In short. Retrofit makes sense when the engine and alternator are sound, the set is still the right size, and the duty suits the option chosen. Replace when the set is worn, unreliable, too small for today’s load, or cannot meet the rules economically. Base the decision on a condition assessment and a load test, and compare lifetime cost and risk, not purchase price.
Who this page is for: For owners and facility managers deciding whether to invest in an existing generator or replace it.
Key facts
- Assess condition by inspection and a load test, not by age alone.
- High oil consumption, blow-by and smoke point to engine wear.
- Check alternator insulation and the availability of spares.
- Check the set still matches today’s and tomorrow’s load.
- Compare lifetime cost, including the cost of a failure.
- Plan temporary power for any changeover.
Worked example: two sets assessed (illustrative)
| Check | Set A, 20 years old | Set B, 8 years old |
|---|---|---|
| Oil consumption | About three times normal | Normal |
| Smoke on load | Blue-black | Clear |
| Load test at rated output | Voltage and frequency unstable above 80% | Stable at 100% |
| Alternator insulation | Low readings | Good |
| Control spares | No longer made | Available |
| Size against today’s load | Too small after growth | Adequate |
| Decision | Replace | Retrofit emission control |
A retrofit on set A would have added cost to a set that was failing anyway. See retrofit selection and route comparison.
Do not retrofit a set that is too small for the load or fails its load test. The retrofit will not fix either problem, and the set will be replaced soon anyway.
Lifetime comparison
| Element | Keep and retrofit | Replace |
|---|---|---|
| Up-front | Overhaul and retrofit | New set and installation |
| Running | Fuel and maintenance of an older engine | Fuel and maintenance of a new engine |
| Risk | Higher chance of failure | Lower |
| End value | Little | Residual value |
Compare both over the same period. See lifecycle decisions.
Condition assessment sheet
| Check | Finding | Concern? |
|---|---|---|
| Hours and age | ||
| Oil consumption and smoke | ||
| Load test result | ||
| Alternator insulation | ||
| Size against load |
The four routes for an older set
When a generator reaches the point where its condition, its emissions or its fit with the site is in question, there are usually four routes. Each has a place, and the right one depends on the facts of that set rather than on its age alone.
| Route | What it involves | When it suits | Main limits |
|---|---|---|---|
| Continue with better maintenance | Service, repairs and testing to restore performance | Sound set, rules allow continued use, duty unchanged | Does not change emission category |
| Retrofit an approved device | Emission control device fitted to the exhaust | Sound engine, device approved for that model, rules accept retrofit | Back pressure, maintenance of the device, approval scope |
| Repower | New engine on the existing alternator and base, or the reverse | One half of the set is sound and well matched | Coupling, alignment, controls and approvals for the new pairing |
| Replace | New set to current norms, old set sold or exchanged | Worn or unsupported set, rating no longer fits, rules require newer engine | Installation work, outage during change-over |
Assessing condition properly
The assessment starts with evidence, not impressions. A set that looks tired can be mechanically sound, and a clean set can hide a worn engine. The checks below give a reliable picture in a few visits.
- Engine: running hours, oil consumption per hour, blow-by, compression test, smoke on load, oil analysis for wear metals and fuel or coolant contamination.
- Cooling and fuel: radiator condition, coolant analysis, injector performance, fuel system leaks, turbocharger shaft play.
- Alternator: insulation resistance and polarisation index, winding temperature on load, bearing condition, AVR behaviour and rotating diodes.
- Controls and switchgear: controller support and spares, protection settings, changeover condition, cable terminations under thermography.
- Performance: a load-bank test at the site rating, recording voltage, frequency, temperatures and fuel use.
The results are scored set by set. A sound engine and a sound alternator point towards continuing or retrofitting, a failed half points towards repowering, and widespread wear or obsolete support points towards replacement.
Does the set still fit the site?
Many replacement decisions are really sizing decisions. Loads change over the years: an office becomes a data room, a pump house gains larger motors, or a factory installs drives and air-conditioning. A set that was right twenty years ago may now be overloaded, or may run at very light load because the site has moved some equipment elsewhere. Logged demand data over a normal week, the largest motor start and the planned growth show whether the existing rating still fits. Retrofitting a set that is the wrong size only extends a poor arrangement.
Comparing the routes over their life
A fair comparison looks at the whole period the site needs the set, often ten years or more, rather than the first invoice. For each route, list the work now, the expected repairs and overhauls, fuel use at the real load, the maintenance of any added device, the residual value at the end, and the risk of a failure during an outage. Fuel often dominates for sets with many running hours, while reliability and compliance dominate for standby sets with few hours.
A worked illustration: two standby sets of the same rating each run about 100 hours a year. One has a sound engine with an approved device available, the other has high oil consumption and a controller with no spares. The first is a candidate for retrofit and continued service; the second is a candidate for replacement, with the old set sold or taken in part exchange after inspection.
When repowering makes sense
Repowering keeps the parts that are still good. A large alternator in sound condition may be paired with a new engine, or a sound engine with a new alternator after a winding failure. It can save time and cost compared with a complete new set, but only where the new pairing is approved by both makers, the coupling and torsional behaviour are checked, the base frame and mountings suit the new unit, and the controls are updated. The repowered set is commissioned and load-bank tested like a new one, and its emission category follows the new engine.
Keeping the site powered during the change
Retrofit, repower and replacement all take the set out of service for a time. For critical sites, a rental set connected through a prepared connection point and changeover carries the loads while the work is done. The rental rate covers the generator; transport is at actuals and in the customer scope, cable and an operator are extra if required, fuel is on the customer account, and every rental set is load-bank tested before dispatch. The changeover to the rental set is tested before the old set is disconnected, and again when the new or modified set returns.
Selling or exchanging the old set
An old set that is replaced may still have value. We buy used generators and take sets in part exchange across the range of 15 to 2000 kVA, with the value confirmed after inspection. Refurbished sets that we sell are load-bank tested and carry a six-month warranty, and used sets come with an inspection report, so a replaced set may find a new life where its duty and the rules allow.
The decision in steps
- Record the duty, running hours, load profile and the rules that apply to the set.
- Assess engine, alternator, controls and switchgear condition with tests, not impressions.
- Check whether the rating still fits the present and planned loads.
- Identify which routes are permitted and technically possible for that set.
- Compare the routes over the life the site needs, including fuel, reliability and residual value.
- Plan temporary power, approvals and commissioning for the chosen route.
- Record the decision and its reasons in the set file, and review it if rules or duty change.
How emission rules shape the choice
Rules on generator emissions differ by location, rating and the date a set was installed, and they change over time. Some allow older sets to continue unchanged, some require an approved retrofit device, some restrict running during particular periods, and some effectively require replacement with a set type-approved to current norms. The applicable rules for each set are confirmed from the official notifications for the location, and a dated copy is kept with the set records.
Where a retrofit device is the chosen route, its approval must cover the exact engine model, and its effect on back pressure is checked against the engine maker limit. Where replacement is chosen, the new set is selected for the site load and duty first, and then confirmed against the rules, so that compliance does not come at the cost of a poorly sized machine. A review each year, or whenever a new notification appears, keeps the decision current.
Signs that a decision is due
- Oil consumption or blow-by rising steadily between services.
- Repeated failures of the same component, or parts that take a long time to obtain.
- A controller or AVR model that is no longer supported, with no spares available.
- Smoke on load, falling output on a load-bank test or rising fuel use per kilowatt-hour.
- Loads that have grown beyond the rating, or shrunk so far that the set runs lightly loaded.
- A new emission notification that affects the set.
When two or more of these appear together, the assessment described above is worth carrying out before the next outage exposes the weakness.
Common mistakes
- Deciding on age alone.
- No load test.
- Comparing purchase price only.
- Retrofitting an undersized set.
What to send us
Send the set’s details, hours, records and today’s load. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The example is illustrative.
Questions engineers ask
What tests show whether a set is worth keeping?
Running hours, oil consumption, blow-by, compression and oil analysis for the engine; insulation resistance, bearing condition and AVR behaviour for the alternator; controller support and switchgear thermography; and a load-bank test at the site rating. Together they show whether to continue, retrofit, repower or replace.
What is repowering?
Repowering keeps one sound half of a set and replaces the other, such as a new engine on a good alternator. It can save time and cost, but the new pairing needs approval from both makers, checks of coupling and torsional behaviour, updated controls and full commissioning, including a load-bank test, before service.
How do I compare replacement and retrofit costs fairly?
Compare them over the whole period the site needs the set, including the work now, expected repairs and overhauls, fuel at the real load, maintenance of any added device, residual value and the risk of failure during an outage. Fuel dominates for long-running sets, reliability for standby sets.
Can my old set be sold or exchanged?
Often, yes. We buy used generators and take sets in part exchange in the range of 15 to 2000 kVA, with the value confirmed after inspection. Refurbished sets we sell are load-bank tested and carry a six-month warranty, and used sets come with an inspection report.
What age forces replacement?
There is no fixed age. Condition, running hours, parts availability, the rules that apply to the set and the cost of the upgrades it would need decide. A twenty-year-old set in good condition may be worth modernising, while a younger set that is worn, unsupported or the wrong size may be better replaced.
Can the alternator be reused?
Sometimes, after testing. The alternator is checked for insulation resistance, winding condition, bearing wear and excitation system health, and its rating is compared with the new engine. A sound alternator of the right rating can be reused with a new engine, but the coupling and alignment must suit the new combination.
Is rental needed during the work?
For critical sites, yes. A rental set connected through a prepared connection point and changeover carries the essential loads while the old set is removed and the new one installed and commissioned. Every rental set is load-bank tested before dispatch, and the changeover is tested before the old set is disconnected.
What about resale?
Include the residual value of the old set, if any, in the comparison. A set that is replaced may still have value for resale or part exchange, which reduces the net cost of replacement. We buy used generators and take sets in part exchange, with the value confirmed after inspection.
General guidance only. Values illustrative.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.