In short. An air-cooled servo stabiliser rejects its losses to room air, by natural convection or with fans. It is lighter, cleaner and simpler than an oil-cooled unit and suits most indoor commercial and light industrial sites. Whether it is enough depends on three things: how hot the room gets at the worst hour, whether the ventilation can carry the heat away, and how much dust is in the air. Get those right and an air-cooled unit runs for years; get them wrong and it trips every summer afternoon.
Who this page is for: For facility managers, electricians and consultants choosing, siting or troubleshooting an air-cooled voltage stabiliser.
Key facts
- Heat released (kW) ≈ load kW × loss fraction; many stabilisers lose around 2 to 3% at full load.
- Ventilation air flow (m³/s) ≈ heat (kW) ÷ (1.2 × temperature rise in °C).
- 2 kW of heat with a 5 °C room rise needs about 0.33 m³/s, roughly 1200 m³/h.
- High ambient reduces the permitted loading; the maker’s derating curve governs.
- Dust insulates windings and blocks vents; filters must be cleaned on schedule.
- Very large ratings and harsh sites often suit oil-cooled designs better.
The heat path
Copper and core losses heat the windings and core. Air passing over them carries the heat into the room, and the room must pass it on through ventilation or air conditioning. If any link is weak, temperatures rise until thermal protection trips or insulation ages early. The stabiliser’s rating assumes the room keeps up.
Air-cooled or oil-cooled?
| Aspect | Air-cooled | Oil-cooled |
|---|---|---|
| Weight and size | Lower for small and medium ratings | Heavier, with a tank |
| Fire and leak risk | No oil | Oil containment and fire precautions |
| Maintenance | Filters, fans, brushes | Oil level and condition checks as well |
| Dusty or hot sites | Limited; dust clogs, heat reduces rating | Better; sealed and with more thermal mass |
| Short overloads | Lower thermal mass | Higher thermal mass |
See oil-cooled servo stabilisers.
Worked example: ventilating a stabiliser room (illustrative)
In a hot room the air is thinner (about 1.1 kg/m³ at 45 °C), so add about 10% to the air flow.
A 100 kVA air-cooled stabiliser carries 80 kW at full load with about 2.5% losses. It shares a small electrical room with a 30 kVA UPS losing about 1.5 kW.
| Step | Working | Result |
|---|---|---|
| Stabiliser heat | 80 kW × 0.025 | 2.0 kW |
| UPS heat | From maker’s data | 1.5 kW |
| Total heat in the room | 2.0 + 1.5 | 3.5 kW |
| Air flow for a 5 °C room rise | 3.5 ÷ (1.2 × 5) | About 0.58 m³/s, roughly 2100 m³/h |
Sized for the stabiliser alone, the fan would move about 1200 m³/h and the room would run about 9 °C above outside air instead of 5 °C. On a 42 °C afternoon that puts the air around the stabiliser at about 51 °C, into derating or a thermal trip. Calculate the room’s total heat, not one unit’s.
Do not put an air-cooled stabiliser in a closed room without calculated ventilation or cooling. Hot exhaust air that recirculates to the inlet raises the unit’s temperature with every cycle, and the trip comes at the hottest hour, when the load is often highest.
Site checks before installation
- Ambient temperature range, including the hottest hours of summer.
- Inlet and outlet clearances and the room’s air exchange.
- Dust, humidity and corrosive air.
- Total heat from all equipment in the room.
- Noise limits, since fans add noise.
Derating
High ambient reduces the loading the unit can carry continuously. The derating curve is the maker’s; use it at the room’s worst temperature, not the average. The same principle applies to generators. See ambient derating and altitude derating.
Air quality and filters
| Condition | Effect | Response |
|---|---|---|
| Dust | Blocks vents and insulates windings | Filters and a cleaning schedule |
| Humidity | Lowers insulation resistance | Dry location; anti-condensation heaters if needed |
| Corrosive air | Attacks contacts, brushes and terminals | Sealed enclosure or a different design |
| High ambient | Cuts allowable loading | Derate, or cool the room |
Routine inspection
- Inlet and outlet clear of obstruction.
- Filters cleaned or replaced on schedule.
- Fan rotation, noise and current.
- Winding and terminal temperatures with an infrared camera at load.
- Servo motor, carbon brush and track condition.
- Control and protection test; log the room temperature.
Fault diagnosis
| Symptom | First check |
|---|---|
| Thermal trip in the afternoon | Room temperature and air flow |
| Trips becoming more frequent over weeks | Clogged filters |
| Hot terminal | Tightness and contact condition |
| Fan noise | Bearings or obstruction |
| Output hunting | Brush and track wear, control settings |
Siting for hot climates
Summer temperatures in the Deccan region are high and electrical rooms are often small. Place the unit where hot exhaust cannot return to the inlet, keep it away from UPS units and transformers unless the combined heat has been calculated, and check the room on the hottest afternoon of the year.
Stabiliser room worksheet
| Item | Value |
|---|---|
| Stabiliser kVA, load kW and loss percent | |
| Other heat sources in the room (kW) | |
| Total heat (kW) | |
| Hottest outside temperature (°C) and allowed room rise | |
| Required air flow (m³/h) and fan installed | |
| Derated capacity at the worst room temperature |
Working out the heat to remove
An air-cooled stabiliser releases its losses into the room as heat, and the room must remove it. The losses are the throughput multiplied by one minus the efficiency. A 100 kVA stabiliser carrying 80 kW at 97% efficiency loses about 2.5 kW; at 98%, about 1.6 kW. That heat is roughly equal to a small electric heater running all day, and in a closed room it raises the temperature steadily until the unit derates or trips.
| Load through the stabiliser | Efficiency | Heat released |
|---|---|---|
| 40 kW | 97% | about 1.2 kW |
| 80 kW | 97% | about 2.5 kW |
| 80 kW | 98% | about 1.6 kW |
| 150 kW | 97.5% | about 3.8 kW |
Airflow needed to carry the heat away
Ventilation removes heat by letting cooler air in and warmer air out. The airflow needed depends on the heat and on how much the room air is allowed to warm above the outside air. A simple estimate is airflow in cubic metres per second equals heat in kW divided by 1.2 times the allowed temperature rise in degrees.
For 2.5 kW and a 5 degree rise, that is 2.5 divided by 6, about 0.42 cubic metres per second, or about 1500 cubic metres per hour. Allowing only a 3 degree rise needs about 0.69 cubic metres per second. A fan of that capacity, with inlet and outlet openings placed so the air crosses the stabiliser, keeps the room close to outside temperature.
Hot afternoons and enclosure temperature
Air-cooled units are rated for a stated ambient temperature, often around 40 to 45 degrees, with derating above it. In Hyderabad summers the outside air can reach the mid-forties, and a poorly ventilated room can run five to ten degrees hotter. The stabiliser should be selected for the hottest room temperature it will see, not the average, and its maker derating applied where the room exceeds the reference. Keeping the unit out of direct sun, away from other heat sources and with clear space around its vents makes a large difference.
Dust, filters and moving parts
Cooling air brings dust with it. In an air-cooled servo stabiliser, dust settles on the carbon track, brushes and servo motor as well as on the windings, which slows correction and raises temperature. Filters on the air inlets reduce it, but they must be cleaned or replaced often in dry, dusty months, because a clogged filter cuts airflow and heats the unit. Where dust cannot be controlled, an oil-cooled unit with sealed windings is the more reliable choice.
Monitoring temperature in service
A simple record of room temperature and unit temperature at each visit, and the load at the time, shows whether cooling is adequate as seasons change. Many units have a temperature alarm; it is tested at each service and wired to a place where someone will notice it. A rise of several degrees at the same load from one season to the next points to blocked filters, a failing fan or dust on the windings, and it is corrected before the unit trips during the next hot spell.
Room checklist
- Heat released at maximum load calculated and ventilation sized to remove it.
- Inlet low and outlet high on opposite sides, so air crosses the unit.
- Clear space around vents and for service access.
- Filters fitted and a cleaning schedule set for the dry season.
- No direct sun on the unit; no other heat sources nearby.
- Temperature alarm tested and connected.
Where the room cannot be ventilated well enough, a small dedicated cooling unit sized for the heat calculated above is a reliable alternative, with its own alarm in case it fails.
That unit is maintained on the same schedule as the stabiliser, since a failed cooler leads straight to a stabiliser trip.
Common mistakes
- Sizing ventilation for one unit in a shared room.
- Checking the room in the morning instead of the hottest afternoon.
- Neglecting filters.
- Choosing air cooling for a very dusty or corrosive site.
What to send us
Send the stabiliser rating, load, room size, other equipment in the room and the hottest temperature you see. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. Loss and air-flow figures are illustrative; use the maker’s loss data and derating curve.
Questions engineers ask
How much heat does an air-cooled stabiliser release?
Its losses, which are the throughput multiplied by one minus the efficiency. A unit carrying 80 kW at 97% efficiency releases about 2.5 kW, much like a small heater running all day, and in a closed room that heat raises the temperature until the unit derates or trips.
How much ventilation does a stabiliser room need?
Airflow in cubic metres per second is roughly the heat in kW divided by 1.2 times the allowed temperature rise. For 2.5 kW and a 5 degree rise, that is about 0.42 cubic metres per second, or about 1500 cubic metres per hour, with inlet low and outlet high.
Does dust affect an air-cooled servo stabiliser?
Yes. Cooling air carries dust onto the carbon track, brushes, servo motor and windings, slowing correction and raising temperature. Inlet filters help but need frequent cleaning in dry months, and where dust cannot be controlled an oil-cooled unit with sealed windings is the more reliable choice.
How do I know if the stabiliser is running too hot?
Record room and unit temperatures with the load at each visit and test the temperature alarm. A rise of several degrees at the same load between seasons points to blocked filters, a failing fan or dust on the windings, which should be corrected before the next hot spell.
Can I place it in a closed room?
Only with enough ventilation or cooling to remove its losses. Every stabiliser turns a small percentage of its throughput into heat, and in a closed room that heat raises the temperature until the unit derates or trips. Provide air inlets and outlets, or room cooling, sized for the losses at full load on the hottest day.
Is air cooling suitable above a certain rating?
It is maker-specific. Air cooling is common for small and medium ratings, while large ratings often use oil cooling because oil carries heat away from the windings more effectively and keeps dust out. Check the maker rating, the ambient temperature it assumes and the derating above that temperature before choosing.
Do filters matter?
Yes. Clogged filters reduce airflow, which raises winding and electronics temperature, shortens insulation life and can cause derating or overtemperature trips. In dusty sites the filters are cleaned or replaced at short intervals, and the fans are checked for noise and rotation at the same time, so cooling stays as designed.
What about noise?
Fans add noise, and the transformer itself hums at twice the supply frequency. Check the noise level on the data sheet against the limits for the location, especially in offices, hospitals and homes, and place the unit where the sound is acceptable, away from rooms where people work or sleep.
Values are illustrative. Use manufacturer data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.