In short. A decarbonisation roadmap stages the work over several years. Measure the baseline, take the quick wins, choose a route for each set, add storage where it cuts run hours, replace sets at the end of their life, and track the results. Reliability of critical supply is the constraint throughout: no step may leave a critical load without a proven source. Most fleets find their cheapest early savings in idle running, light loading and poor maintenance, not in new technology.
Who this page is for: For sustainability, facility and engineering managers responsible for a fleet of diesel generators across one or more sites.
Key facts
- Burning one litre of diesel releases about 2.68 kg of CO₂.
- Fleet emissions (t CO₂ per year) ≈ litres per year × 2.68 ÷ 1000.
- Litres per kWh is the best single efficiency measure; light loading makes it worse.
- Quick wins (idling, test running, loading, maintenance) often save around 5 to 15% of fuel.
- Storage cuts run hours by carrying short outages without a start.
- Every change is tested on load before the old arrangement is removed.
The six stages
| Stage | Actions | Output |
|---|---|---|
| 1. Baseline | Inventory, run hours, fuel bought and used, loading, emissions estimate | A fleet register with litres, kWh and t CO₂ per set. See legacy compliance |
| 2. Quick wins | Maintenance, stop idle and unnecessary test running, right-size loading | Fuel savings within the first year |
| 3. Route per set | Retrofit, dual fuel, renewable diesel, gas or replacement | A decision per set. See the decision framework |
| 4. Storage | Batteries to carry short outages and peaks | Fewer starts and run hours. See hybrid modernisation |
| 5. Replacement timing | Replace at end of life with compliant, flexible-fuel units | No stranded investment |
| 6. Monitor | Track fuel, hours, kWh and emissions | Annual report. See documentation |
Building the baseline
For each set, record kVA, age, run hours, starts, fuel used and kWh generated. If there is no kWh meter, estimate from average load and hours, and fit one: without kWh, you cannot see efficiency. A set showing 0.40 litres per kWh when similar sets show 0.28 is either lightly loaded, poorly maintained or both. See the fuel consumption chart for expected values by size and load.
Worked example: a ten-set fleet (illustrative)
A company has ten sets across its sites, burning 60,000 litres a year.
| Step | Working | Result |
|---|---|---|
| Baseline emissions | 60,000 × 2.68 ÷ 1000 | About 161 t CO₂ per year |
| Year 1 quick wins: stop idling, cut off-load test time, fix two poorly maintained sets | About 10% fuel saving | About 6000 litres and 16 t CO₂ saved |
| Year 2 storage at the two sites with frequent short outages | Removes about 40% of their starts and 25% of their run hours | About 5000 litres and 13 t CO₂ saved |
| Years 3 to 5: replace the three oldest high-hour sets at end of life | Better litres per kWh and correct sizing | About 4000 litres and 11 t CO₂ saved |
| Total after five years | 15,000 of 60,000 litres | About 25% less fuel and about 40 t CO₂ per year |
The figures show the order of the savings, not a promise: the first year’s quick wins cost least and pay fastest.
Quick wins that cost little
| Action | Benefit |
|---|---|
| Service on schedule; fix injector, air filter and turbo problems | Cleaner combustion, lower fuel use |
| Stop idling and shorten off-load test runs; test on load instead | Fuel saved, and fewer light-load deposits |
| Right-size loading; avoid running large sets at light load | Better litres per kWh. See light load and wet stacking |
| Fix fuel quality and storage problems | Reliability, cleaner running |
| Meter fuel and kWh on every set | Visibility of where the fuel goes |
Choosing a route per set
| Route | Suits | Check first |
|---|---|---|
| Retrofit emission control device | Sound sets with years of life left | Approval and back-pressure limits |
| Dual fuel (diesel and gas) | Sites with a reliable gas supply | Substitution rate, engine suitability |
| Renewable diesel (HVO) | Drop-in fuel change without hardware | Engine maker approval, supply and cost |
| Replacement | Old, high-hour or wrongly sized sets | Timing against end of life. See replacement vs retrofit |
No decarbonisation step may weaken critical supply. Keep the old arrangement in service until the new one has been tested on load, and use temporary power during works. See rental power.
Governance and reporting
- Name an owner, set targets and review dates, and budget by year.
- Present results to management at fixed intervals.
- Include service partners in planning. See AMC.
- Report honestly: what was done, what the data show and what remains. Overclaiming harms credibility.
- Update the roadmap when rules or technology change.
Metrics to track
- Run hours and starts per set per year.
- Litres per kWh per set.
- t CO₂ per year, fleet and per site.
- Emission test results.
- Downtime events and failed starts.
Fleet baseline worksheet
The numeric baseline for the same seven-set fleet: a pharmaceutical contract manufacturer with three units, a warehouse and a site office. The example above follows a ten-set fleet burning 60,000 litres a year through five years of savings; this is a different and much heavier fleet at the stage before any of that — the measurement itself, set by set, which is what the first year of any roadmap actually consists of. Litres per kWh is the column that does the work, and it is the only one here that cannot be read off a meter.
| Set | kVA and age | Run hours per year | Litres per year | kWh per year | Litres per kWh | Route |
|---|---|---|---|---|---|---|
| A | 500 kVA, 2016 | 2600 | 160,000 | 728,000 | 0.22 | Emission control retrofit |
| B | 500 kVA, 2011 | 2400 | 162,000 | 624,000 | 0.26 | Overhaul first, then reassess |
| G | 1010 kVA, 2014 | 1200 | 133,200 | 532,800 | 0.25 | Resize to the load that is actually there |
| C | 320 kVA, 2019 | 1800 | 72,000 | 345,600 | 0.21 | Dual fuel, subject to supply and approval |
| D | 250 kVA, 2008 | 900 | 21,600 | 72,000 | 0.30 | Replace and consolidate its board |
| E | 200 kVA, 2021 | 300 | 6100 | 26,400 | 0.23 | Keep |
| F | 125 kVA, 2006 | 60 | 600 | 1800 | 0.33 | Keep, document, restrict use |
| Fleet | — | 9260 | 555,500 | 2,330,600 | 0.24 | About 1489 t CO₂ a year |
The carbon figure follows directly from the litres: 555,500 × 2.68 ÷ 1000 gives about 1489 t CO₂ a year, and no other input is needed for it. That is worth saying plainly, because a great deal of effort gets spent on carbon accounting when the only measurement that matters at this stage is the fuel delivered. Once the litres are right, the tonnes are arithmetic.
Three findings come out of the sheet, and the first one reorders the whole programme.
Three of the seven sets are 82% of the fuel. A, B and G burn 455,200 of the 555,500 litres. The other four, together, are 100,300 litres — and D, E and F between them are 28,300 litres, just over 5% of the fleet. That means no capital change to D, E or F can move the fleet figure by more than a rounding error, however old those sets are and however bad their litres per kWh looks.
F is the extreme case: at 600 litres a year, its entire annual carbon is about 1.6 t, so a device costing anything at all can never repay on it. The fleet’s attention belongs on three sets, and the sheet is what proves it rather than asserting it.
Set B burns more fuel than Set A while producing less energy. Two identical 500 kVA sets on the same site: B takes 162,000 litres to deliver 624,000 kWh, and A takes 160,000 litres to deliver 728,000 kWh. B uses 2000 litres more for 104,000 kWh less. Nothing else on the sheet makes the case for an overhaul as flatly as that one comparison, and it is only visible because both sets are measured in the same two columns. Bring B to A’s 0.22 litres per kWh and the saving is 162,000 minus 137,280, so about 24,700 litres and 66 t CO₂ a year, from an overhaul that was due anyway.
Set G’s figure is a sizing fault, not a condition fault, and it is worth almost as much. G is sound. It is simply a 1010 kVA set being asked for 444 kW, which is 55% load, and at 55% a diesel engine spends more fuel per unit of energy than the same engine at 80%.
Delivering the same 532,800 kWh on a correctly sized set at about 0.21 litres per kWh takes roughly 111,900 litres, so the saving is about 21,300 litres and 57 t CO₂. Put beside B, the two findings together are about 46,000 litres and 123 t a year — 8% of the fleet’s fuel — and they have completely different causes, completely different fixes, and look identical in any report that lists litres per kWh without the load factor beside it.
One caution about the right-hand column. Every route on this sheet is a proposal at baseline stage, and two of them — the retrofit on A and the dual fuel on C — depend on rules and supplies that have to be confirmed before anything is ordered. The baseline’s job is to say where the fuel is and what each change would be worth. It is not an approval, and a roadmap that commits to a route before the rules for that set’s rating and location have been checked in writing has skipped the only stage that can stop it.
Revisiting the roadmap each year with the latest fuel, hours and emissions figures keeps it a working plan rather than a document filed after approval.
Common mistakes
- Starting with technology before measuring the baseline.
- No kWh metering, so efficiency is invisible.
- Replacing sound sets early while idle running continues.
- Removing the old source before the new one is proven.
- Claiming savings the data do not show.
What to send us
Send your fleet list with kVA, age, run hours and fuel use, and your targets. WhatsApp 98852 01608 or use the enquiry form. Start from the emissions and power-transition overview.
Evidence note. The example is illustrative. The CO₂ factor is the commonly used value for diesel combustion; actual savings depend on each fleet’s data.
Questions engineers ask
How often should a generator decarbonisation roadmap be updated?
At least yearly, using the latest fuel, running hours and emissions figures, and whenever a major change occurs such as new equipment or rules. Regular updates keep the roadmap a working plan rather than a document filed away after approval. Each update is dated and summarised for management.
What makes a decarbonisation roadmap credible?
A measured baseline, stages with dates and owners, metrics that are tracked consistently, and decisions recorded with their reasons. Reporting progress against the same metrics each year shows whether the plan is delivering, and where it needs adjusting. Independent review of the figures adds further confidence for stakeholders.
Can decarbonisation weaken backup power?
It can if handled carelessly. Each stage is checked so every critical load still has a source for the longest credible outage, and remaining generators are maintained and tested properly even when they run fewer hours. The roadmap therefore includes a resilience check at every stage, signed off before work begins.
Which metrics best show decarbonisation progress?
Fuel used and generator hours per year, emissions calculated on a consistent basis, the share of energy from solar or other low-carbon sources, and the number of outages carried without generator starts, all compared with the baseline year. The same calculation method is used every year so results remain comparable.
Where do I start?
With the baseline: for each set, the running hours, fuel used, energy delivered, average load and measured emissions over a representative year. Without it, no later improvement can be shown. Fuel records, controller logs and a few weeks of load logging usually provide enough to start.
What are quick wins?
Maintenance that restores fuel efficiency, load management that keeps sets at a healthy load, and removing idle or no-load running such as long warm-ups and unnecessary test runs. These cost little, start saving fuel at once, and make the later, larger steps easier to judge against a cleaner baseline.
How long should the roadmap be?
Typically several years, because the larger steps such as replacing sets, adding batteries or changing fuels follow equipment life and budgets. Review it every year against the baseline and the latest rules, fuels and prices, and adjust the later steps as the earlier ones deliver their results.
How do I track progress?
By fuel used, running hours, energy delivered and measured emissions for each set, compared with the baseline every month or quarter. Litres per kilowatt-hour shows efficiency, hours show how much the sets are needed, and periodic emission tests confirm the effect of each change on the exhaust.
General guidance only. Values illustrative.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.