In short. An online (double-conversion) UPS converts incoming AC to DC and back to AC continuously, so the load always runs from the inverter and sees no break when the mains fail. It regulates voltage and frequency and protects critical equipment from most supply problems. The costs are lower efficiency, more heat and an input that a generator must be able to supply cleanly.
Who this page is for: For IT, hospital and facility engineers selecting, sizing or running an online UPS, especially on generator backup.
Key facts
- Power path: rectifier and charger, DC bus with battery, inverter, output; a static bypass is the alternative path.
- No transfer time on mains failure: the battery is already on the DC bus.
- Losses become room heat: input power = output ÷ efficiency.
- The input window decides how often the battery is used on a weak supply.
- On generator supply, rectifier walk-in, input harmonics and the frequency window all matter.
- Eco mode raises efficiency but runs the load on raw mains, with a short transfer to the inverter when the mains fail.
Power path and modes
| Mode | What feeds the load |
|---|---|
| Normal (double conversion) | Rectifier and inverter from mains or generator |
| Battery | Battery through the inverter, no break |
| Static bypass | Raw supply, on overload or inverter fault |
| Maintenance bypass | Raw supply, manual, for servicing |
| Eco mode | Raw supply normally, inverter on standby |
Worked example: heat and generator check for a 60 kVA UPS (illustrative)
| Step | Working | Result |
|---|---|---|
| Load | 45 kW of IT equipment | 45 kW |
| UPS input at 94% efficiency | 45 ÷ 0.94 | about 47.9 kW |
| Heat into the room | 47.9 − 45 | about 2.9 kW to remove by cooling |
| Battery recharge after an outage | about 10% of the 45 kW load | about 5 kW extra |
| Generator must supply | 47.9 + 5, plus cooling and other loads | about 53 kW for the UPS alone |
A generator sized only for the 45 kW IT load would be short by the losses and recharge, before cooling is counted; the set’s kVA rating also needs margin for the rectifier’s harmonic current. Rectifier walk-in (a gradual ramp of input current over several seconds) keeps the transfer from being one large step on the set. See UPS and DG integration.
Do not size the generator or the room cooling from the UPS output rating. The UPS draws its output plus losses plus battery recharge, and its losses heat the room.
Input window on a weak supply
Within its input window the UPS runs from mains; outside it the battery takes over. On a supply that drifts outside the window every evening, the battery cycles daily and wears out early. A stabiliser upstream keeps the UPS on mains. See stabiliser vs UPS.
Generator compatibility
- Rectifier walk-in avoids a sudden step on the set.
- Input harmonic current distorts generator voltage more than grid voltage. See UPS and non-linear loads.
- The input frequency window must cover the generator’s dips and recovery.
- Sync to bypass needs a stable frequency; set the tolerance to suit the set.
UPS check sheet
| Item | Value |
|---|---|
| Load kW and UPS rating | |
| Efficiency and heat to remove | |
| Battery runtime and recharge power | |
| Input voltage and frequency window | |
| Generator capacity allowed for the UPS |
Efficiency at part load: losses do not fall with the load
A UPS efficiency figure is usually quoted at one load, often the best point on its curve, but a double-conversion UPS spends most of its life well below full load, particularly in redundant systems where each unit is deliberately kept under half loaded. Its losses are made of a fixed part, which runs whatever the load, and a part that rises with the load. As the load falls, the fixed part becomes a larger share of the whole, and the efficiency falls with it.
| Load on a 60 kVA, 54 kW unit | Output | Efficiency on a typical curve | Losses |
|---|---|---|---|
| 25% | 13.5 kW | 90% | 1.5 kW |
| 50% | 27.0 kW | 94% | 1.7 kW |
| 75% | 40.5 kW | 95% | 2.1 kW |
| 100% | 54.0 kW | 94.5% | 3.1 kW |
The reading that matters is the right-hand column. Quartering the load from full to a quarter cuts the losses only by about half, from 3.1 to 1.5 kW, so a lightly loaded UPS turns a far larger share of its input into heat. The curve here is illustrative; every model has its own, and the maker should supply it as a table of efficiency at 25, 50, 75 and 100% load, measured, for the operating mode that will actually be used. Compare UPS units at the load they will carry, not at the point where each happens to be best, and size the cooling from the losses at that load.
Crest factor: the peak current the inverter must deliver
Many loads on a UPS do not draw a sinusoidal current. Computer and server power supplies, LED drivers and small electronic equipment draw current in short pulses near the peak of each half-cycle, with a high peak for a given RMS current. The ratio of peak to RMS is the crest factor: 1.41 for a pure sine wave, and commonly 2.5 to 3 for a load made up of small power supplies. An inverter has a peak current limit, and UPS ratings state the crest factor the output can support at full load, typically 3 to 1.
The arithmetic shows why it matters. A three-phase 60 kVA UPS is 20 kVA per phase, which at 230 V is about 87 A RMS. At a crest factor of 3 the inverter must deliver about 261 A at the peak of each cycle on that phase. A unit that can deliver its RMS rating only into a near-sinusoidal load may flatten the peaks of a pulse-shaped current instead, distorting its own output voltage. Ask for the crest factor rating, check it against the load, and where the load is almost entirely electronic, allow for it in the sizing rather than loading the unit to its full kVA.
Three-phase in, single-phase out
Many small and medium online UPS units take a three-phase input and deliver a single-phase output. They are convenient where the critical load is all single-phase, but their currents are very different on each side. A 20 kVA unit of this type delivers about 87 A on its single output phase, while its input draws only about 29 A on each of three phases at 415 V, at 95% efficiency. The input cable is sized for 29 A per phase; the output cable, its protection and the bypass for 87 A, three times as much.
The bypass is where this catches people. A three-to-one unit’s static bypass must be fed from a single-phase supply that can carry the full output current, so the bypass input is usually a separate single-phase feed of the larger size, and the upstream board must have one phase able to carry 87 A on its own when the UPS transfers to bypass. On generator, that whole current then lands on one phase of the set. Check the generator’s permissible unbalance against the bypass current before relying on the bypass while on generator.
The alarms that matter, and what to do about each
An online UPS reports dozens of conditions, and the few that matter should be sent somewhere they will be seen, with an agreed response written beside each.
| Alarm | What it means | Response |
|---|---|---|
| On battery | The input has failed or is outside its window | Confirm the generator is starting; note the time |
| Low battery | Minutes of autonomy remain | Begin orderly shutdown of the loads if the generator is not on load |
| On bypass | The load is on raw supply, unprotected | Find the cause the same day; the load is exposed to every disturbance |
| Overload | The load exceeds the rating, often after an addition | Identify the new load; the unit will go to bypass if it persists |
| Over-temperature | Cooling has failed or a fan has stopped | Check the room cooling and the unit’s fans before it shuts down |
| Battery test failed | The battery could not carry the load in its last test | Arrange a discharge test and block replacement |
The on-bypass alarm is the one most often ignored. A UPS that went to bypass on an overload weeks ago and was never reset looks normal from across the room, and the load has been unprotected all that time. Test the alarm path itself, end to end, at least twice a year.
The parts that wear out inside the UPS
An online UPS runs its rectifier and inverter continuously, and a few parts age whether or not there is ever an outage. Cooling fans wear in their bearings. Electrolytic capacitors on the DC bus and in the output filter dry out with time and heat, and their ageing roughly doubles in speed for every 10 degrees they run hotter.
Makers give replacement intervals for both, measured in years at a stated room temperature, and those intervals shorten in a warm room. Plan the replacements as scheduled maintenance, with the load on maintenance bypass, rather than waiting for a fan to stop or a capacitor to fail and take the inverter with it. A record of the unit’s internal temperatures, read at each service visit, shows whether it is ageing at the rate the intervals assume.
What the automatic battery test proves, and what it does not
Most online UPS units run a battery test on a schedule: they lower the rectifier output so that the battery carries the load for a short time, often seconds to a minute, and check that the battery voltage stays above a limit. A passed test proves that the battery is connected, that no block has failed open and that the battery can carry the load for that short period. It does not prove the autonomy. A battery that passes a 30-second test can still fall short of five minutes, because a weak block shows itself only towards the end of a longer discharge.
The autonomy figure on the display is an estimate from a model of the battery, updated by these short tests, and it drifts from the truth as the battery ages. The only reliable figure comes from a discharge at real load to the end voltage, timed, with the block voltages recorded near the end, once a year. Treat the self-test as a weekly health check and the annual discharge as the measurement, and plan block replacement from the trend of the discharge results rather than from the display.
Common mistakes
- Room cooling sized without UPS losses.
- Generator sized to UPS output, not input.
- Eco mode chosen without accepting the transfer.
- Battery not tested under load. See UPS batteries.
What to send us
Send the load, UPS data, battery runtime and generator rating. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Efficiencies and recharge figures are illustrative; the UPS maker’s data govern.
Questions engineers ask
What crest factor does a UPS need to handle?
Enough for the peak current of its load. Computer and server power supplies and LED drivers draw short current pulses with a crest factor of about 2.5 to 3, against 1.41 for a sine wave, and many UPS units are rated for 3 to 1 at full load. A 60 kVA three-phase unit carries about 87 amps RMS per phase at 230 volts, so at a crest factor of 3 it must deliver about 261 amps at each peak. Check the rating against the load before loading the unit to its full kVA.
Does a passed UPS battery self-test prove the autonomy?
No. The automatic test discharges the battery for seconds to a minute and proves it is connected and can carry the load briefly. A weak block often shows only near the end of a longer discharge, so a battery can pass the self-test and still fall short of its rated minutes. The only reliable figure comes from a timed discharge at real load to the end voltage, once a year, with block voltages recorded near the end.
Is online UPS always best?
For critical loads, yes, because double conversion gives continuous regulation with no transfer break. For other loads, weigh it against cost and heat, since conversion losses run all the time. Many sites use online units for servers and controls and simpler units elsewhere, matched to how much each load can tolerate.
What is eco mode?
In eco mode the load runs on the bypass supply while the input is good, and the inverter takes over when the input goes out of limits. Efficiency rises because the conversion losses stop, but the load sees supply disturbances and a short transfer, so it is used only where the loads tolerate that.
Why does it run hot?
Because of conversion losses. An online UPS converts the whole load to DC and back to AC continuously, and a few percent of that power becomes heat in the rectifier, inverter and transformer. Plan room cooling for those losses at full load, since heat also shortens battery life and capacitor life.
Does it clean harmonics?
It isolates the load from supply disturbances, and its inverter supplies the harmonic currents the load draws. Its own rectifier may draw harmonic currents from the supply, though, which matters on a generator. Modern active front-end rectifiers draw much less distortion, so check the input data before connection.
Values are illustrative. Use manufacturer data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.