Arc-Flash Risk and Mitigation Engineering Guide

What arc flash is, what sets incident energy, how a study is structured, and mitigation options: faster clearing, maintenance mode, arc detection, remote operation and labelling.

In short. An arc flash is an explosive release of energy from an electrical fault through air. The danger depends on four things: the fault current available, how long the protection takes to clear it, how far away a person is working and how the equipment is built. Because energy rises roughly in proportion to clearing time, the most effective mitigation is faster clearing. After that comes keeping people out of reach of live equipment.

Who this page is for: For electrical engineers, safety managers and maintenance teams working on or near LV switchboards and generator panels.

Key facts

  • Incident energy rises roughly in proportion to clearing time.
  • Higher fault current does not always mean more energy; a slow-clearing lower current can be worse.
  • Energy falls quickly with distance from the arc.
  • Maintenance switches, arc detection and zone interlocking shorten clearing time.
  • Remote racking and switching keep people away.
  • Label equipment with the assessed hazard and required protection.

What sets the hazard

  • Fault current available at the equipment. See fault levels.
  • Clearing time of the upstream protection.
  • Gap, enclosure and electrode configuration.
  • Working distance.

Worked example: the effect of clearing time (illustrative)

An LV main board is fed by an incomer whose short-time delay is set at 0.4 s for selectivity. Relative incident energy is compared with that setting.

MeasureClearing timeRelative energy
Normal setting (selectivity delay)0.4 s100%
Maintenance switch: instantaneous while people workabout 0.05 sabout 13%
Arc detection tripping the incomerabout 0.05 sabout 13%, all the time
On generator supply, lower current, inverse-time elementabout 1 scan exceed the grid case

The generator case surprised the site: with lower fault current, the overcurrent element took longer, so the arc lasted longer. The study was repeated for generator operation and arc detection was added, with its current check and the maintenance-switch pickup both set below the generator fault current. See busbar protection and setting philosophy.

Do not assume that generator supply is “safer” because fault current is lower. Slower clearing can give more arc energy. Assess both sources and reduce clearing time where people work.

Mitigation

MeasureHow it helps
Maintenance switch (temporary fast settings)Shortens clearing while people work
Arc detection relaysTrip in milliseconds on light and current
Zone selective interlockingFast trip for faults inside a zone
Remote racking and operationKeeps people away
Arc-resistant constructionDirects energy away from the front, with doors closed and latched
Safe work practices and isolationRemoves the hazard

See switchboard architecture and device selection.

Arc flash review sheet

Four boards on the reference site used across this section, which are not the boards in the example above. Incident energy rises in proportion to clearing time, so the product of current and time is a fair way to rank exposure — and ranking them that way puts them in an order most sites would not predict.

BoardFault current (grid / generator)Clearing time (grid / generator)Mitigation
Main LV board, normal settings25 kA / 1.0 kA0.08 s / 0.08 sZone interlocking and arc detection in place; remote racking fitted
Main LV board, maintenance setting engaged25 kA / 1.0 kA0.05 s / 0.05 sSwitch engaged and verified before any work inside the enclosure
Sub-board 3, no bus protection18 kA / 1.0 kA0.3 s / about 60 s on the thermal elementThe worst exposure on the site, at the lowest fault current. Add a maintenance switch and bring the magnetic setting below 1044 A
Motor control centre, feeder 422 kA / 1.0 kA0.02 s / 0.02 sCurrent-limiting device already fitted; adequate
    
    

Rank them by current and time together. On grid supply the main board gives 25,000 × 0.08 = 2000 ampere-seconds and sub-board 3 gives 18,000 × 0.3 = 5400 — nearly three times the exposure at two thirds of the fault current. On generator supply the gap becomes absurd: the main board is 1000 × 0.08 = 80, and sub-board 3, with nothing but a thermal element that takes about a minute, is 1000 × 60 = 60000. That is 750 times the exposure, at the board nobody worried about because its fault level was lower.

That is the whole argument of this page in one row. A fault level study on its own ranks these boards in exactly the wrong order, and the engineer most at risk on this site is the one working on the smallest board while the generator is running.

The second row is also worth noting for what it costs: a maintenance setting that temporarily lowers the pickup and removes the grading delay cuts the clearing time while someone is inside the enclosure, and it is a software setting on equipment that is already installed. It has to be engaged deliberately and proved, because a setting that nobody verified before opening the door is no protection at all.

Worked example: distance and the arc flash boundary (illustrative)

Incident energy falls with distance from the arc. For low-voltage switchgear the fall is commonly modelled with a distance exponent of about 1.5, so doubling the distance cuts the energy to about 0.51.5 ≈ 35% of its value.

ItemWorkingResult
Energy at the 455 mm working distanceFrom the study8 cal/cm²
Energy at 910 mm, double the distance8 × 0.35about 2.8 cal/cm²
Arc flash boundary, where energy falls to 1.2 cal/cm²455 × (8 ÷ 1.2)1 ÷ 1.5 = 455 × 3.54about 1.6 m

The boundary is the distance at which an unprotected person would just receive a second-degree burn. Inside it, arc-rated clothing is required; outside it, it is not. Remote racking, a long-handled operating tool or an infrared window works by putting the person beyond that line.

The arc draws less than the bolted fault

At low voltage the arc itself has resistance, so the arcing current is often around half of the bolted fault current. A study therefore checks the protection against the arcing current, not just the bolted figure, and usually against a reduced arcing current as well, because a slightly lower current can drop below an instantaneous pickup and onto a slow curve. Where that happens the lower current gives the higher energy. See fault types and protection selection.

What an arc flash label should show

  • The nominal voltage and the equipment it applies to.
  • The incident energy at the stated working distance, or the protective equipment category used.
  • The arc flash boundary.
  • The date of the study and the settings it assumed.
  • On sites with a generator, the worse of the grid and generator cases, or both values, because the generator case is often the larger.

A label based on settings that have since changed is worse than no label, because it gives confidence that is no longer earned. Tie the labels to the settings record and relabel after any change.

What the study needs, and why

InputWhy it matters
Transformer and generator ratings and impedancesSet the bolted and arcing fault currents on each source
Cable lengths and sizesReduce the fault current at remote boards
Every protective device and its actual settingsSets the clearing time, the factor energy depends on most
Equipment type, enclosure size and conductor gapChange how the arc develops and how much energy reaches the front
Working distances for each taskEnergy falls steeply with distance
Operating modes: grid, generator, parallel, maintenance settingEach mode gives a different current and time

Isolate first; justify live work

The safest arc-flash measure is to make the equipment dead before work starts. Live work should need a written justification, a permit naming the hazard and the protective measures, and a second person present. Testing for absence of voltage is itself done with the equipment assumed live, so it is planned with the same care. Where a task is repeated often, such as reading a meter or racking a breaker, change the equipment so the task can be done without opening the enclosure.

Common mistakes

  • Assessing grid supply only.
  • Long selectivity delays on incomers with no fast option for maintenance.
  • Working live when isolation was possible.
  • No labels on equipment.

What to send us

Send the single-line diagram, fault levels and protection settings. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Relative energies are approximate illustrations; an arc flash study governs each site.

What actually reduces the energy, in order of effect

Incident energy rises with clearing time and falls with distance, and those two facts rank every available measure. In rough order of how much they achieve for what they take to put in place:

  1. Shorten the clearing time. This is first because the relationship is close to proportional: halve the time and you halve the energy. On equipment already installed it is often a settings change — a maintenance setting, a zone interlocking scheme configured in trip units that already support it — rather than new hardware. The sub-board in the sheet above is the usual case: nothing is wrong with it except that nothing is in a hurry to clear a fault on it.
  2. Keep people further away, or out entirely. Energy falls steeply with distance, so remote racking, remote switching and infrared windows that allow a survey with the door closed remove the exposure rather than reducing it. A thermography survey through a closed window is also a better survey, because the board is under load.
  3. Reduce the time people are in front of an open enclosure. Work planned so that the board is opened once, with the parts and drawings already to hand, is less exposure than three visits. This costs nothing and is routinely overlooked.
  4. Current-limiting devices. Where they fit, they clear so quickly that both the current and the time are cut together.
  5. Arc-resistant construction. Effective and expensive, and it directs the energy rather than reducing it, so it belongs in new build rather than retrofit.
  6. Protective equipment. Last on the list deliberately. It is essential and it is the layer that assumes everything above it has failed; it does nothing to reduce the energy released.

One measure is missing from the list because it does not work: reducing the available fault current. It feels like the obvious lever and it usually makes things worse, because a weaker source means the protection takes longer to pick up, and the time grows faster than the current falls. That is precisely what the generator column of the sheet above records.

Then label the equipment with what was assessed, and date the label. An arc flash study is a snapshot of a particular set of settings and a particular supply arrangement; add a generator, uprate a transformer or change a relay setting and the study needs revisiting. A label with no date on a board whose settings have moved is worse than no label, because it will be believed.

Questions engineers ask

How far does arc-flash energy fall with distance?

For low-voltage switchgear it is commonly modelled as falling with distance to the power of about 1.5, so doubling the distance cuts the energy to about 35%. If a study gives 8 cal/cm2 at 455 mm, the energy at 910 mm is about 2.8 cal/cm2. Remote racking and operation work by moving people outside the arc flash boundary.

What is the arc flash boundary?

The distance from the arc at which the incident energy falls to 1.2 cal/cm2, the level at which unprotected skin would just receive a second-degree burn. With 8 cal/cm2 at a 455 mm working distance and a distance exponent of 1.5, the boundary is about 455 times 3.54, roughly 1.6 m. Arc-rated clothing is required inside it.

Does a lower fault current reduce arc-flash energy?

Not always. Energy depends on current and clearing time together, and a lower current can fall below an instantaneous or short-time pickup onto a slow inverse-time curve. On generator supply a fault of about 1 kA cleared by a thermal element in a minute can give far more energy than a 25 kA fault cleared in 0.08 s. Study both sources.

What is a maintenance mode switch?

A selector that applies temporary fast settings, usually by removing the grading delay or lowering the instantaneous pickup, while people work on or near live equipment. It can cut clearing from 0.3 or 0.4 s to about 0.05 s. It must be engaged deliberately, confirmed before the enclosure is opened, and returned to normal afterwards.

How often should the study be updated?

Whenever something that affects fault current or clearing time changes: a new transformer or generator, changed protection settings, new switchgear or a changed operating mode. Many sites also review it every few years to catch undocumented changes. Relabel the equipment each time, because a label based on old settings gives false confidence.

Is PPE enough?

No. Protective clothing is the last line of defence and assumes everything else has failed. First make equipment dead before work, then shorten clearing time, then keep people further away with remote racking, remote switching and infrared windows. Clothing is then chosen for the energy that remains, not used to make an unchanged hazard acceptable.

This guide gives general principles. Arc-flash studies must be performed by qualified engineers.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.