In short. To size a servo stabiliser, convert every load to kVA, combine them with realistic diversity, and add a margin for growth. Then make two checks that decide most real selections: can the unit carry the largest motor start within its short-time overload rating, and does it still deliver the full output at the lowest input voltage the site sees? Pick the next standard rating that passes both. Connected load is where you start, not the answer.
Who this page is for: For electricians, facility managers and buyers sizing a servo voltage stabiliser for a factory, workshop, office or building.
Key facts
- Single phase: kVA = V × I ÷ 1000. Three phase: kVA = √3 × V × I ÷ 1000.
- From kW: kVA = kW ÷ power factor. Add kVA, not kW, across loads with different power factors.
- Starting kVA ≈ running kVA × (starting current ÷ full-load current); direct-on-line is often 6 to 7 times.
- Check the starting surge against the unit’s short-time overload rating, not its continuous rating.
- Many stabilisers give reduced output at the bottom of their input range; check the maker’s low-input rating.
- Use measured demand where you can; gross oversizing wastes money and space and adds no-load losses.
Conversion formulas
Method
- List each load with nameplate kW or current, and a realistic power factor.
- Convert each load to kVA.
- Add loads that run together; apply diversity to those that do not.
- Check the largest motor start against the short-time overload rating.
- Add a growth margin from the site’s plans, not a fixed habit.
- Check the output rating at the lowest logged input voltage. See wide-range stabilisers.
- Choose the next standard rating that passes every check.
Worked example: a three-phase workshop (illustrative)
| Load | kW | PF | kVA |
|---|---|---|---|
| Machine motors including the 22 kW motor (running together) | 45 | 0.85 | 52.9 |
| Lighting and small power | 10 | 0.9 | 11.1 |
| Air conditioning | 20 | 0.8 | 25.0 |
| Total running | — | — | 89.0 |
With 20% growth the design load is about 107 kVA, so a 125 kVA unit is the first candidate. Now the two checks.
| Check | Working | Result |
|---|---|---|
| Largest motor: 22 kW compressed-air plant, direct-on-line | Running about 27 kVA; starting at 6 times ≈ 162 kVA for a few seconds | Load during the start ≈ 89 − 27 + 162 = 224 kVA |
| Short-time capability of the 125 kVA unit | Assume 150% for the duration of the start | About 188 kVA: not enough |
| Same motor on a star-delta starter | Starting at about one-third of DOL ≈ 54 kVA | Load during the start ≈ 89 − 27 + 54 = 116 kVA: within the rating |
| Low input voltage | Logged minimum 340 V; maker gives full output down to 320 V for this range | Passes, with margin |
The answer is a 125 kVA unit with the motor on a star-delta or soft starter, not a 200 kVA unit to swallow a direct-on-line start. See motor starting.
Motor starting in kVA terms
| Starting method | Starting current (× full load) | Effect on stabiliser sizing |
|---|---|---|
| Direct-on-line | About 6 to 7 | Largest surge; check short-time overload |
| Star-delta | About 2 to 2.5 | Reduced surge, with a transition spike |
| Soft starter | About 2.5 to 4, adjustable | Controlled; sizing close to running |
| Variable speed drive | About 1 to 1.5 | Running current plus harmonics; check thermal rating |
Do not size a stabiliser from breaker ratings or the sum of nameplates alone. Check the largest motor start and the lowest input voltage; those two checks, not the running total, are what cause most undersized and oversized purchases.
Second example: a single-phase workshop (illustrative)
| Load | Voltage | Current | kVA |
|---|---|---|---|
| Welding transformer (intermittent) | 230 V | 35 A | 8.1 |
| Compressed-air plant | 230 V | 14 A | 3.2 |
| Lighting and fans | 230 V | 10 A | 2.3 |
| Total running | — | — | 13.6 |
The welder draws in bursts, so the unit must handle its peak with the other loads running. Check the motor’s start the same way, against the short-time overload rating. Add growth, then choose the next standard size with the maker’s low-input rating checked.
Non-linear loads
Drives, UPS units and LED drivers draw harmonic current that heats windings beyond what the kVA figure suggests and can load the neutral heavily. Where these dominate, give the maker the harmonic data and check the thermal rating and neutral sizing.
Efficiency and heat
A stabiliser’s losses become heat in the room, typically a few percent of the load. A grossly oversized unit has higher no-load losses and takes more space, so keep real margins for starts and growth but avoid habit-driven oversizing. See air-cooled stabilisers for room ventilation.
Verification after installation
Record the output current at the busiest time and at a large motor start. Work out the loading as a percentage of rating. If it runs consistently high, plan load transfer or an upgrade before summer. See selection and sizing.
Stabiliser sizing worksheet
A smaller workshop than the one in the example above, itemised load by load instead of grouped, and worked with the page’s own formulas: kVA = kW ÷ power factor for each load, added as kVA because the power factors differ, and the current from kVA × 1000 ÷ (√3 × 415).
| Load | kW or A | PF | kVA | Runs with others? | Starting method |
|---|---|---|---|---|---|
| Lathe | 7.5 kW, 12.7 A | 0.82 | 9.1 | Yes | Direct on line, small enough to ignore |
| Welding set | 16.7 A | 0.60 | 12.0 | Yes, intermittently | No motor start |
| Coolant pump | 11 kW, 17.9 A | 0.85 | 12.9 | Yes, cycles | Direct on line — 6.5 times, so 83.9 kVA |
| Lighting and sockets | 4 kW, 5.8 A | 0.95 | 4.2 | Yes | None |
| Grinder | 3 kW, 5.3 A | 0.80 | 3.8 | Yes | Direct on line, small |
| Total running | — | — | 42.0 | All together | — |
42.0 kVA running, so a 50 kVA unit — and that is the answer most quotations would give. It is wrong twice over, for two reasons the sheet is built to expose.
The low-input rating. The worst input measured at this site was 340 V, and most servo units deliver appreciably less than their nameplate at the bottom of their range — commonly around 80%. A 50 kVA unit at 340 V input gives about 40 kVA, which is less than the 42.0 kVA this workshop actually draws, so the unit would be in overload every afternoon. The nameplate figure is quoted at nominal input; the figure to size against is the one at the lowest input you measured.
The starting surge. The pump starting direct on line asks for 6.5 × 12.9 = 83.9 kVA, on top of the 29.1 kVA the other loads are already drawing — 113.0 kVA for a second or two. That has to sit inside the unit’s short-time overload rating, not its continuous rating, and a unit allowing 200% for a few seconds needs a continuous rating above 57 kVA to carry it.
Both roads lead to the same place: 63 kVA. At 340 V it still delivers about 50 kVA against the 42.0 needed, and its 200% short-time covers the 113 kVA surge. Fitting star-delta on the pump would cut that surge to 29.1 + 28.0 = 57.1 kVA and is worth doing anyway — it is the same fix that removes the 1.4 s dip the whole workshop sees six times a shift.
Worked example: unequal phase loads (illustrative)
A three-phase site measures 28 kVA on the red phase, 22 kVA on the yellow phase and 17 kVA on the blue phase. The total is 67 kVA, but a three-phase stabiliser with a common servo divides its rating equally across the phases, so each phase can carry only one third of it. The red phase at 28 kVA sets the size: three times 28 is 84 kVA, before any margin. An independent phase control stabiliser handles the different voltages on each phase better, but its rating per phase is still set by the most heavily loaded phase. Balancing loads across phases first often allows a smaller unit.
Choosing the input voltage range
| Site supply | Typical input range to specify |
|---|---|
| Urban supply with small variation | A narrow range around nominal |
| Industrial area with evening dips | A wider range reaching well below nominal |
| Rural or end-of-line supply | A very wide range, with the rating checked at the lowest input |
A wider range costs more and lowers output at the low end, so the range is chosen from recorded voltages, not guesses.
Temperature and ventilation
Stabiliser ratings assume a maximum ambient temperature. In a hot electrical room, the unit may need derating, or the room needs better ventilation. The losses of the chosen stabiliser, converted to heat, are added to the room ventilation calculation.
Rounding to a standard size
After the calculation, choose the next standard size above the result, not below. If the result is very close to a standard size, the next one up gives room for growth and hot days.
Checking the choice after installation
Once the stabiliser is in service, record input and output voltages and phase currents at the busiest time of day. Comparing them with the sizing figures confirms the unit is working within its range and shows how much margin remains for new loads.
Common mistakes
- Adding kW instead of kVA.
- Ignoring motor and pump starts.
- Using breaker size as demand.
- Forgetting reduced output at low input voltage.
- Adding a fixed 25% to everything instead of using data.
What to send us
Send nameplates or measured currents, the starting methods of large motors and a voltage log if you have one. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. Overload and low-input figures are assumptions for illustration; the stabiliser maker’s ratings govern.
Questions engineers ask
How are unequal phase loads handled when sizing a stabiliser?
The most heavily loaded phase sets the size. In the illustrative site with 28, 22 and 17 kVA on the phases, a common-servo three-phase unit needs at least 84 kVA before margin. Balancing loads across phases first often allows a smaller, cheaper stabiliser that runs cooler.
What input voltage range should a stabiliser have?
A narrow range for urban supplies with small variation, a wider range reaching well below nominal for industrial areas with evening dips, and a very wide range for rural or end-of-line supplies, with output checked at the lowest input, all chosen from recorded voltages rather than guesses.
Does room temperature affect stabiliser sizing?
Yes. Ratings assume a maximum ambient temperature, so a unit in a hot electrical room may need derating or better ventilation. The losses of the chosen stabiliser, converted to heat, are added to the room ventilation calculation to keep the unit within its rating through the hottest months.
Should a stabiliser be rounded up or down to a standard size?
Always up to the next standard size above the calculated result. If the result is very close to a standard size, the next one up gives room for growth and hot days, and checking voltages and currents after installation confirms the remaining margin for new loads.
Is kVA the same as kW?
No. kW is the real power that does work and kVA is the apparent power the stabiliser must carry; kW equals kVA multiplied by the power factor. A 40 kW load at a power factor of 0.8 needs 50 kVA, so a stabiliser is always sized in kVA, using the measured or estimated power factor.
How do I include motor starts?
Check the starting kVA of the largest motor against the short-time overload rating of the stabiliser. A direct-on-line start can draw several times the running current for a few seconds, and the stabiliser must carry it on top of the running load without tripping or a deep output dip. Soft starters reduce it.
Should I add 25% always?
No. A fixed percentage hides the real question. Use the measured demand, the motor starting requirement and the loads in the site plan, and add a modest margin for change; a blanket 25% can oversize a unit that was already sized from breaker ratings, or undersize one where a large motor is planned.
What if my loads are nonlinear?
Check the thermal rating and the neutral current against harmonic data from the actual loads. Nonlinear loads heat the transformer more than their kVA suggests, and triple harmonics add in the neutral, so the maker may recommend a larger rating, a larger neutral or a K-rated design for that load mix.
Values are illustrative. Use nameplate and maker data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.