In short. Voltage and frequency protection trips or alarms when the supply leaves a safe band. It protects motors and electronics, detects loss of mains, and stops a generator running into abnormal conditions. The settings must allow normal transient dips, such as a motor start on a generator, while still catching real faults. Most nuisance trips come from settings copied from grid practice onto a generator.
Who this page is for: For protection engineers, commissioning teams and maintenance staff setting voltage and frequency relays on generator and grid supplies.
Key facts
- Undervoltage: motor stalling, contactor dropout, loss of supply.
- Overvoltage: insulation stress, AVR faults.
- Underfrequency: overload, governor problems, loss of a source.
- Overfrequency: load rejection, governor faults.
- Generator load steps cause brief dips; use time delays.
- Settings may differ for grid and generator operation.
Protection elements
| Element | Detects |
|---|---|
| Undervoltage | Motor stalling, contactor dropout, loss of supply |
| Overvoltage | Insulation stress, AVR faults |
| Underfrequency | Overload, governor faults, source loss |
| Overfrequency | Load rejection, governor faults |
Worked example: nuisance trips on motor start (illustrative)
A 500 kVA generator dipped to about 82% voltage and 47.8 Hz for about 1.5 s when a large pump started, then recovered.
| Element | Original setting | Result | New setting |
|---|---|---|---|
| Undervoltage | 85%, 0.5 s | Tripped during the start | 80%, 3 s (plus a fast stage at 70%, 0.5 s) |
| Underfrequency | 48 Hz, 0.5 s | Tripped during the start | 47.5 Hz, 2 s (with a fast stage at 46 Hz, 0.5 s) |
| Overvoltage | 110%, 1 s | OK | Unchanged |
The new settings ride through the normal start dip and still trip quickly on a deep collapse. The 0.3 Hz margin on the delayed underfrequency stage is small, so the largest load step was recorded again to confirm it. The settings were checked against the motor and connected equipment limits. See voltage dip and frequency dip.
Do not cure nuisance trips by switching voltage or frequency protection off. Use two stages, a sensitive delayed stage and a deep fast stage, so normal dips pass and real faults trip.
Other uses
- Loss of mains detection in grid-parallel systems. See utility and DG synchronisation.
- Starting and transfer logic. See ATS and AMF logic.
- Underfrequency load shedding. See load shedding.
Voltage and frequency settings
| Element | Stage 1 (level, time) | Stage 2 (level, time) | Checked against |
|---|---|---|---|
| Undervoltage | |||
| Overvoltage | |||
| Underfrequency | |||
| Overfrequency |
The functions and their device numbers
Relay manuals, drawings and settings sheets refer to these elements by their ANSI device numbers, and the same numbers appear on most generator controllers. Using them consistently on the drawings and the settings sheet avoids the confusion of one element being called by three different names on one project.
| Device number | Function | Typical role on a generator installation |
|---|---|---|
| 27 | Undervoltage | Motor protection, loss-of-supply detection, transfer logic |
| 59 | Overvoltage | AVR failure, load rejection, lost neutral on the supply |
| 81U / 81O | Under- and overfrequency | Governor faults, overload, load rejection, load shedding |
| 24 | Volts per hertz (overfluxing) | Transformers and alternators during start-up and run-down |
| 81R | Rate of change of frequency | Loss-of-mains detection for sets paralleled with the grid |
| 78 | Vector shift | Loss-of-mains detection, an alternative to rate of change of frequency |
| 47 | Phase sequence or negative-sequence voltage | Reversed phases after supply work; unbalance |
| 60FL | VT fuse failure | Blocks undervoltage tripping when a VT fuse blows |
Why the underfrequency delay must not be too short
A diesel generator has little stored rotating energy, so its frequency falls quickly when a load is added. The initial rate of fall can be estimated from the inertia constant H, the stored energy in seconds of rated output: rate of fall = step × 50 ÷ (2 × H), with the step as a fraction of the set’s rating. For a step of 40% on a set with H = 0.8 s, the initial rate is 0.4 × 50 ÷ 1.6 = 12.5 Hz per second.
Without any governor action the frequency would reach 47.5 Hz in about 2.5 ÷ 12.5 = 0.2 s. The governor arrests the fall well before that rate carries on, but the result is the same: a large step produces a deep, brief dip, and an underfrequency element with a 0.2 s or 0.5 s delay will trip on something the set handles perfectly well. That is why the delayed stage carries a delay of seconds, and the fast stage sits well below any dip the plant can produce on its largest load step. See frequency dip.
Volts per hertz during start-up and run-down
A transformer or alternator core is designed for a particular ratio of voltage to frequency. If an AVR holds full voltage while the engine is still running up or is slowing down, that ratio rises and the core overfluxes, overheating it and drawing large magnetising currents.
At 45 Hz with the voltage held at 415 V, the ratio is 50 ÷ 45, about 1.11 times its rated value, enough to exceed a typical overfluxing alarm at 1.1 times. Most modern AVRs reduce voltage in proportion to speed below a knee frequency, which prevents this. Where a step-up transformer is energised from the set, check that the AVR’s under-frequency roll-off is enabled and that a volts-per-hertz element protects the transformer.
Measuring the voltage reliably
Voltage elements are only as good as the voltage they measure. Three precautions prevent most false operations.
- Measure all three phases. An undervoltage element that watches one phase misses a fault on the other two; one that watches phase-to-phase voltage may miss a lost neutral that a phase-to-neutral measurement would show.
- Supervise the VT fuses. A blown VT fuse looks like a collapse of one phase. A fuse-failure element compares voltage with current and blocks the undervoltage trip when the voltage disappears without any corresponding change in current.
- Decide whether all phases or any phase should trip. For loss of supply, all three phases low is the right condition. For motor protection, any one phase low may be the right condition. Write the choice on the settings sheet.
Coordinating with load shedding
Where a plant uses underfrequency load shedding, the shedding stages and the generator’s own underfrequency protection must be graded so that load is shed before the generator trips. A typical arrangement sheds the first block at 48.5 Hz and the second at 48.0 Hz, with short delays, while the generator’s delayed underfrequency stage sits at 47.5 Hz with a delay of seconds.
If the generator trips first, the shedding never helps: the plant loses its source instead of its least important loads. Draw the stages on one frequency axis with their delays and check that each one has room to act before the next. See load-shedding automation and priority logic.
Loss-of-mains settings for sets that parallel with the grid
A generator that runs in parallel with the utility must disconnect quickly if the utility supply is lost, so that it does not keep a section of the network energised or reclose out of phase with it. Undervoltage and underfrequency alone may not detect the loss if the generator happens to be matched to the local load.
Rate of change of frequency and vector shift are the usual additions; their settings balance speed of detection against false trips from disturbances on the grid. The utility’s interconnection requirements govern the settings and test method, and the scheme must be proven by a real disconnection test as well as by secondary injection. See utility and DG synchronisation.
Worked settings sheet for a 500 kVA standby set
The table brings the earlier worked example together into a complete two-stage settings sheet for a standby set on an island supply. The figures are illustrative; the equipment limits and measured dips on each site govern.
| Element | Stage 1 (delayed) | Stage 2 (fast) | Reason |
|---|---|---|---|
| Undervoltage (27) | 80%, 3 s | 70%, 0.5 s | Rides through the measured motor-start dip to 82% |
| Overvoltage (59) | 110%, 2 s | 120%, 0.2 s | Allows the brief rise on load rejection; trips fast on AVR failure |
| Underfrequency (81U) | 47.5 Hz, 2 s | 46 Hz, 0.5 s | Below the 48.5 and 48.0 Hz shedding stages |
| Overfrequency (81O) | 52 Hz, 2 s | 55 Hz, 0.5 s | Allows the overshoot on load rejection; catches a governor runaway |
Load rejection: the dip in reverse
When a large load is suddenly disconnected, the same mechanisms that cause a dip on load acceptance cause a rise: the engine speeds up until the governor cuts fuel, and the voltage rises until the AVR reduces excitation. The overvoltage and overfrequency settings must allow for that brief rise, or the set trips just after it has shed a load, at the worst possible moment. Ask the maker for the transient frequency and voltage rise on full-load rejection, check it during the load-bank test, and set the delayed stages above it.
Test it as part of commissioning: reject the largest single load and then full load on the load bank, record the peak voltage and frequency and the time to recover, and confirm that neither delayed stage operated. Repeat the check after any change to the governor or AVR settings, because a faster governor or a stiffer AVR changes the overshoot as well as the dip. Keep the recordings with the settings sheet; they are the evidence that the margins chosen on paper exist on the machine.
Separate settings for grid and generator operation
A board that can be fed from the grid or from a generator often needs two sets of voltage and frequency settings. On the grid, dips are shallow and brief, and tight settings protect equipment well. On a generator, the same settings trip on every large motor start. Numerical relays offer settings groups that change automatically with the source, using breaker status from the transfer controller. Check that the group change is wired, that it follows the actual source and not a selector switch, and that both groups are tested.
Record every element, both groups, the reason for each setting and the date and result of its last test on one settings sheet that stays with the panel. When a nuisance trip happens years later, that sheet shows at once whether the setting was chosen for a reason or copied, and whether the site has changed since it was set.
Setting the elements, step by step
- List the equipment limits: motors, drives, UPS input ranges, transformers and the generator itself.
- Record the largest load step and measure the voltage and frequency dips it produces on the generator.
- Set the delayed stages outside the normal dips, with delays longer than the recovery time.
- Set the fast stages for a genuine collapse, below any dip the plant produces.
- Grade underfrequency against load shedding and against the governor response.
- Confirm VT supervision, phase logic and the separate settings group for grid operation, if there is one.
- Test by secondary injection, then by a real load step, and record the results.
Common mistakes
- Grid settings used on generators.
- Single-stage settings with no delay.
- Protection switched off after nuisance trips.
- Equipment limits not checked.
What to send us
Send relay settings and recordings of the dips during starts. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Settings are illustrative; equipment limits and studies govern.
Questions engineers ask
What underfrequency setting suits a diesel generator?
Usually two stages: a delayed stage around 47.5 Hz with a delay of a couple of seconds, and a fast stage around 46 Hz. A diesel set has little inertia, so a large load step can briefly pull the frequency below 48 Hz, and a short delay at 48 Hz trips on dips the set recovers from. Grade the stages below any load-shedding stages and confirm them against the measured dip on the largest load step.
Why should undervoltage tripping be blocked on a VT fuse failure?
A blown VT fuse makes one phase voltage vanish at the relay while the supply is perfectly healthy, so an undervoltage element would trip the plant for no reason. A fuse-failure element compares the voltages with the currents: if voltage disappears without any change in current, it blocks the undervoltage trip and raises an alarm instead.
Why does the relay trip during motor start?
Because a large motor start pulls the voltage down, especially on generator supply, and if the dip goes below the undervoltage pickup for longer than its delay, the relay trips. Lengthen the delay to ride through the largest start, or reduce the dip with a soft starter, a drive or a staged start, rather than lowering the pickup until it no longer protects anything.
What is volts-per-hertz protection?
Protection against overexcitation of generators and transformers when voltage is high relative to frequency, for example when a set runs at rated voltage while still below rated speed. The magnetic flux is proportional to voltage divided by frequency, and excessive flux overheats cores. The relay trips when that ratio stays above a set limit.
Is loss-of-mains protection mandatory?
For generators that run in parallel with the utility, usually yes, as set by the utility interconnection rules. It disconnects the generator if the grid is lost so the set cannot keep part of the network energised. Standby sets that never parallel with the grid do not need it.
Can one relay cover all of these?
Yes. Modern multifunction generator and interface relays include under and over voltage, under and over frequency, rate of change of frequency, vector shift and volts per hertz, each with independent settings. The remaining question is redundancy: whether the utility or the site requires a second, independent device.
This guide gives general principles. Settings must follow equipment and utility requirements.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.