Hybrid Generator Modernisation

How to modernise an existing generator into a hybrid system: adding storage and converters, controls, load-following operation, protection, sizing, savings and the checks before conversion.

In short. Hybrid modernisation adds a battery, an inverter and a supervisory controller to an existing generator. The generator then runs fewer hours and at a better load. With charge-and-rest it may start several times a day, so the starting system needs attention. It works best where the generator spends long hours lightly loaded. It adds little where the set already runs near full load. The original generator must still be able to carry the critical load alone if the hybrid equipment fails.

Who this page is for: For owners of telecom sites, remote facilities and plants whose generators run long hours at light load.

Key facts

  • Log the load at short intervals for several weeks first.
  • Light-load running wastes fuel and causes wet stacking.
  • Charge-and-rest: the generator charges the battery at good load, then stops.
  • Fewer running hours do not stretch time-based service intervals.
  • Protection must suit the new inverter source.
  • Fallback to generator-only operation is essential.

Worked example: a telecom hub (illustrative)

ItemBeforeAfter hybrid retrofit
Generator125 kVA (100 kW)Same set
Base load15 kW, 20 hours a dayCarried by a 100 kWh battery between generator runs
Generator loading when running15%about 60% (load plus charging)
CycleContinuous light runningBattery about 5 h, then generator about 2 h to recharge
Generator hours a dayabout 20about 6

The set now runs a third of the hours at a healthy load, with far less wet stacking. See battery storage with generators and hybrid critical power.

Do not stretch oil change intervals beyond the engine maker’s time limit just because running hours fell. Oil ages with time as well as hours.

Where it fits

Works wellAdds little
Long light-load periodsConstant high load
Frequent short outagesRare standby use with steady load
Peaks well above averageLoad close to the set’s rating

Retrofit steps

  1. Log load for several weeks.
  2. Simulate control strategies on the log.
  3. Select battery, inverter and controller.
  4. Study protection and fault levels.
  5. Design fallback to generator-only operation.
  6. Commission and compare against the baseline.

Baseline sheet

ItemBeforeAfter
Generator hours a day  
Starts a day  
Fuel a month  
Average loading when running  

Checking the battery energy in the worked example

The figures in the telecom example hang together only if the battery energy, the charging losses and the generator loading are worked through, and doing so is the first test of any hybrid proposal.

StepWorkingResult
Energy taken from the battery in a 5 h rest period15 kW × 5 h75 kWh
Share of the 100 kWh battery used75 ÷ 10075% depth of discharge
Energy put back, allowing 90% round-trip efficiency75 ÷ 0.9about 83 kWh
Charging power over a 2 h run83 ÷ 2about 42 kW
Generator output while charging15 kW load + 42 kW chargingabout 57 kW, close to 60% of 100 kW
Cycles in a 20 h load day20 ÷ 7about 3, so about 6 generator hours

Two points follow. First, 75% depth of discharge every few hours is a heavy duty, so the battery chemistry and its cycle-life rating must suit roughly a thousand cycles a year; a battery chosen only on energy may reach its end-of-life capacity in a few years. Second, the charging power sets the inverter or charger rating. If the charger can accept only 25 kW, the generator runs longer at a lower load and much of the benefit disappears.

Starts, cycling and engine care

Charge-and-rest operation exchanges long light-load running for more frequent starts. Three starts a day is more than a thousand a year, which is far beyond what a standby set sees, and the parts that wear with starts need attention:

  • Starter motor and ring gear: check the duty rating with the engine maker and inspect at each service.
  • Starting batteries: size and maintain them for frequent cranking, separate from the hybrid battery.
  • Engine warm-up and cool-down: set a minimum run time so the engine reaches working temperature on each run, and keep the cool-down period before stopping.
  • Lubrication: each cold start is a wear event, so jacket-water heating may be worth keeping where the room is cool or the rest period is long.

Service intervals stay on the hours-or-months rule. Oil and filters are changed at 250 to 500 running hours or six months, whichever comes first, and coolant every year, even though the set now runs fewer hours.

Control strategy and integration

The supervisory controller decides when the generator starts and stops, and its settings decide whether the savings appear. The main settings are the battery state of charge at which the generator starts, the state of charge at which it stops, the maximum charging power, the minimum generator run time and the load at which the generator starts regardless of battery state.

The controller must work with the existing generator controller rather than around it. In practice that means the hybrid controller sends start and stop requests through the generator controller, which keeps all engine protection, and that the generator controller can be switched to run the load directly whenever the hybrid controller or inverter is out of service. The integration is agreed with the generator and inverter makers, and the interface signals, alarms and their actions are listed in a single document.

Fallback to generator-only operation

The hybrid equipment adds new ways to fail: an inverter fault, a battery management trip, a controller crash or a communication loss. None of these may take the load off. The fallback design answers three questions:

  • What happens to the load at the instant the inverter trips? Either the inverter has a bypass to the generator, or the load briefly loses supply while the generator starts and the transfer switch moves.
  • Can the generator carry the full load on its own, including the largest motor start, without the battery? It must, because that is the state the site is in during any hybrid fault.
  • Who is told, and how quickly? A fault alarm that goes nowhere leaves the set running at light load for weeks until someone notices the fuel use.

The fallback is tested at commissioning by tripping the inverter on load and again by isolating the battery, and the result is written into the handover file.

Protection with an inverter source

An inverter supplies a fault current of only about one to two times its rating for a short time, far less than a generator. Breakers set to clear faults from the generator may not trip at all when only the inverter is feeding, so the protection study covers both sources. Common remedies include protective devices chosen for the lower fault current, earth-fault detection that works on both sources, and settings that allow the inverter to hand over to the generator when a fault persists. The earthing of the inverter output, and how it is referenced when the generator is off, is part of the same study.

Measuring the result

The baseline sheet below is filled in before the retrofit and again after three months of operation, using the same metering. Fuel is measured by tank dip or flow meter at the same time each week, generator hours and starts are read from the controller, and battery energy throughput is taken from the battery management system. A result that matches the simulation within a few percent shows the controls are set correctly; a large gap usually means the charging power, the start and stop settings or the load profile differ from the design.

Sizing the battery and inverter from the load log

The load log, taken at one-minute or five-minute intervals over several weeks, sets three figures. The inverter rating must carry the highest load the battery is expected to supply alone, including motor starts if the generator is to stay off when a pump or air conditioner starts. The battery energy is the energy drawn during the chosen rest period at the typical load, divided by the usable depth of discharge, with an allowance for capacity loss over its life. The charger rating sets how quickly the energy goes back and therefore how long the generator runs.

A simulation on the logged data then tries several combinations of rest period, depth of discharge and charging power, and reports generator hours, starts and fuel for each. The chosen combination is usually not the one with the fewest generator hours, but the one that keeps starts reasonable and the battery inside its cycle-life rating.

OptionBatteryChargerGenerator hours a dayStarts a day
A60 kWh40 kWabout 85
B100 kWh45 kWabout 63
C200 kWh45 kWabout 62

In this illustrative comparison option C halves the starts of option B but doubles the battery for no further saving in hours, so option B is selected and the rest period is tuned on site.

Battery room and safety

The battery brings its own requirements: a room or enclosure with temperature control suited to the chemistry, ventilation where the chemistry can release gas, fire detection and suppression appropriate to the battery type, and isolation that lets the battery be made safe for maintenance. Lithium-ion batteries are supplied with a battery management system that must be connected to the supervisory controller so that a battery trip is handled as a planned fallback rather than a surprise. Clearances, access and the cable route between battery, inverter and generator panel are fixed at design stage, together with the earthing of the DC system.

Questions to settle with the supplier

  • Which battery chemistry is offered, and what cycle life does it have at the proposed depth of discharge and room temperature?
  • What charging power can the inverter or charger accept from the generator, and at what generator load does that put the set?
  • How does the hybrid controller start and stop the generator, and what does the generator controller still protect?
  • What happens to the load when the inverter, the battery or the controller fails, and how is the site alerted?
  • Who maintains the battery and inverter, and how is the result reported against the baseline?

Common mistakes

  • No load log before design.
  • No fallback.
  • Service intervals stretched.
  • Savings never measured.

What to send us

Send load logs and generator data. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Values are illustrative.

Questions engineers ask

How many starts a day does charge-and-rest operation add?

Usually two to five, depending on the battery size, the charging power and the load. Three a day is more than a thousand starts a year, so the starter motor, ring gear and starting batteries are checked against that duty, and a minimum run time is set so the engine reaches working temperature each time.

What happens to the load if the hybrid inverter trips?

That depends on the fallback design. Either the inverter has a bypass that transfers the load to the generator, or the load is briefly interrupted while the generator starts and the transfer switch moves. The generator must be able to carry the whole load alone, and the fallback is tested by tripping the inverter on load.

Can any generator be hybridised?

Most can, provided the generator controller accepts remote start and stop requests and can run the load directly when the hybrid equipment is out of service. The engine condition, the starter duty for frequent starts and the space for the battery and inverter are assessed first, and older controllers are often replaced as part of the retrofit.

Does it need paralleling?

It depends on the architecture. In a charge-and-rest design the battery inverter and the generator usually take turns, so no synchronising is needed. Where the inverter supports the generator during peaks or carries load while the generator charges, the two run in parallel and the controls, protection and maker approvals must cover that mode.

What savings?

Calculate them from the load profile. A simulation on several weeks of logged load gives generator hours, starts and fuel for each battery and charger combination, and the saving is then measured after three months of operation with the same metering as the baseline. Sites with long light-load periods save the most.

Is a study needed?

Yes. The inverter gives much less fault current than the generator, so breakers set for generator faults may not trip when only the inverter is feeding. A protection study covers both sources, the earthing of the inverter output and the fallback to generator-only operation, and its settings are proved at commissioning.

General guidance only. Values illustrative.