In short. Three-phase and industrial UPS systems serve larger loads, process controls and harsh environments. The key choices are transformer-based or transformerless design, overload capability, protection against dust, heat and humidity, the neutral arrangement with unbalanced single-phase loads, and how the input behaves on generator supply. Size each phase for its real load, and keep motor starts off the UPS.
Who this page is for: For plant, process and facility engineers specifying a three-phase UPS for controls, IT, labs or industrial loads.
Key facts
- kVA = √3 × V × I ÷ 1000; the kW must also stay within the UPS kW rating.
- Transformer-based units are heavier but robust and give isolation; transformerless units are lighter and more efficient.
- Do not size a UPS for motor starting; feed motors separately.
- Single-phase loads create unbalance and neutral current; check per-phase output and the neutral size.
- Size the generator for UPS input plus battery recharge, not UPS output.
- Dusty or hot sites need suitable enclosures, filters and derating.
Design choices
| Choice | Points |
|---|---|
| Transformer-based | Robust, galvanic isolation, heavier; good for harsh duty |
| Transformerless | Lighter, efficient; watch neutral and fault behaviour |
| Overload capability | Inrush of downstream transformers and short faults |
| Environmental rating | Dust, heat and humidity |
| Battery system | Voltage, runtime and maintenance. See batteries |
Worked example: a control room and labs (illustrative)
| Phase | Single-phase loads | Current at 230 V |
|---|---|---|
| R | Control servers 9 kW at 0.95 | about 41 A |
| Y | Lab instruments 6 kW at 0.9 | about 29 A |
| B | Lighting and PCs 4 kW at 0.95 | about 18 A |
Total about 19 kW, which a 30 kVA UPS appears to cover easily. But a three-phase UPS rated 30 kVA gives about 10 kVA, or about 43 A, per phase. R-phase is at about 95% of its current rating (and at the kW limit of a unit rated at 0.9 output power factor) while B is at 42%. The design moved some R-phase loads to B, bringing each phase to roughly 30 A, about 70%. The neutral, carrying the unbalance plus triplen harmonics from electronic loads, was sized at no less than full phase size, and oversized where electronic loads dominate.
Do not check a three-phase UPS against total kVA alone. Each phase has its own limit; one overloaded phase sends the whole UPS to bypass.
Generator interface
- Size the set for UPS input including recharge.
- Use rectifier walk-in and a frequency window that suits the set.
- Check harmonic current against the set’s alternator.
See UPS and DG integration and online UPS.
Per-phase loading sheet
| Phase | Loads | Current | Percent of per-phase rating |
|---|---|---|---|
| R | |||
| Y | |||
| B |
kVA, kW and the load’s power factor
A three-phase UPS carries two ratings, and the load must sit inside both. A unit sold as 100 kVA with an output power factor of 0.9 can deliver 100 kVA or 90 kW, whichever is reached first. Which limit applies depends on the power factor of the load, and modern loads have moved: server power supplies, drives with active front ends and LED lighting all run close to unity, so the kW limit, not the kVA, is now usually the one that bites.
| Load power factor | kW at the 100 kVA limit | The 90 kW limit | What the unit can actually carry |
|---|---|---|---|
| 0.7 lagging | 70 kW | Not reached | 70 kW, limited by kVA |
| 0.8 lagging | 80 kW | Not reached | 80 kW, limited by kVA |
| 0.9 lagging | 90 kW | Reached together | 90 kW |
| 1.0 | 100 kW | Reached first | 90 kW, at only 90 kVA |
| Leading | Set by the maker’s capability chart | Often less than the lagging figure | |
The practical rule is to state the load in kW and its power factor, not in kVA alone, and to ask the maker for the unit’s output capability chart. A load list that says “80 kVA” tells nothing about whether a 100 kVA unit is comfortable or already full. Leading loads need particular care: banks of server supplies with input filters can present a leading power factor at light load, and many inverters must be derated for it.
Sizing the input: rectifier current and battery recharge
The input of a double-conversion UPS has to supply the load, the UPS’s own losses and the battery charger at the same time, and the charger draws most just after an outage, which is also when a generator is most likely to be running. For an 80 kW load on a unit that is 95% efficient, the rectifier delivers about 84.2 kW to the inverter. If the charger is set to put 10 kW back into the battery, the input is about 94.2 kW; at an input power factor of 0.99 that is about 95.2 kVA, or 132 A per phase at 415 V.
That 132 A, not the 111 A that 80 kW alone would suggest, is what the input cable, the input breaker and the supply have to carry. Two settings are worth knowing. The charger’s current limit decides how much the recharge adds, and many units let it be reduced while on generator so that the recharge does not compete with the load for the set’s capacity. And the rectifier’s walk-in time decides how quickly the load is transferred onto a newly started generator; a gradual walk-in over several seconds is far kinder to the set than an instant step.
The type of rectifier matters as much as its rating. A modern transistor rectifier draws an almost sinusoidal current, with input distortion of a few percent and a power factor close to unity, which is what makes it an easy load for a generator. An older six-pulse thyristor rectifier draws a heavily distorted current at a lower power factor, and needs an input filter or a considerably larger generator to run without trouble. The datasheet states which is fitted; read it before sizing anything behind the UPS.
The battery string: voltage, blocks and end-of-discharge current
The battery side of a three-phase UPS is sized as carefully as the AC side, and its worst moment is at the end of discharge. The battery voltage falls as it discharges, but the inverter still needs the same power, so the current rises to its highest just before the battery reaches its end voltage. That end-of-discharge current, not the current at the start, sets the battery cables, the battery breaker or fuses, and the battery’s own discharge rating.
| 12 V blocks in the string | Cells | Nominal voltage | End voltage at 1.75 V per cell | Current at the end, 80 kW load |
|---|---|---|---|---|
| 30 | 180 | 360 V | 315 V | 267 A |
| 32 | 192 | 384 V | 336 V | 251 A |
| 40 | 240 | 480 V | 420 V | 201 A |
The figures assume the battery supplies 84.2 kW for an 80 kW load at 95% efficiency. On the 32-block string the current is about 219 A at nominal voltage and about 251 A at the end of discharge, so cabling sized for the first figure runs hot during the last minutes of every long outage. The number of blocks is fixed by the UPS design, not chosen freely, and the maker’s figure must be followed; what can be chosen is the block capacity, the number of parallel strings and the protection, and those should all be checked against the end-of-discharge current.
Parallel strings bring their own rule. Each string needs its own protective device and an isolator, so that a failed block can be taken out of service without dropping the whole battery, and the strings should be of the same type, age and length so that they share the current evenly. A new string paralleled with an old one carries more than its share and ages to match the old one quickly.
Temperature matters more to a lead-acid battery than almost anything else in the room. Its design life is stated at around 20 to 25 degrees, and as a working rule the life roughly halves for every 10 degrees it runs above that. A battery rated for ten years that sits at 35 degrees beside the UPS it serves can be expected to last about five.
The capacity also falls in the cold, so a battery cabinet in an unheated room in winter delivers less autonomy than its rating. Put the battery where its temperature can be held steady, measure that temperature at the battery rather than at the room thermostat, and keep the UPS’s own heat away from it.
How a three-phase inverter handles load steps and imbalance
A double-conversion inverter regulates its output fast, but not instantly. When a large share of the load switches on at once, the output voltage dips briefly and recovers within a few cycles; the size of that dip and its duration are part of the unit’s published performance and should be checked against the most demanding load on the system. Large single steps — a bank of servers powering up together after maintenance, or a motor started on the UPS against advice — are best broken into stages.
Imbalance between phases is handled better by most modern inverters than by a generator, because each phase is regulated independently. It still costs capacity: a three-phase UPS is rated for a balanced load, and the most heavily loaded phase reaches its limit while the others still have room. A 100 kVA unit is a 33.3 kVA unit per phase, and a phase carrying 40 kVA of single-phase load is overloaded whatever the total says. The per-phase loading sheet on this page exists for exactly that reason, and it should be filled in again whenever single-phase loads are moved.
Acceptance tests for a three-phase UPS
A UPS proves itself in a short set of tests at commissioning, each with a figure to record. The bypass transfers have their own procedure on the static and maintenance bypass page; the tests below cover the rest.
| Test | What to record | Why it matters |
|---|---|---|
| Output voltage on each phase, no load and full load | All three voltages, line to line and line to neutral | Proves regulation and balance before any load relies on it |
| Load step, zero to full and back | The dip and its recovery time, from a recording instrument | Shows whether the inverter suits the largest step on site |
| Mains failure and return at real load | That the load saw no break, and the walk-in time on return | The basic promise of the system |
| Battery discharge at real load | Minutes to end voltage, and block voltages near the end | Measured autonomy, and any weak block, found before an outage finds it |
| Recharge after the discharge | Charger current and the time back to float | Confirms the input sizing above, and that the charger limit is set as intended |
Record the results against the date and the load at the time, and repeat the discharge test every year. A UPS whose measured autonomy falls by a fifth between two annual tests is telling you about its battery long before an outage does; the battery and capacity planning that follows from that is covered on the modular UPS page, and applies just as well to a single large unit.
Common mistakes
- Total kVA checked, phases ignored.
- Motors connected to the UPS output.
- Neutral undersized for electronic loads.
- No derating for a hot, dusty room.
What to send us
Send the load list by phase, the environment and the generator rating. WhatsApp 98852 01608 or use the application engineering enquiry. See modular UPS.
Evidence note. Loads and ratings are illustrative; UPS makers’ data govern.
Questions engineers ask
Is a 100 kVA UPS enough for a load of 100 kVA?
Usually not, because a UPS has a kW limit as well as a kVA limit. A 100 kVA unit with an output power factor of 0.9 delivers at most 90 kW. Most modern loads, such as servers and drives with active front ends, run close to unity power factor, so they reach the 90 kW limit at only 90 kVA. State the load in kW with its power factor, leave margin for growth, and check the maker’s output capability chart, especially for leading loads.
Why do UPS battery cables run hot near the end of an outage?
Because battery current is highest at the end of discharge. The battery voltage falls as it discharges while the inverter still needs the same power, so the current rises. On a 32-block string supplying an 80 kW load, the current is about 219 amps at nominal voltage and about 251 amps at the end voltage of 1.75 volts per cell. Battery cables, fuses and breakers must be sized for the end-of-discharge current, not the starting figure.
Transformer or transformerless?
It depends on isolation, size, efficiency and environment. Transformer-based units provide galvanic isolation and tolerate harsh electrical conditions, at the cost of size and weight, while transformerless units are smaller and more efficient. Isolation can be added externally where the earthing or load requires it.
Can a UPS run motors?
Not recommended for motor starts. The starting current of a direct-on-line motor can overload the inverter and push the load to bypass, disturbing every other load on the UPS. Keep motors on a separate supply, or use drives sized with the UPS maker, and reserve the UPS for loads that need its protection.
How do I handle imbalance?
Balance the single-phase loads across the three phases and check the per-phase ratings of the UPS, because the most heavily loaded phase reaches its limit first. Measure each phase current at peak and redistribute circuits where one phase carries much more, which also reduces neutral current.
What about heat?
Plan cooling for the UPS losses at full load, using the efficiency figure from the data sheet, plus the battery room if separate. High temperature derates the UPS and shortens battery life sharply, so the room has dedicated cooling, temperature alarms and air paths that match the airflow direction of the cabinets.
Values are illustrative. Use manufacturer data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.