Charger or battery fault | |||
| Breaker trip |
Worked example: how fresh is the data on the screen?
Most generator controllers and power-monitoring instruments are read over Modbus, and the time it takes to read them sets how old the data on the screen can be. Take a serial Modbus RTU link at 9600 baud, where each byte takes 11 bits on the line. Reading a block of 40 registers takes an 8-byte request and an 85-byte reply: 93 bytes, or about 93 × 11 ÷ 9600 ≈ 0.107 s. With about 50 ms of turnaround in each device, one block takes around 0.16 s.
A plant of three generators, each read in three blocks, takes 9 × 0.16 ≈ 1.4 s per complete scan before any breaker or meter on the same link is read. That is fine for trends and readiness alarms, too slow for anything that must act within a second, and it explains why a breaker trip can appear on the screen a second or two after it happened. Faster links, Ethernet gateways or reading only what each screen needs all shorten the cycle. See industrial power communications.
The readiness screen: five things that predict a failed start
| Item | Healthy | Why it matters |
|---|---|---|
| Controller mode | Automatic | A set left in manual or off will not start on a mains failure |
| Starting battery voltage and charger status | Normal float voltage, charger healthy | A flat battery is the most common cause of a failed start |
| Fuel level | Above the level needed for the expected outage | A set that starts and then runs dry fails the site later instead of sooner |
| Active alarms and shutdowns | None | A latched shutdown blocks the next automatic start |
| Coolant heater and temperature | Heater on, temperature normal | Cold engines start slowly and take load badly |
Put these five on one screen for every set, with clear colours, and make each one an alarm when it leaves the healthy state. They tell an operator in one glance whether the site will survive the next outage.
An alarm priority scheme that people will follow
| Priority | Examples | Response expected | If not acknowledged |
|---|---|---|---|
| 1: Act now | Generator tripped on load; main breaker tripped; fuel critically low during an outage | Within minutes | Escalate to the next person after a short, set time |
| 2: Act today | Generator not in automatic; charger failed; fuel below the reorder level | Same shift | Escalate at the end of the shift |
| 3: Plan | Service hours due; minor sensor fault; battery nearing replacement | Next planned visit | Weekly report |
Each alarm in the point list gets one priority, one owner and one response. Anything that does not need a response is an event, logged but not sent. A phone that receives three or four priority-two alarms a week is read; one that receives sixty events a day is not.
How much history to keep, and what it costs
Trend history is what turns a monitoring system into an engineering tool: it shows a battery voltage falling over months, fuel use rising with an injector fault, or a breaker that runs hotter after each summer. Storage is rarely the constraint.
Logging 300 points once a minute for a year, at 8 bytes per value, is 300 × 1440 × 365 × 8 bytes, about 1.26 GB. Keep at least two years of one-minute data, and event records with their time stamps for the life of the plant. The constraint is usually retrieval: make sure the system can export history in an open format, because the next engineer to investigate a fault will need it outside the screen it was collected on.
Keep the point list as a living document: every added sensor, changed alarm priority or new recipient goes into it, with the date and the person who made the change. A monitoring system whose configuration exists only inside the software is lost the day that software is replaced.
Whose time stamp is it?
An event can be time-stamped where it happened, in the relay or controller, or where it arrived, in the SCADA server after the next poll. On a link with a 1.4 s scan, the arrival time can be more than a second late and in the wrong order relative to other events. For anything used in a fault investigation, protection operations, breaker trips and transfers, use the device’s own time stamp, and synchronise the devices’ clocks. See time synchronisation and event correlation.
Three trends worth watching every month
- Starting battery voltage during cranking: a dip that gets deeper each month warns of a battery or starter problem long before a failed start.
- Fuel used per running hour at similar loads: a rise points to injector, air filter or turbocharger problems, or to fuel being lost.
- Breaker and busbar temperatures, where measured: a joint that runs a few degrees hotter after each season is a loosening connection.
Review these with the maintenance team monthly. The monitoring system has paid for itself the first time one of them leads to a repair before an outage instead of after one.
Secure remote access in practice
- No controller, relay or meter reachable directly from the internet; all access through a gateway or firewall that only opens outbound connections.
- Remote users connect through an authenticated, encrypted channel with named accounts, never a shared password written on the panel.
- Monitoring and control separated: most users get read-only access, and remote commands, if allowed at all, need a second confirmation.
- Default passwords on every device changed at commissioning, and the list held by the owner.
- A record of who connected, when and what they changed.
Getting the alarm to a person
An alarm that reaches only a control-room screen at three in the morning reaches nobody. Decide for each priority-one and priority-two alarm who receives it, by which channel, and who receives it next if the first person does not acknowledge. Use at least two independent channels for priority one, for example a phone notification and an automated call, because any single channel fails occasionally. Test the escalation monthly with a deliberate test alarm, and keep the contact list current: an escalation that ends with someone who left the company last year is a common finding.
Building management system or dedicated SCADA?
Many sites already have a building management system, and connecting the generators to it is the cheapest route. It suits readiness monitoring and alarms well. A dedicated power SCADA becomes worthwhile when the site needs fast event recording with device time stamps, protection data from numerical relays, power-quality trends, or remote control of breakers under strict security. A common middle path keeps readiness and alarms on the building management system and adds a separate, small power-monitoring system for event records and analysis. Whichever is chosen, the generator controllers must keep working fully on their own if the monitoring system is unavailable.
Making fuel level readings trustworthy
Fuel level is the reading people act on most, and it is often the least accurate. A level sensor reports height, not volume; converting height to litres needs the tank’s actual shape, and a horizontal cylindrical tank holds far less in its bottom and top tenths than in the middle. Calibrate the conversion against measured fills, show usable litres rather than percent of tank height, and allow for the unusable volume below the suction pipe. Alarm on an unexpected drop as well as on a low level, because a sudden fall with the set not running points to a leak or to theft. See fuel theft and refuelling control.
Commissioning the monitoring system
Test every point from the field device to the screen and to the phone, not a sample. For each status point, operate the real device and confirm the screen changes; for each analog value, compare the screen with a reference reading; for each alarm, generate it and confirm its priority, text and delivery. Then disconnect the link and confirm every value turns to a clear “no data” state and that the site runs normally without it. Record the results in the point list, which then becomes the system’s reference document.
Common mistakes
- Monitoring running status but not readiness.
- Every event sent as an alarm.
- Stale data shown as live.
- Controllers exposed to the internet.
What to send us
Send the equipment list and what you want to see and be alerted to. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Alarm counts and outcomes are illustrative.
Questions engineers ask
How old is the data on a SCADA screen?
As old as one complete polling cycle, or more. On a 9600 baud Modbus RTU link, reading a 40-register block takes about 0.16 s including turnaround, so three generators read in three blocks each take about 1.4 s per scan. That suits trends and readiness alarms but not fast events, which should be time-stamped in the relay or controller itself and not on arrival at the server.
Which generator readings best predict a failed start?
Five: the controller mode, which must be automatic; starting battery voltage and charger status; usable fuel above what the expected outage needs; no active alarms or latched shutdowns; and the coolant heater working. Show them together for every set on one screen and make each an alarm when it leaves its healthy state.
Is remote control safe?
It can be, with strong authentication, interlocks enforced locally in the switchgear rather than only in software, confirmation steps, logging of every command and clear rules on who may operate what. Many sites allow monitoring only and keep switching local. Never allow remote control to bypass local safety interlocks.
Which protocol is best?
The one your devices support well and your team can maintain. Open protocols such as Modbus and IEC 61850 give flexibility to mix makes. Agree the register or data maps early, check that data is scaled and refreshed fast enough, and keep the protection itself independent of the monitoring network.
What if the link fails?
Protection and local control must carry on unaffected, because they should never depend on the monitoring network. The monitoring system should alarm the loss of communication, and devices should buffer events and measurements so the record can be filled in when the link returns, with no gap in the event history.
How many alarms are too many?
If operators cannot read and respond to each alarm, there are too many, and important ones will be missed. Prioritise alarms, group consequential alarms behind their cause, remove alarms that need no action and review the alarm list after commissioning and periodically. Every alarm should have a defined response.
This guide gives general principles. Cybersecurity needs specialist review.