Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Protection Alarms, Events and Disturbance Records Guide

How to use relay alarms, sequence-of-events logs and disturbance records to find the cause of trips, with time synchronisation, alarm design, retrieval practice and a post-trip analysis method.

In short. After a trip, the protection relays and generator controller hold the evidence: what picked up first, what tripped, in what order, and what the currents and voltages did. That evidence is only useful if the clocks agree, the recorders are set to trigger and keep enough data, the alarms are designed so the important one stands out, and someone downloads the records before anyone resets the relay or the memory overwrites them.

Who this page is for: For maintenance, operations and protection engineers who investigate trips on generator, transformer and switchboard systems.

Key facts

  • Event logs (sequence of events) give the order; disturbance records give the waveforms.
  • All relays and controllers need one time source; drift of even tens of milliseconds can reverse the apparent order of events.
  • Typical disturbance settings keep a few hundred milliseconds before the trigger and one to two seconds after.
  • Download records before resetting relays or cycling power.
  • Classify alarms by priority; an alarm flood hides the cause.
  • Compare recorded pickup and trip times with the settings to prove the protection worked.

Types of record

RecordContentsUse
AlarmsConditions needing attentionEarly warning and status
Sequence of eventsTime-stamped pickups, trips and breaker changesThe order of events across devices
Disturbance (fault) recordCurrent and voltage waveforms before, during and after an eventFault type, magnitude, clearing time, CT behaviour
Fault reportSummary of fault current and location estimateQuick triage
Trend dataSlow values such as load and temperatureSpotting gradual degradation

Time synchronisation

If one relay’s clock runs 40 ms slow, its trip can appear to come before the fault that caused it. Synchronise every relay, controller and recorder to a common source, such as a GPS clock or a network time server, and check drift at each maintenance visit. A record without trustworthy time is a list, not a sequence.

Worked example: reading a generator trip (illustrative)

A 500 kVA generator trips while a 75 kW pump starts direct-on-line. The records show:

Time (ms)DeviceEvent
0Pump starterContactor closes
20Generator controllerVoltage falls to 76%; undervoltage element picks up
520Generator controllerVoltage still at 79%; undervoltage trip after its 0.5 s delay
560Generator breakerOpens

The waveform shows no fault: currents are high but balanced, with a low power factor typical of a motor start, and the voltage was recovering slowly. The protection worked as set, but the setting did not suit the duty. The fix was a soft starter for the pump, which cut the dip to about 12%, and a longer undervoltage delay, kept within the generator maker’s limits. The next start passed without a trip. See motor starting and voltage dip.

Never reset a relay or power-cycle a controller before downloading its records. The evidence of an intermittent fault is often a single disturbance record, and a reset or a new event can overwrite it.

Setting up recorders

  • Trigger on protection pickup, trip and breaker status change.
  • Keep enough pre-fault data (a few hundred milliseconds) and post-fault data (one to two seconds).
  • Record all phase currents and voltages, neutral or earth current, and key digital signals.
  • Name signals clearly so records can be read years later.
  • Check memory size and overwrite rules.

Alarm design

PriorityMeaningExample
Trip or shutdownSupply lost or plant at risk; act nowGenerator overcurrent trip
UrgentAction needed within the shiftBattery charger failure
AdvisoryPlan actionService hours reached

Group related alarms, suppress repeats, use clear text rather than codes, and test each alarm path from relay to display. A short list with clear actions works better than a long list nobody reads.

Post-trip analysis

  1. Secure the records: download event logs and waveforms from every involved device.
  2. Build the sequence across devices using synchronised time.
  3. Read the waveforms: fault type, magnitude, duration, DC offset, CT saturation.
  4. Compare pickup and trip times with the settings and the coordination study.
  5. Inspect the equipment before re-energising.
  6. Record the cause and the corrective action.

See remote monitoring for retrieving records from a distance.

Trip investigation record

ItemValue
Date, time and devices involved 
Records downloaded (device, file name) 
Sequence of events (first pickup to final trip) 
Fault type and magnitude from the waveform 
Did the right device trip in the right time? 
Cause and corrective action 

Worked example: how many disturbance records fit in the relay

Disturbance recorders overwrite their oldest records when memory fills, so the number of records a relay can hold sets how long evidence survives. Take a relay sampling at 32 samples per cycle on a 50 Hz system, 1600 samples per second, recording 8 analogue channels and 32 digital channels, with 0.3 s before the trigger and 1.5 s after: 1.8 s per record.

That is 2880 samples; at 2 bytes per analogue value the analogue part is 2880 × 8 × 2, about 46 kB, and the digital channels add about 11.5 kB. In 4 MB of record memory the relay holds about 70 such records. A plant with frequent starts or nuisance triggers can fill that in weeks, overwriting the record of the trip that matters. Set triggers to capture faults and abnormal events, not every start, and download records regularly.

Keep records in an open format

Every maker’s software can read its own records, but a fault investigation often involves several makes and outlives the laptop that downloaded them. Disturbance records can be exported in the COMTRADE format defined in IEC 60255-24, which any analysis tool can read. Export every record of interest in that format as well as the native one, name the files with the date, time and device, and store them with the trip investigation record. Event logs should be exported as plain text or a spreadsheet for the same reason.

Reading a waveform: what the shapes mean

Pattern in the currentLikely meaning
Sudden large increase, offset to one side and decaying back to symmetricalA fault, with DC offset set by when in the cycle it began
Flat-topped or sharply distorted peaks on one phaseCT saturation; the protection may have seen less than the real current
Irregular, ragged current that comes and goesAn arcing fault, often intermittent before it becomes solid
Large, one-sided peaks with gaps, on energisation onlyTransformer inrush, rich in the second harmonic
Current that falls steadily over a few hundred millisecondsGenerator fault current decaying from subtransient towards sustained values
Voltage dip on all phases, current rising slowly, no faultA large motor starting

Measuring clearing time from a record

A disturbance record shows exactly how long the fault lasted. Count the cycles from the moment the current rose to the moment it fell to zero on the last phase: 4.5 cycles at 50 Hz is 4.5 × 20 = 90 ms. Compare that with what the settings should have produced: a relay operating time of about 30 ms and a breaker opening time of about 60 ms, for example, add up to the same 90 ms. A clearing time much longer than the settings predict points to a slow breaker, a relay that operated on a slower element than expected, or a trip that came from a backup device, and each of those is a finding in its own right even if the fault was cleared.

How many alarms is too many?

Widely used industry guidance on alarm management treats an average of about one alarm every ten minutes per operator as manageable, and more than about ten alarms in ten minutes as a flood in which important alarms are likely to be missed. A generator plant that produces a burst of fifty alarms on every mains failure fails that test on exactly the day it matters. Count the alarms produced by a test mains failure, find the ones that are consequences of the first, and suppress or group them so that the first cause stands out. See alarm rationalisation and operator decision support.

Alarm counts are worth tracking month by month. A rising count usually means a sensor drifting, a setting too close to normal operation or a recurring fault that has become background noise, and each of those is cheaper to fix while it is still an alarm than after it has become a trip.

Preserving the evidence after a trip

  1. Make the plant safe, and note the time and what was seen and heard.
  2. Photograph every relay and controller display and every flag before anything is reset.
  3. Download event logs and disturbance records from every device involved, including those that did not trip.
  4. Record the breaker positions, the counters and the state of the DC supply.
  5. Only then reset, restore supply and begin the analysis.

Resetting a relay or cycling a controller’s power before the records are downloaded can erase the only evidence of what happened, and a trip that cannot be explained is likely to be repeated.

Choosing what triggers a recording

A recorder triggered only by a trip misses the events that lead up to one. Useful triggers include protection pickup, not just trip; breaker state changes; under-voltage and under-frequency thresholds; and a manual trigger for planned tests. Too many triggers fill the memory, so set thresholds above the plant’s normal disturbances, such as the dip from the largest routine motor start, and review the triggers after the first months of operation using the records they produced.

Using records to improve the settings

Records are not only for investigating trips. Over months they show how close the plant runs to its settings: the deepest voltage dip on a routine motor start, the highest current on a normal day, the frequency swing when a large load is switched. Comparing those with the pickup values shows which settings have comfortable margins and which are close to nuisance trips, and lets the settings be adjusted on evidence rather than after the next unexplained outage.

What investigations most often find

Across generator and switchboard trips, the same handful of findings recur: a setting that was never changed from the factory default, a CT with the wrong ratio or polarity, a clock that was never synchronised, a breaker slower than its rating, and a DC supply that was weaker than anyone knew. Records turn each of these from a suspicion into a fact, which is why the effort to set recorders up properly, keep their clocks right and download them promptly is repaid on the first serious trip.

Common mistakes

  • Resetting relays before downloading records.
  • Clocks not synchronised.
  • Alarm floods that hide the first cause.
  • Too little pre-fault data to see what led to the event.

What to send us

Send the relay and controller models, the downloaded records and a description of the trip. WhatsApp 98852 01608 or use the enquiry form.

Evidence note. The example is illustrative; record settings follow each relay maker’s capabilities.

Questions engineers ask

How many disturbance records can a relay hold?

It depends on the sample rate, channel count and record length. At 32 samples per cycle on 50 Hz, with 8 analogue and 32 digital channels and 1.8 seconds per record, each record is about 58 kB, so 4 MB of memory holds about 70 records. Frequent starts or nuisance triggers can overwrite the important one within weeks, so set triggers carefully and download records regularly.

How is fault clearing time read from a record?

Count the cycles from the moment the fault current rises to the moment the last phase falls to zero, and multiply by 20 milliseconds on a 50 Hz system. For example, 4.5 cycles is 90 milliseconds. Compare that with the relay operating time plus the breaker opening time expected from the settings; a much longer time points to a slow breaker, a slower protection element or a backup device having tripped.

What is a disturbance record?

A waveform recording of the currents, voltages and digital signals seen by a relay for a short time before and after a trigger such as a trip. It shows what the fault looked like, which elements picked up, when the trip command was issued and how long the breaker took to clear, so the cause and the protection performance can be analysed.

Why does time sync matter?

So events recorded by different relays, controllers and power instruments can be placed in the right order. Without a common time source, clocks drift by seconds or minutes and a sequence of trips across a board cannot be reconstructed. Synchronise all devices to one source, from a network time server or a satellite clock.

How long are records kept?

Only until the relay memory fills, when the oldest records are overwritten, which may be within a few events on some devices. Download records promptly after every trip and store them centrally with the event log, settings and a short note of what happened, so they are available when needed.

Can records prove a relay worked correctly?

Yes. Comparing the recorded current and voltage with the settings shows whether the relay picked up at the right value, issued its trip at the right time, and whether the breaker cleared in its expected time. Records also show when a relay did not operate and why, which is often more valuable.

This guide gives general principles. Retrieval details depend on the relay model.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.